ELSONS MISHKAT-JV (PRIVATE) LIMITED

PROJECT Hangar Aviation Infrastructure / Hangar Gate System PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYDesign, fabrication and installation of a large push-pull aircraft hangar gate system for Bolari Air Base's aviation hangar facility.Client:Location:Value:Scope:Completion Year:Conulatant:Bolari Air BaseJamshoro$160,714Aircraft Hangar Gate Push & Pull, 47.25M x 16.6MAl Mansoor2020 VALUE DELIEVEREDPrecision engineering of a heavy movable gate spanning 47.25m x 16.6m, requiring accurate structural fabrication and smooth mechanical operation for aircraft clearance.Delivered a functional, durable hangar access solution enabling safe aircraft movement in and out of the facility.AVIATION FACILITY47.25M X 16.6M GATEPUSH-PULL MECHANISMSTRUCTURAL + MECHANICAL

PROJECT IBC Structure & Wolf SS Structure Industrial / Process Equipment Platform PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYDesign and construction of an IBC machine platform and stainless-steel Wolf structure to support plant process equipment.Client:Location:Value:Scope:Completion Year:Conulatant:Shan FoodKarachi$169,060IBC machine platform steel structure & SS Wolf structureCoolmax2021 VALUE DELIEVEREDCombined carbon-steel and stainless-steel fabrication requiring precise fit for equipment platforms within an active facility.Provided stable, code-compliant structural support for critical process equipment.PROCESS FACILITYCARBON + STAINLESS STEELMACHINE PLATFORMSTRUCTURAL FABRICATION

PROJECT Mezzanine Floor Industrial / Mezzanine Steel Structure PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC execution of a 140-ton steel mezzanine floor structure within an operating food manufacturing facility.Client:Location:Value:Scope:Completion Year:Conulatant:Shan FoodKarachi$233,036Steel mezzanine floor structure, total weight 140 MTCoolmax2021 VALUE DELIEVEREDHandling and erecting 140 metric tons of steel structure inside a live production plant, requiring careful sequencing and space- constrained lifting.Added usable elevated floor space for plant operations without disrupting ongoing production.FOOD MANUFACTURING140 MT STEEL STRUCTUREELEVATED MEZZANINE FLOORSTRUCTURAL FABRICATION

PROJECT Gate House Residential / Gate House Rehabilitation PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYRehabilitation and structural upgrade of an existing Gate House, combining new truss fabrication with large-scale repair works.Client:Location:Value:Scope:Completion Year:Conulatant:Bahair Town KarachiKarachi$285,714Rehabilitation of Gate House, new truss 80MT, repair 400MTBahira2021 VALUE DELIEVEREDRequired both new fabrication (80MT) and repair/retrofit of 400MT of existing structure, demanding careful assessment of aging steelwork alongside new construction.Restored structural integrity and extended service life of a key entrance facility for a major residential development.RESIDENTIAL GATEWAY480 MT STEEL WORKSTRUSS FAB + REPAIRSTRUCTURAL REHAB

PROJECT Shell Bahira Mart Commercial / Fuel Retail & Convenience Store PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYComplete EPC delivery of a Shell-branded fuel station and convenience store facility.Client:Location:Value:Scope:Completion Year:Conulatant:Shell - Meinhardt PakistantKarachi$335,714Shell Select Bahira Store and Fuel Station - complete EPC projectST Brothers2021 VALUE DELIEVEREDMulti-disciplinary EPC scope spanning civil, structural and fit-out works for a branded commercial fuel retail facility, coordinated to international brand standards.Delivered a fully operational branded retail fuel station meeting international quality and safety standards.FUEL RETAIL FACILITYSHELL SELECT STOREINTL. BRAND STANDARDCIVIL + STRUCT + FIT-OUT

PROJECT PEB Shed Industrial / Pre-Engineered Building Shed PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC construction of a large pre-engineered building (PEB) shed spanning 3,750 SQM.Client:Location:Value:Scope:Completion Year:Conulatant:U&I ProjectHUB$343,929PEB Shed, 57.8M x 64.9M - 3,750 SQMMishkat2022 VALUE DELIEVEREDLarge-span steel structure fabrication and erection (57.8m x 64.9m) requiring heavy crane operations and precise column/truss alignment.Delivered a large-scale industrial shed providing significant covered production/storage area.INDUSTRIAL PEB FACILITY3,750 SQM COVERED57.8M X 64.9M SPANSTRUCTURAL + CIVIL (EPC)

170 MT + CIVIL WORKSDUAL CRANES 10TSTRUCTURAL + CIVILPROJECT Marble Factory PEB Shed Industrial / Marble Processing Facility PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC construction of a marble factory PEB shed integrating civil works and overhead crane systems.Client:Location:Value:Scope:Completion Year:Conulatant:Primer StoneHUB$354,000PEB Shed, civil works, two overhead cranes (10T), building weight 170 MTMishkat2022 VALUE DELIEVEREDCombined civil and structural steel scope with dual 10T overhead crane integration, sized for heavy marble slab handling operations.Delivered an industrial facility purpose-built for marble processing and material handling.MANUFACTURING FACILITY

PROJECT Mezzanine Floor Industrial / Mezzanine Floor Addition PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC construction of a mezzanine floor within the large 3,750 SQM PEB shed built for U&I Project.Client:Location:Value:Scope:Completion Year:Conulatant:U&I ProjectHUB$558,884Mezzanine floor within 57.8M x 64.9M PEB Shed - 3,750 SQMMishkat2022 VALUE DELIEVEREDIntegration of an elevated mezzanine structure within an already large-span PEB shed, requiring coordinated load design and phased construction alongside the main shed works.Maximized usable floor area within the facility footprint, adding significant operational capacity.INDUSTRIAL PEB FACILITY3,750 SQM FOOTPRINTMEZZANINE FLOORSTRUCTURAL EXPANSION

WORKSHOP FACILITY352 MT STRUCTURAL STEELSTRUCTURAL + CRANEDUAL CRANES 10T+5TPROJECT NLC Workshop Landhi Industrial / Heavy-Lift Workshop Facility PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC delivery of a heavy industrial PEB workshop shed equipped with two overhead cranes.Client:Location:Value:Scope:Completion Year:Conulatant:NLC EngineersKarachi$754,286PEB Shed with two overhead cranes (10T & 5T), building weight 352 MTMishkat2022 VALUE DELIEVERED352 MT structural steel build integrated with dual overhead crane systems (10T & 5T), demanding precise crane-rail alignment and heavy-load structural design.Delivered a fully functional heavy-lift workshop facility supporting NLC's engineering operations.

PROJECT Fuel Storage Terminal Energy / Fuel Storage Terminal PROJECT OVERVIEW PROJECT DETAILComplete fabrication and installation of a major fuel storage terminal featuring high- capacity PMG and HSD tanks.Client:BycoPETROLEUM TERMINAL19,265 M.TON CAPACITYPMG+HSD TANKS+FIRE SYSFABRICATION + INSTALL EXECUTION COMPLEXITYLocation:Value:Scope:Completion Year:Conulatant:Shikarpur$ 2,983,571Heavy Structural SteelFayakoon2023 VALUE DELIEVEREDIntegrated complex civil infrastructure and Handled massive material volumes (19,265 M.Ton capacity) requiring precise engineering across multiple specialized tank structures.Boosted regional fuel storage reliability and distribution efficiency with a high-capacity terminal facility.

PROJECT KNB Entry Gate Infrastructure / Entry Gate Facility PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC delivery of a complete entry gate facility covering civil, structural, and electrical scope.Client:Location:Value:Scope:Completion Year:Conulatant:NLC EngineersHUB$155,734EPC complete entry gate - civil, structure, electricalMishkat2024 VALUE DELIEVEREDMulti-discipline coordination across civil, structural and electrical works for a fully functioning gate facility.Delivered complete, operational entry gate infrastructure for NLC's KNB site.SECURED ENTRY FACILITYCIVIL + STRUCT + ELEC.MULTI-DISCIPLINE EPCCOMPLETE GATE INFRA.

PROJECT PEB Shed Mining / Pre-Engineered Building Shed PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC construction of a PEB shed at the remote Reko Diq mining site.Client:Location:Value:Scope:Completion Year:Conulatant:REKO DEQBalochistan$214,286PEB Shed, 17M x 35M - 595 SQM, weight 24 TonELSON's2024 VALUE DELIEVEREDRemote-site logistics and construction in Balochistan's challenging Reko Deq terrain, requiring transport and erection of prefabricated steel components far from urban supply chains.Delivered essential covered infrastructure supporting operations at one of the region's major mining developments.REMOTE MINING SITE595 SQM / 24 TON17M X 35M PEB SHEDSTRUCTURAL (EPC)

PROJECT Platform Structure Defense / Radar Platform Structure PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYConstruction of an elevated equipment platform and allied services for a TPS radar installation atop a PAF airbase.Client:Location:Value:Scope:Completion Year:Conulatant:MES - Military Engineering ServicesSargodha$575,989Platform construction services for TPS Radar atop PAF baseMishkat2024 VALUE DELIEVEREDStructural platform construction at height on an active air force base, requiring coordination with defense security protocols and precision engineering to support sensitive radar equipment.Delivered mission-critical infrastructure supporting radar operations for national air defense.DEFENSE INFRASTRUCTURETPS RADAR PLATFORMELEVATED STRUCTURESTRUCTURAL + SERVICES

PROJECT Accomodation Camp Phase 4 Infrastructure / Workforce Accommodation Camp PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYEPC development of Phase 4 of an accommodation camp facility, including foundations, power termination and utility connections.Client:Location:Value:Scope:Completion Year:Conulatant:REKO DEQBalochistan$1,142,857Accommodation camp - foundation, power termination, utilitiesMishkat2024 VALUE DELIEVEREDFull-scope EPC camp development in remote Balochistan, integrating civil foundations, power infrastructure, and utility networks across an extensive camp footprint.Delivered essential workforce accommodation infrastructure supporting the Reko Diq project's operational workforce.WORKFORCE CAMPPHASE 4 DEVELOPMENTFOUNDATION+POWER+UTIL.CIVIL + MEP (EPC)

PROJECT Tower 20Mtr LG. Infrastructure / Telecom-Support Tower PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYFabrication, delivery and erection of a 20- meter steel tower at the Bagachi site.Client:Location:Value:Scope:Completion Year:Conulatant:REKO DEQBalochistan$172,857Providing & launching Tower 20Mtr Long at Bagachi SiteMishkat2025 VALUE DELIEVEREDPrecision fabrication and vertical launching of a tall steel tower structure at a remote mining- support site.Delivered critical tower infrastructure supporting Reko Diq site operations.MINING SUPPORT TOWER20M STEEL TOWERLAUNCH + ERECTIONFABRICATION + INSTALL

PROJECT Accomodation Camp Phase 5 Infrastructure / Workforce Accommodation Camp PROJECT OVERVIEW PROJECT DETAIL EXECUTION COMPLEXITYContinuation EPC development of Phase 5 of the Reko Diq accommodation camp facility.Client:Location:Value:Scope:Completion Year:Conulatant:REKO DEQBalochistan$1,371,429Accommodation camp - foundation, power termination, utilitiesMishkat2025 VALUE DELIEVEREDScaling up camp infrastructure delivery to a larger footprint than Phase 4, while maintaining consistent quality across remote- site foundation, power and utility works.Expanded accommodation capacity for the Reko Diq workforce - the company's second-largest project by value.WORKFORCE CAMPPHASE 5 DEVELOPMENTFOUNDATION+POWER+UTIL.CIVIL + MEP (EPC)