VIABILITY WORKSHOP D E S I G N & R E G U L A T I O N JULY 2024
Mark Gorton - Design Director Jo Cowen Architects Gregory Malek - Technical and Delivery Director Jo Cowen Architects Jo Cowen - CEO Jo Cowen Architects Chris Wilkinson - Managing Director Jo Cowen Architects PRESENTING TEAM SPEAKERS Dan Stock - Associate Director Jo Cowen Architects Paul Oliver - Partner Gardiner & Theobald Jon Eyles - Partner Gardiner & Theobald
VIABILITY LEGISLATION & STANDARDS ‘LANDSCAPE’
HIGH RISK / NON-HIGH RISK BS 9991 BUILDING SAFETY ACT PART B RICS vs IPMS CONSTRUCTION COSTS ESCAPE DISTANCES WORK STAGES CORE ARRANGEMENT BUILDING GATEWAY CONSTRUCTION ASSUMPTIONS LEVEL OF DETAIL
INFLATION / CONSTRUCTION COST BUILDING SAFETY ACT WALL TO FLOOR RATIO NET TO GROSS RATIO METHOD OF MEASUREMENT/ CONSTRUCTION ASSUMPTIONS GATEWAY / LEVEL OF DETAIL / WORK STAGES ‘MAJOR CHANGE’ HIGH RISK / NON-HIGH RISK BUILDING PART B & BS 9991 LOBBY ARRANGEMENT ESCAPE DISTANCES NUMBER OF LIFTS & STAIRS 321 Status: This version of this Act contains provisions that are prospective. Changes to legislation: There are currently no known outstanding effects for the Building Safety Act 2022. (See end of Document for details) Building Safety Act 2022 2022 CHAPTER 30 An Act to make provision about the safety of people in or about buildings and the standard of buildings, to amend the Architects Act 1997, and to amend provision about complaints made to a housing ombudsman. [28th April 2022] BE IT ENACTED by the Queen’s most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:— PART 1 INTRODUCTION 1 Overview of Act (1) This Act has 6 Parts, and contains provisions intended to secure the safety of people in or about buildings and to improve the standard of buildings. (2) Part 2 contains provision about the building safety regulator and its functions in relation to buildings in England. (3) Part 3 amends the Building Act 1984. (4) Amendments made by Part 3— (a) provide that the regulator is the building control authority in relation to higher- risk buildings in England, and (b) require the regulator (for England) and the Welsh Ministers (for Wales) to establish and maintain registers of building control approvers and building inspectors. (5) Part 4 is about occupied higher-risk buildings in England, and imposes duties on accountable persons. Volume 1: Dwellings Requirement B1: Means of warning and escape Requirement B2: Internal fire spread (linings) Requirement B3: Internal fire spread (structure) Requirement B4: External fire spread Requirement B5: Access and facilities for the fire service Regulations: 6(3), 7(2) and 38 APPROVED DOCUMENT B Fire safety The Building Regulations 2010 2019 edition incorporating 2020 and 2022 amendments – for use in EnglandO N L I N E V E R S I O N O N L I N E V E R S I O N London Plan Guidance Housing Design Standards June 2023 rics.org/guidance RICS professional statement GLOBAL/JANUARY 2018/RICS/RICS PS Confidence through professional standards RICS promotes and enforces the highest professional qualifications and standards in the development and management of land, real estate, construction and infrastructure. Our name promises the consistent delivery of standards – bringing confidence to the markets we serve. We accredit 125,000 professionals and any individual or firm registered with RICS is subject to our quality assurance. Their expertise covers property, asset valuation and real estate management; the costing and leadership of construction projects; the development of infrastructure; and the management of natural resources, such as mining, farms and woodland. From environmental assessments and building controls to negotiating land rights in an emerging economy; if our professionals are involved the same standards and ethics apply. We believe that standards underpin effective markets. With up to seventy per cent of the world’s wealth bound up in land and real estate, our sector is vital to economic development, helping to support stable, sustainable investment and growth around the globe. With offices covering the major political and financial centres of the world, our market presence means we are ideally placed to influence policy and embed professional standards. We work at a cross-governmental level, delivering international standards that will support a safe and vibrant marketplace in land, real estate, construction and infrastructure, for the benefit of all. We are proud of our reputation and we guard it fiercely, so clients who work with an RICS professional can have confidence in the quality and ethics of the services they receive. United Kingdom RICS HQ Parliament Square, London SW1P 3AD United Kingdom contactrics@rics.org Media enquiries pressoffice@rics.org Ireland 38 Merrion Square, Dublin 2, Ireland t +353 1 644 5500 f +353 1 661 1797 ricsireland@rics.org Europe (excluding UK and Ireland) Rue Ducale 67, 1000 Brussels, Belgium t +32 2 733 10 19 f +32 2 742 97 48 ricseurope@rics.org Middle East Office B303, The Design House, Sufouh Gardens, Dubai, UAE PO Box 502986 t +971 4 446 2808 ricsmiddleeast@rics.org Africa PO Box 3400, Witkoppen 2068, South Africa t +27 11 467 2857 f +27 86 514 0655 ricsafrica@rics.org Americas One Grand Central Place, 60 East 42nd Street, Suite #542, New York 10165 – 2811, USA t +1 212 847 7400 f +1 212 847 7401 ricsamericas@rics.org Latin America Rua Maranhão, 584 – cj 104, São Paulo – SP, Brasil t +55 11 2925 0068 ricsamericalatina@rics.org Oceania Suite 1, Level 9, 1 Castlereagh Street, Sydney NSW 2000, Australi
FIRE AD PART B VS BS9991 ADB - Lower Complexity -------------------------------------------------------------------- • 7.5m travel distance within common corridor (No ventilation to common corridor under 7.5m) • Ventilated Lobby/Lift Lobby (ADB) • Ventilated Stair (ADB) • Smoke Shafts (ADB) • Means of venting smoke and heat (ADB) • Natural Ventilation (under 30m in height) • Mechanical Ventilation (over 30m in height) BS9991 - Higher Complexity -------------------------------------------------------------------- • CFD modelling (BS9991) • Building height over 30m in height • Dry risers • Mechanical Ventilation (ADB/BS9991) • Mechanical Ventilation with Pressurisation (BS9991) -------------------------------------------------------------------- • CFD modelling (BS9991) • Building height over 50m in height • Wet Risers • Mechanical Ventilation (ADB/BS9991) Mechanical Ventilation with Pressurisation (BS9991) Associated Risks -------------------------------------------------------------------- • Cost Certainty • Compliance • Complexity • Commissioning • Maintenance Regime • Service Charges • Building Warranties • Building Insurance Flats - AD Part B Common Corridors - AD Part B
FIRE BUILDING HEIGHTS A “higher-risk building” means a building in England that: (a) is at least 18 metres in height or (b) has at least 7 storeys, and (c) contains at least 2 residential units. Measured from the lowest ground level to the upper-floor surface of the top floor. A firefighting shaft is measured to the upper storeys in any building with a storey more than 18m above fire service vehicle access level. Building Heights - AD Part B Building Regulations 2010 Approved Document B Volume 1, 2019 edition 145 In assembly buildings (purpose group 5), a gallery is included as a storey, but not if it is a loading gallery, fly gallery, stage grid, lighting bridge, or any gallery provided for similar purposes, or for maintenance and repair. In other purpose group buildings, galleries are not counted as a storey. For the definition of basement, see Appendix A. NOTES: 1. 2. 3. Basement Ground floor First floor Second floor Separated part two storeys Compartment wall Diagram D5 Number of storeys Plant Height of top storey measured from upper floor surface of top floor to ground level on lowest side of building Height of top storey excludes roof-top plant areas and any top storeys consisting exclusively of plant rooms Roof Diagram D6 Height of top storey in buildingO N L I N E V E R S I O N B5 See para 15.2 > 18m > 10m Buildings in which firefighting shafts should be provided, showing which storeys need to be served a. Any building The upper storeys in any building with a storey more than 18m above fire service vehicle access level b. Any building The basement storeys in any building with a basement more than 10m below fire service vehicle access level c. Any building The basement storey(s) in any building with two or more basements each exceeding 900m2 Fire service vehicle access level Two or more basement storeys each exceeding 900m2 Extent of firefighting lift Extent of firefighting stair NOTES: 1. Height excludes any top storey(s) consisting exclusively of plant rooms. 2. Firefighting shafts should serve all floors through which they pass. Diagram 15.2 Provision of firefighting shaftsO N L I N E V E R S I O N Building Regulations 2010 Approved Document B Volume 1, 2019 edition 131 BTable B4 Minimum periods of fire resistance Purpose group of building Minimum periods of fire resistance(1) (minutes) in a: Basement storey* including floor over Ground or upper storey Depth (m) of the lowest basement Height (m) of top floor above ground, in a building or separated part of a building More than 10 Up to 10 Up to 5 Up to 11 Up to 18 Up to 30 More than 30 1. Residential: a. Block of flats – without sprinkler system 90 min 60 min 30 min† 60 min+§ Not permitted(2) Not permitted(2) Not permitted(2) – with sprinkler system(3) 90 min 60 min 30 min† 60 min+§ 60 min+§ 90 min+ 120 min+ b. and c. Dwellinghouse Not applicable(4) 30 min*† 30 min† 60 min(5) 60 min(5) Not applicable(4) Not applicable(4) 2. Residential a. Institutional 90 min 60 min 30 min† 60 min 60 min 90 min 120 min‡ b. Other residential 90 min 60 min 30 min† 60 min 60 min 90 min 120 min‡ 3. Office: – without sprinkler system 90 min 60 min 30 min† 60 min 60 min 90 min Not permitted(6) – with sprinkler system(3) 60 min 60 min 30 min† 30 min† 30 min† 60 min 120 min‡ 4. Shop and commercial: – without sprinkler system 90 min 60 min 60 min 60 min 60 min 90 min Not permitted(6) – with sprinkler system(3) 60 min 60 min 30 min† 60 min 60 min 60 min 120 min‡ 5. Assembly and recreation: – without sprinkler system 90 min 60 min 60 min 60 min 60 min 90 min Not permitted(6) – with sprinkler system(3) 60 min 60 min 30 min† 60 min 60 min 60 min 120 min‡ 6. Industrial: – without sprinkler system 120 min 90 min 60 min 90 min 90 min 120 min Not permitted(6) – with sprinkler system(3) 90 min 60 min 30 min† 60 min 60 min 90 min 120 min‡ 7. Storage and other non- residential: a. any building or part not described elsewhere: – without sprinkler system 120 min 90 min 60 min 90 min 90 min 120 min Not permitted(6) – with sprinkler system(3) 90 min 60 min 30 min† 60 min 60 min 90 min 120 min‡O N L I N E V E R S I O N O N L I N E V E R S I O N
FIRE AD PART B VS BS9991 BS9991:2015 - Balconies and Decks Recommendations • The structure, including the floor, should be protected by 30 min fire-resisting construction (integrity and insulation). • The walking surface should be imperforate (i.e. there should be no holes or perforations in the structure so that users are protected from the effects of heat or smoke from below). • The sectional profile should be such that any fire plume breaking out of a flat or maisonette is directed outwards and upwards, and should be arranged such that smoke does not leak laterally along the soffit. Balconies should be as open as possible to allow for the dispersal of smoke originating in a flat. At least 50% of the vertical section should be open and the area of opening should be uniformly spread around the surface. The opening for ventilation should be at least between the top of the balustrade at 1.1 m and the soffit to the balcony above. • The soffit above a balcony or deck having a width of more than 2 m should be designed with down- stands placed at 90° to the face of the building (on the line of separation between individual flats or maisonettes). Down-stands should project 0.3 m to 0.6 m below any other beam or down-stand parallel to the face of the building, or should be determined by calculation. • NOTE 3 Suitable calculations are given in the BS 7346 series and BRE Report 368 [17]. • Where the balcony or deck is adjoined to the building wall only at the place where there is an entrance to a flat or maisonette, unless it is a minimum of 1.8 m away from the face of the building, it should, in the case of single direction escape routes, be proven by calculation that the escape route is not subjected to hazardous exposure levels or smoke-logging. • NOTE 4 Suitable calculations are given in the BS 7346 series and BRE Report 368 {17]. • Balconies providing a single direction of escape should be further safeguarded by the following provisions. • 1) The face of the building (excluding window openings) should provide at least 30 min fire resistance. • 2) Doors opening onto the balcony should be FD 30 self-closing doors. • 3) Window openings should not extend below a height of 1.1 m above the deck level. • 4) The external balustrade should be imperforate. • 5) Surface materials of the facing wall, balcony soffit and balustrade should be of a Class 0 rating. • g) The length of balconies should be such that no point in any flat or maisonette is more than 45 m from a rising main landing valve or the approach position of a fire appliance (measured along the fire-fighting route of access). Escape routes from Flats and Maisonettes with Deck Approach
LOBBY ARRANGEMENT CIBSE / VT REQUIREMENTS Vertical Transport requirements • Traffic simulation is based on Chartered Institute of Building Service Engineers (CIBSE) “Guide D 2020”. • The traffic analysis is based on “Standard” type accommodation. Lift Numbers, Arrangement & Waiting Time 2. Core arrangement with independent lobbies1. Core arrangement with interconnected lobbies The Building Regulations 2010 Insert new headings and paragraphs after Diagram 3.8 as follows. Design for vertical escape 3.28 The limits on horizontal travel escape distances mean most people should be able to independently travel from the flats to a storey exit and from there make their way to a final exit. See Section 15 for the provision of firefighting stairs in buildings. 3.29 Where evacuation lifts are provided, these should be located within an evacuation shaft containing a protected stairway, evacuation lift and evacuation lift lobby. An evacuation lift lobby should provide a refuge area for those waiting for the evacuation lift, have direct access to a protected stairway and not be directly accessible from any flat, maisonette, storage room or electrical equipment room. Number of common stairs 3.30 Flats should be served by more than one common stair if either of the following applies. a. The flat is on a storey that does not meet the criteria for a single escape route or a small single stair building (see paragraphs 3.27 and 3.32). b. The building has a top storey of 18m or more in height (see Diagram D6 in Appendix D). 3.31 Interlocked stairs should be considered as a single escape route and do not constitute an alternative means of escape. Page 30 Replace paragraph 3.33 with the following. 3.37 An escape route should not pass through one stair enclosure to reach an alternative exit. It may pass through a protected lobby (minimum REI 30) of one stair to reach an alternative exit. A protected lobby should not provide direct access to more than one stair. Replace paragraph 3.35 with the following. 3.39 Divide a common corridor connecting two or more storey exits with a fire doorsetO N L I N E V E R S I O N FF FFEVAC EVAC EVACEVAC
1 : 200 TYPICAL LAYOUT 1 1 : 200 TYPICAL LAYOUT Copy 1 2CORE 1 : 200 TYPICAL LAYOUT 150% 50% GLA DUAL ASPECT Dual Aspect Plan with set-backsGLA Dual Aspect Extracts Window to be located at least 50% along return elevation, therefore unit is dual aspect 50% 50% ‘Rectangular’ Plan London Plan Guidance Housing Design Standards June 2023 Window to be located at least 50% along return elevation, therefore unit is dual aspect
VIABILITY DESIGN APPROACH - MORDEN WHARF
MORDEN WHARF LONDON - GALLIARD HOMES 1500 UNITS Client Galliard and City Developments Limited (CDL) Scope of Work • Feasibility • Planning Particulars • 1500 homes • 1000+ BTR apartments • sqm of Commercial Space • Generous riverfront public park Storeys • 9 to 37 Site Area • Approx 5.9ha Density • Total 250-255 d/ha
MORDEN WHARF Masterplan SITE LAYOUT9 STOREYS9 STOREYS11 STOREYS11 STOREYS11 STOREYS11 STOREYS16 STOREYS26 STOREYS19 STOREYS31 STOREYS37 STOREYS22 STOREYS Total Number of Storeys • 202
Wind, Daylight, Proximity, Outlook MORDEN WHARF T01 T02 T03 T04 Environmental Performance and Design Quality Proposed Masterplan Concept Separation distances to improve daylight into landscape areas Parkside towers reduced wind funnelling and turbulence at cornersW E Riverside Buildings link provides wind protection B08 B09 T01 T03 T02 T04 B02 B03 B04 B05 B07 B01 Arrival Square 14 Building Setting Out and Relationship with the Context c.18c.18 c.20 c.18 c.18c.18 c.18 c.18 c.18 Proposed Masterplan Concept B01 Buildings 03 and 07 gantry accessed homes due to proximity to industrial site to the East Buildings separation to Enderby Place proposal to circa 18m Apartments main aspect to be placed circa 18m distant Buildings separation to distance set to circa 18m c.18 Riverside Buildings affords dual aspect to all homes c.18 D i s t a n c e t o i n d u s t r i a l s i t e B08 B09 T01 T03 T02 T04 B02 B03 B04 B05 B07 J O C O W E N A R C H I T E C T S 27 N Parkside Buildings Facade Development Carefully considered proportion of projecting amenity Fully enclosed balustrade with a raised cill height to overcome wind and overheating Partially enclosed balustrade to reduce the impact of wind, Juliette balcony to prevent overheating Open balustrade where wind isn’t an impact on comfort andFaçades are responsive to wind and microclimate, with ability DESIGN PRINCIPLES N Parkside Buildings Facade Development Fully enclosed balustrade with a raised cill height to overcome wind and overheating N J O C O W E N A R C H I T E C T S Parkside Buildings Facade Development Carefully considered proportion of projecting amenity provides both solar shading whilst allowing direct views out Fully enclosed balustrade with a raised cill height to overcome wind and overheating Partially enclosed balustrade to reduce the impact of wind, Juliette balcony to prevent overheating Open balustrade where wind isn’t an impact on comfort and fully height glazed windows to maximise daylight Façades are responsive to wind and microclimate, with ability for wind mitigation measures to be incorporated into the design early
1. Cruciform Plan GIA = 641 m2 (6900 ft2) NIA = 480 m2 (5167 ft2) External perimeter = 125 m FFL = 3.1 m External Wall Area = 388 m2 Wall to Floor Ratio = 0.60 (less efficient) Net to Gross = 75% 2. Octagonal Plan GIA = 659 m2 (7093 ft2) NIA = 496 m2 (5339 ft2) External perimeter = 97 m FFL = 3.1 m External Wall Area = 301 m2 Wall to Floor Ratio = 0.46 (more efficient) Net to Gross = 75% Cruciform vs Octagonal Layout MORDEN WHARF TYPICAL PLAN FORM
MORDEN WHARF Core Arrangement - Building Height Checks CORE ARRANGEMENT ANALYSIS STUDY A.1 2 x firefighting shafts with dividing corridor 2650mm x 2300mm lifts 15300 x 11300 155 sqm STUDY A.2 2 x firefighting shafts with dividing corridor 2500mm x 2050mm lifts 16450 x 11300 147 sqm STUDY B.1 2 x firefighting shafts with combined corridor 2650mm x 2300mm lifts 13450 x 12900 143 sqm STUDY B.2 2 x firefighting shafts with combined corridor 2500mm x 2050mm lifts 13450 x 12750 140 sqm 15300 16450 1130011300 12900 13450 12750 13450 STUDY A.1 2 x firefighting shafts with dividing corridor 2650mm x 2300mm lifts 15300 x 11300 155 sqm STUDY A.2 2 x firefighting shafts with dividing corridor 2500mm x 2050mm lifts 16450 x 11300 147sqm STUDY B.1 2 x firefighting shafts with conjoined lobbies 2650mm x 2300mm lifts 13450 x 12900 143sqm STUDY B.2 2 x firefighting shafts with conjoined lobbies 2500mm x 2050mm lifts 13450 x 12750 140sqm RISERS IN ACCORDANCE WITH AECOM PLANT SCHEDULE A Stair Pressurisation Shaft 1.0 m2 B Lift Pressurisation 1.5 m2 C Lift Lobby Pressurisation 1.0 m2 D Pressurisation Relief Shaft 1.0 m2 E Corridor Smoke Extract 1.5 m2 F Wet Riser 0970 x 600 mm G BCWS Riser 2000 x 400 mm H Electrical Riser 1800 x 400 mm I LTHW 0800 x 800 mm J Life Safety 0800 x 800 mm K Comms 0800 x 800 mm A A A A A A A B B B B B B A C C C C C C C C E E E E E EE E E F F F F F F F F G G G G H H H H I I I I JJ J J K K K K RISERS IN ACCORDANCE WITH AECOM PLANT SCHEDULE A Stair Pressurisation Shaft 1.0 m2 B Lift Pressurisation 1.5 m2 C Lift Lobby Pressurisation 1.0 m2 D Pressurisation Relief Shaft 1.0 m2 E Corridor Smoke Extract 1.5 m2 F Wet Riser 0970 x 600 mm G BCWS Riser 2000 x 400 mm H Electrical Riser 1800 x 400 mm I LTHW 0800 x 800 mm J Life Safety 0800 x 800 mm K Comms 0800 x 800 mm Z Spare Riser - RISERS IN ACCORDANCE WITH AECOM PLANT SCHEDULE A Stair Pressurisation Shaft 1.0 m2 B Lift Pressurisation 1.5 m2 C Lift Lobby Pressurisation 1.0 m2 D Pressurisation Relief Shaft 1.0 m2 E Corridor Smoke Extract 1.5 m2 F Wet Riser 0970 x 600 mm G BCWS Riser 2000 x 400 mm H Electrical Riser 1800 x 400 mm I LTHW 0800 x 800 mm J Life Safety 0800 x 800 mm K Comms 0800 x 800 mm RISERS IN ACCORDANCE WITH AECOM PLANT SCHEDULE A Stair Pressurisation Shaft 1.0 m2 B Lift Pressurisation 1.5 m2 C Lift Lobby Pressurisation 1.0 m2 D Pressurisation Relief Shaft 1.0 m2 E Corridor Smoke Extract 1.5 m2 F Wet Riser 0970 x 600 mm G BCWS Riser 2000 x 400 mm H Electrical Riser 1800 x 400 mm I LTHW 0800 x 800 mm J Life Safety 0800 x 800 mm K Comms 0800 x 800 mm D D D B B Z Z VENTILATION OF STAIRS, LOBBY, LIFTS, CORRIDOR VENTILATION OF STAIRS, LOBBY, LIFTS, CORRIDOR VENTILATION OF STAIRS, LOBBY, LIFTS, CORRIDOR VENTILATION OF STAIRS, LOBBY, LIFTS, CORRIDOR B02 B03 B04 B05 B07 B08 B09 T01 T03 T02 T04 0 Scale: 1: JCA Project No. Drawing Number Drawing Title Project Purpose of Drawing Rev Date General Notes Jo Cowen Architects t parties as the accurac Do not scale from this omissions or discrepa This work is copyright by any means; graphi permission in writing. © Jo Cowen Architect 100@A1 For Informatio MORDEN WHA T01-T04 Revis 0885-ZZ-ZZ-SK 0885 All dimension otherwise Risers in acc preliminary sc "240328 Ris Lifts in accord schedule: "Summary N Designs for in and are subje Ventilation st and MEP Eng P01 16/05/2024
MORDEN WHARF 10750 3950 1500 325 1800 200 700 825 700 750 9650 1100 1500 11800 1500 2100 3350 2300 2650 5450 2600 650 1500 4700 27102650 2300 2300 2250 4850 3790 11800 3300 7450 2995 610 345 1500 5300 10750 D H C E G A B F G H 1500 9000 1500 12750 2650 3200 1200 6000 26002600 1850 1800 905 2550 10751725 1245 5620 5705 1425 12750 H A E F G A DH C G 4880 4800 5620 6330 800 12750 550 1800 2765 1010 950 700 650 700 200 1800 475 700 450 5115 1010 2915 410 340 410 775 700 1075 B B02 B03 B04 B05 B07 B08 B09 T01 T03 T02 T04 1 : 50 T02 Core Study Option 1 1 1 : 50 T02 Core Study Option 2 2 CORE ARRANGEMENT ANALYSIS Core Arrangement - Typical Efficiency Checks 1. Separate Evacuation Shaft A protected shaft containing a protected stairway, an evacuation lift (together with its machine room) and evacuation lift lobbies. 2. Combined Evacuation Shaft A protected shaft containing a protected stairway, an evacuation lift (together with its machine room) and evacuation lift lobbies.
6 Amendments to the Approved Documents The Building Regulations 2010 Insert new headings and paragraphs after Diagram 3.8 as follows. Design for vertical escape 3.28 The limits on horizontal travel escape distances mean most people should be able to independently travel from the flats to a storey exit and from there make their way to a final exit. See Section 15 for the provision of firefighting stairs in buildings. 3.29 Where evacuation lifts are provided, these should be located within an evacuation shaft containing a protected stairway, evacuation lift and evacuation lift lobby. An evacuation lift lobby should provide a refuge area for those waiting for the evacuation lift, have direct access to a protected stairway and not be directly accessible from any flat, maisonette, storage room or electrical equipment room. Number of common stairs 3.30 Flats should be served by more than one common stair if either of the following applies. a. The flat is on a storey that does not meet the criteria for a single escape route or a small single stair building (see paragraphs 3.27 and 3.32). b. The building has a top storey of 18m or more in height (see Diagram D6 in Appendix D). 3.31 Interlocked stairs should be considered as a single escape route and do not constitute an alternative means of escape. Page 30 Replace paragraph 3.33 with the following. 3.37 An escape route should not pass through one stair enclosure to reach an alternative exit. It may pass through a protected lobby (minimum REI 30) of one stair to reach an alternative exit. A protected lobby should not provide direct access to more than one stair. Replace paragraph 3.35 with the following. 3.39 Divide a common corridor connecting two or more storey exits with a fire doorset fitted with a self-closing device (minimum E 30 Sa). See Diagram 3.8. Associated screens should be fire resisting. Doors should be positioned such that smoke does not affect access to more than one stair. Page 31 Replace paragraph 3.49 with the following. 3.53 Despite the provisions described, it is probable that some smoke will get into the common corridor or lobby from a fire in a flat. There should therefore be some means of ventilating the common corridors/ lobbies to control smoke and so protect the common stairs. This means of ventilation offers additional protection to that provided by the fire doors to the stair, as well as some protection to the corridors/lobbies.O N L I N E V E R S I O NO N L I N E V E R S I O N10750 3950 1500 325 1800 200 700 825 700 750 9650 1100 1500 11800 1500 2100 3350 2300 2650 5450 2600 650 1500 4700 27102650 2300 2300 2250 4850 3790 11800 3300 7450 2995 610 345 1500 5300 10750 D H C E G A B F G H 1500 9000 1500 1 : 50 T02 Core Study Option 1 1 10750 3950 1500 325 1800 200 700 825 700 750 9650 1100 1500 11800 1500 2100 3350 2300 2650 5450 2600 650 1500 4700 27102650 2300 2300 2250 4850 3790 11800 3300 7450 2995 610 345 1500 5300 10750 D H C E G A B F G H 1500 9000 1500 1 : 50 T02 Core Study Option 1 1 25m2 CORE ARRANGEMENT CORE ARRANGEMENT ANALYSIS Core Arrangement - Evacuation Lifts in London • London requirement for 2nd stair. • London requirement for 2nd evacuation lift. • Evacuation shaft is circa 25m2 or more depends on core arrangement. • Area of evacuation shaft core equates to minimum 2no. bed spaces lost on every floor. Working Example • 2 bed 4 person will become 1 bed 2 person or • 2x 1 bed 2 person will become 2x 1 bed 1 person For use in England This document contains amendments to the following Approved Document: Approved Document B: Fire safety Volume 1 – Dwellings Volume 2 – Buildings other than dwellings 2019 edition incorporating the 2020 and 2022 amendments Amendments to the Approved Documents The Building Regulations 2010 March 2024O N L I N E V E R S I O NO N L I N E V E R S I O N It is a London Plan requirement to provide evacuation lifts - Policy D5 (B5)
Typical Floor Plan to ADB + M4(2) DWFF BU FF BU DW DWFF BU FF BU DW DW FFBU FFBU DW DW FFBU FFBU DW 5.5 m2.4 m 2.4 m 5.5 m 1B2P-M4(2) 2B3P-M4(2) EVACUATION FIREFIGHTING VENTILATION L06-M4(2)-ADB-IPMS-ish MORDEN WHARF APPROVED DOCUMENT PART B WITH M4(2) APARTMENTS • 7.5m travel distance within common corridor (No ventilation to common corridor under 7.5m) • Ventilated Lobby/Lift Lobby (ADB) • Ventilated Stair (ADB) • Smoke Shafts (ADB) • Means of venting smoke and heat (ADB) • Natural Ventilation (under 30m in height) • Mechanical Ventilation (over 30m in height) --------------------------------------------------- • Building height over 30m • Dry risers • Mechanical Ventilation --------------------------------------------------- • Building height over 50m • Wet Risers • Mechanical Ventilation --------------------------------------------------- • Higher Cost Certainty • Easier Compliance • Lower Complexity • Easier Commissioning • Easier Maintenance Regime • Lower Service Charges • Lower Building Warranties Premium • Lower Building Insurance Premium Protected Corridor DWFF BU FF BU DW 5.5 m
DWFF BU FF BU DW DWFF BU FF BU DW DW FFBU FFBU DW DW FFBU FFBU DW 7.4 m5.2 m 8.3 m4.2 m 1B2P-M4(2) 2B3P-M4(2) EVACUATION FIREFIGHTING VENTILATION L05-BS9991-M4(2)-IPMS-ish DWFF BU FF BU DW 7.4 m Inner Rooms & Hob Radiation Zone MORDEN WHARF BRITISH STANDARD BS9991 WITH M4(2) APARTMENTS Typical Floor Plan to BS9991 + M4(2) • Ventilated Common Corridor • Ventilated Lobby/Lift Lobby • Ventilated Stair • Smoke Shafts • Mechanical Ventilation • Mechanical Ventilation with Pressurisation --------------------------------------------------- • CFD modelling • Building height over 30m • Dry risers • Mechanical Ventilation --------------------------------------------------- • CFD modelling • Building height over 50m • Wet Risers • Mechanical Ventilation --------------------------------------------------- • Lower Net to Gross Efficiency • Lower Cost Certainty • Difficult Compliance • Higher Complexity • Difficult Commissioning • Difficult Maintenance Regime • Higher Service Charges • Higher Building Warranties Premium • Higher Building Insurance Premium
VIABILITY DESIGN APPROACH - KIDBROOKE VILLAGE PHASE 5A & B
KIDBROOKE VILLAGE LONDON - BERKELEY HOMES 526 UNITS Client Berkeley Homes Ltd Scope of Work • Feasibility • Planning • Construction Particulars • 526 Apartments Total Site Area • Approx 1.15ha Density • 457 d/ha Planning Approval May 2024
OVERVIEW KIDBROOKE VILLAGE KIDBROOKE PARK ROADN A1 A2 B1 B2 B3 CATOR PARK MOL Quantum • 526 apartments Housing Mix • 1B2P 33% • 2B3P 24% • 2B4P 28% • 3B5P 14% • 3B6P 1% Number of Buildings • 5 Storeys • 9 to 15 Residential Areas • GIA 54,000 sqm / 581,251 sqft • NIA 38,520 sqm / 415,625 sqft Net to Gross • 71.3% Site Plan A Blocks entrance from Kidbrooke Park Road View of Buildings B1 and B2 from Cator Park
KIDBROOKE VILLAGE DESIGN PRINCIPLES Height and Massing
KIDBROOKE VILLAGE UP UP *Based on Semper's 'Kidbrooke Village Phase 5 Blocks A&B Planning Fire Statement "Q:\JCD ARCHITECTURE\0782_Kidbrooke Berkeley\In\Project Team\Semper [Fire]\2023-11-09_Planning Fire Statement_Draft 00\400985-Semper-PFS-KV5A&B-Rev00.pdf" M4(3) BS 9991 TYPICAL FLOOR PLAN Design • 10 Apartments per floor • Dual Aspect • LPG 2023 compliant Compliance • Higher-Risk Building • Route to compliance via BS9991 • Fire-fighting Stair • Fire-fighting Lift • Evacuation Stair • Evacuation Lift • Mechanical Ventilation • Wet Risers Typical Floor Plan to BS9991 RICS - Property Measurement 2nd Edition 2018 NIA 692.63 m2 GIA 888.25 m2 NET TO GROSS RATIO 78% GEA 948.39 m2 PERIMETER 144.74 m FFL TO FFL 3.075 m WALL AREA 445.08 m2 WALL TO FLOOR RATIO 50% 2B4P 88.18m2/950ft 2 1B2P 56.08m2/604ft 2 2B3P 76.64m2/825ft 2 2B3P 69.64m2/750ft 2 2B3P 76.64m2/825ft 2 2B3P 69.64m2/750ft 2 1B2P 56.08m2/604ft 2 1B2P 56.08m2/604ft 2 1B2P 56.08m2/604ft 2 2B4P 88.18m2/950ft 2 50% Window located at least 50% along return elevation, therefore unit is dual aspect 50%
KIDBROOKE VILLAGE OVERSHADOWING ASSESSMENT Overshadowing Assessment, BRE, Sun Exposure & Internal Daylight N0 Scale: 1: JCA Project No. Scale@A1 Scale@A3 Status Revision www.jocowenarchitects.com Drawing Number Purpose of Drawing Rev Date Description 5m 10m 100@A1 WIP Drawn by Checked by Drawing Title ProjectJo Cowen Architects take no responsibility for any information supplied by third parties as the accuracy of which cannot be guaranteed. Do not scale from this drawing. All dimensions should be checked on site. Any omissions or discrepancies should be reported in writing to Jo Cowen Architects. This work is copyright and cannot be reproduced, copied, or modified in any form or by any means; graphic electronic or mechanical, including photocopying without permission in writing. © Jo Cowen Architects - 2019 - All Rights Reserved 1 : 100 P08 FOR INFORMATION 0782-JCA-BB-ZZ-DR-A-70000 0782 S21:200 Kidbrooke Village Phase 5 Plots A & B Unit Layout Plans - B-Blocks 1 : 100 B-Blocks Setback Level - Layout Arrangement 21 : 100 B-Blocks Typical Level - Layout Arrangement 1 P05 04/10/2023 Option 32 - Updated GA & Unit Information OW JW P06 09/10/2023 Option 32 - Roof Plans OW JW P07 18/10/2023 Issue for Information OW JW P08 18/10/2023 Option 32 - GA Issue to Design Team OW JW 0.0 0.5 3.01.0 3.51.5 4.02.0 4.52.5 5+ DAYLIGHTING Daylight Factor Fig. 02: Floor Plan 01 November 2023 11 APPENDIX 1 - OVERSHADOWING ASSESSMENT BRE TEST <2 2+ BRE TEST - 21ST MARCH 88% 80% 0.0 0.5 3.01.0 3.51.5 4.02.0 4.52.5 5 SUN EXPOSURE - TOTAL HOURS 5.5 6.0+ APPENDIX 2 - OVERSHADOWING ASSESSMENT SUN EXPOSURE - 21ST MARCH (REPRESENTATIVE OF SEPTEMBER) CHARTERED SURVEYORS APPENDIX 1 - OVERSHADOWING ASSESSMENT BRE TEST <2 2+ BRE TEST - 21ST MARCH 13 JULY 2023 / REF/14322 2/6 88% 80% 83% CHARTERED SURVEYORS 0.0 0.5 3.01.0 3.51.5 4.02.0 4.52.5 5 SUN EXPOSURE - TOTAL HOURS 5.5 6.0+ APPENDIX 2 - OVERSHADOWING ASSESSMENT SUN EXPOSURE - 21ST MARCH (REPRESENTATIVE OF SEPTEMBER) 13 JULY 2023 / REF/14322 3/6 In-house Capability • Overshadowing Assessment • BRE Test Assessment • Sun Exposure Assessment • Internal Daylight Assessment
VIABILITY DESIGN APPROACH - OXFORD GARDENS
OXFORD GARDENS BOURNEMOUTH - MARCHMONT 487 UNITS Client Peveril Securities / Marchmont Scope of Work • Feasibility • Planning Particulars • 487 BTR Apartments • 93 sqm of Commercial Space • 430 sqm of Co-Working • 83 sqm of Food and Beverage Cafe Storeys • 20 to 29 Site Area • Approx. 0.44ha Density • Total 1,106 d/ha Planning Approval December 2023 View from Oxford Road
OXFORD GARDENS MIXED-USE DEVELOPMENT OXFORD ROAD ST PAUL'S PLACE ST PAUL'S LANE GYM COMMERCIAL ENTRANCE CAFE 11 13 14 12 RETAIL 15 11 12 14 15 16 MANAGEMENT SUITE 13 16 93m² Commercial Space 430m² Co-working Space 85m² Food and Beverage OXFORD ROAD ST PAUL'S PLACE ST PAUL'S LANE N D S S - 37 s q m Stu d io - 1 Pe r s o n 52 11% N D S S - 8 6 s q m 3 B e d 5 Pe r s o n 3 0 6% N D S S - 70 s q m 2 B e d 4 Pe r s o n 147 3 0 % N D S S - 6 3 s q m 2 B e d 3 Pe r s o n 50 10 % 1 B e d 2 Pe r s o n 20 8 4 3% N D S S - 5 0 s q m Ty pic al Floor Pla n 487 high quality homes Grou nd Floor Pla n
OXFORD GARDENS DESIGN PRINCIPLES Height and Massing 1. No GLA Approach • Less policy-driven • Design more varied 2. Lower Market Value • Need for increased viability • Minimum design requirements applied N 20 N Height & Massing Development Analysis Early massing was tested in context using 3D modelling to gain an understanding of both the immediate streetscape and wider more contextual townscape views. Our initial studies sought to test our brief requirements in a simplistic extruded form, to see how this appears from the north & south of Oxford Road and slightly wider views from Wessex Way and the railway bridge on Holdenhurst Road. It became apparent through early investigations that a single block form would be unsuitable and articulation in height would be required to break down the proposed mass. 04. DESIGN PRINCIPLES 4.4 APPROACH TO HEIGHT AND MASSING Waverly House 24 24 N Distribution of Height The significant size of the site presented an opportunity for two separated structures to be defined, whilst designing in consideration of daylight/sunlight and overlooking offset requirements between the two. By offsetting a portion of the building mass to define these two taller structures the connecting portion of the building could drop considerably lower, affording a significant level of visual separation at the centre of the scheme. The taller elevations front onto the public realm, allowing the space to benefit from large levels of direct sunlight from the south (midday sun) whilst defining a clear focal point to the development on Oxford Road. 04. DESIGN PRINCIPLES 4.4 APPROACH TO HEIGHT AND MASSING Waverly House N 29 21 13 Adjusting Proportions The massing, originally split into 3 main constituent parts, including two taller separated structures connected via a lower link block are further adjusted to better respond to the surrounding context. Reappropriating some of the height from the southernmost structure to the north helps give hierarchy to the overall building form, with the highest point being reinforced on Oxford Road. Lowering the southern structure also helps with sunlight penetration to the rest of the development throughout the day. The stepping in heights, developed in tandem with The Townscape Consultancy through their wider townscape modelling analysis, help define the development on the Lansdowne skyline, with the individual building elements being clearly defined with sky between, responding to the height of the immediate surrounding buildings. A plinth has also been introduced to create a more defined base to the building, with the double height ground floor / mezzanine levels being set back to allow the two taller structures to have a clear connection to ground. Colonnades are introduced to the base of the tall structures, tying into the streetscape already established by the colonnade at Bailey Point. The height and alignment of the colonnades match that already defined by Bailey Point to create a more ordered street frontage so poorly lacking in the existing building. In turn, the colonnades providing a sheltered pedestrian thoroughfare in addition to the already widened pavements zones. 04. DESIGN PRINCIPLES 4.4 APPROACH TO HEIGHT AND MASSING Waverly House 59J O C O W E N A R C H I T E C T S B. REAR/CAR PARK ELEVATION (WEST) 20 29 20 8 14 12 OXFORD GARDENS SITE BOUNDARY BAILEY POINTCRANBORNE HOUSEAVALON ASDA SUPERMARKET ST PAUL’S ROAD TRAIN STATION TRAIN STATION WAITING ZONE 22 GATEWAY BUILDING 10m 20m 30m 40m 50m 60m 70m OXFORD GARDENS SITE BOUNDARY 14 29 4 10 BAILEY POINT CAR PARK AVALONST PAUL’S PLACE ST PAUL’S LANE ST PAUL’S ROAD MULTI STOREY CAR PARK TRAIN STATION CHESIL HOUSE 22 SPACE HOUSE 13 12 TRAIN STATION WAITING ZONE A. OXFORD RD ELEVATION (EAST) 80m 90m 100m A B 19 +106m AOD +134m AOD +85m AOD+102.15m AOD+86m AOD+121m AOD +37m AOD = 0m 10m 20m 30m 40m 50m 60m 70m 80m 90m 100m +37m AOD = 0m +134m AOD +106m AODTHE HELMSKYLINE 19 17 17 17 25 21 21 25+121m AODWAVERLEY HOUSE (PENDING APPROVAL) (DOTTED BEHIND)WAVERLEY HOUSE (PENDING APPROVAL)+102.15m AOD+86m AOD+86m AOD+86m AODTHE HELM (DOTTED BEHIND)OXFORD POINT (DOTTED BEHIND)OXFORD POINT (DOTTED BEHIND)SKYLINE (DOTTED BEHIND)95 - 101 HOLDENHURST (PENDING APPROVAL) (DOTTED BEHIND)95 - 101 HOLDENHURST (PENDING APPROVAL) 17 04. DESIGN PRINCIPLES 4.4 APPROACH TO HEIGHT AND MASSING
45.21 m² Studio C3.01.02 42.88 m² Studio C3.01.03 44.33 m² Studio C3.01.04 50.53 m² 1B2P C3.01.08 50.31 m² 1B2P C3.01.09 50.01 m² 1B2P C3.01.06 50.72 m² 1B2P C2.01.01 50.87 m² 1B2P C1.01.09 51.26 m² 1B2P C3.01.01 66.75 m² 2B3P C2.01.02 71.63 m² 2B4P C1.01.08 50.64 m² 1B2P C1.01.01 71.94 m² 2B4P C2.01.06 91.69 m² 3B5P C2.01.07 Lift 1 Lift 2 Lift 1 Lift 2 Lift 3 Lift 1Lift 2 50.38 m² 1B2P C2.01.04 50.63 m² 1B2P C1.01.06 66.45 m² 2B3P C1.01.05 71.40 m² 2B4P C2.01.03 71.40 m² 2B4P C1.01.07 71.35 m² 2B4P C2.01.05 50.03 m² 1B2P C1.01.03 67.59 m² 2B3P C1.01.04 70.09 m² 2B4P C1.01.02 65.68 m² 2B3P C3.01.05 86.02 m² 3B5P C3.01.07 KEY 1B2P 2B3P 2B4P 3B5P Studio N 10m 20m Scale 1:200@A1 0m JCA Project No. Scale@A1 Scale@A3 Status Revision www.jocowenarchitects.com Drawing Number Drawing Title Project Purpose of Drawing Revision Date Description General Notes site. Any omissions or discrepancies should be reported in writing to Jo Cowen Architects. This work is copyright and cannot be reproduced, copied, or modified in any form or by any means; graphic electronic or mechanical, including photocopying without permission in writing. © Jo Cowen Architects - 2019 - All Rights Reserved 1 : 200 01 Planning Application 0825 OXFORD GARDENS AREA PLAN - LEVEL 01 0825-JCA-ZZ-01-DR-A-06503 0825 1:400 01 07/10/2022 Planning Submission BU FFDW DW BUFF BU BU BU FF BU BU BU BU FF FF DW BU BUBU BU BU FFBUBU DW BU BU FF BU DW BU FF BU BU BUFF BU BU BUBU DW BU FF BU BU FF BU BU BU BU FFBU BU DW BU BU DW BU DW BUFF BU BU DWBU FFBUBU DW BUFF BU BU DW DWBU FFBUBU DW BUFF BU BU DW BUFF BU BU DW BUFF BU BU DW BUFF BU BU DWBU FFBUBU DWBU FFBUBU DW BU FF BU BUDW BU FF BU BUDW BU BUBU BUBU BU DW DW BU DWFF BUBU BU BU BU BU BU FF BU DW 61.47 m² / 662 ft² 2B3P C1.02.01 Bathroom Type Side Access Shower Type Head On 86.00 m² / 926 ft² 3B5P C1.02.02 Bathroom Type Side Access Shower Type Head On 70.20 m² / 756 ft² 2B4P C1.02.03 Bathroom Type Head On Shower Type Side Access 50.55 m² / 544 ft² 1B2P C1.02.04 Shower Type Head On 50.17 m² / 540 ft² 1B2P C1.02.06 Shower Type Head On 50.67 m² / 545 ft² 1B2P C1.02.07 Shower Type Head On 50.67 m² / 545 ft² 1B2P C1.02.08 Shower Type Head On 50.67 m² / 545 ft² 1B2P C1.02.09 Shower Type Head On 50.45 m² / 543 ft² 1B2P C1.02.10 Shower Type Head On 50.47 m² / 543 ft² 1B2P C1.02.14 Shower Type Head On 50.02 m² / 538 ft² 1B2P C2.02.06 Shower Type Head On 50.25 m² / 541 ft² 1B2P C2.02.08 Shower Type Head On 50.36 m² / 542 ft² 1B2P C2.02.10 Shower Type Head On 70.36 m² / 757 ft² 2B4P C2.02.12 Bathroom Type Side Access Shower Type Side Access 75.47 m² / 812 ft² 2B4P C2.02.11 Bathroom Type Head On Shower Type Side Access 70.15 m² / 755 ft² 2B4P C2.02.09 Bathroom Type Head On Shower Type Side Access 69.82 m² / 752 ft² 2B4P C2.02.05 Shower Type Head On 71.99 m² / 775 ft² 2B4P C2.02.04 Bathroom Type Head On Shower Type Side Access 70.83 m² / 762 ft² 2B4P C1.02.13 Bathroom Type Head On Shower Type Side Access 70.82 m² / 762 ft² 2B4P C1.02.12 Bathroom Type Head On Shower Type Side Access 61.42 m² / 661 ft² 2B3P C2.02.01 Bathroom Type Side Access Shower Type Head On 61.78 m² / 665 ft² 2B3P C1.02.05 Bathroom Type Side Access Shower Type Side Access 86.86 m² / 935 ft² 3B5P C2.02.03 Bathroom Type Head On Shower Type Side Access 44.28 m² / 477 ft² 1B1P C1.02.11 Shower Type Side Access 44.73 m² / 481 ft² 1B1P C2.02.02 Shower Type Side Access 44.30 m² / 477 ft² 1B1P C2.02.07 Shower Type Side Access 75.07 m² / 808 ft² Residential access 01 02 03 04 11 10 09 A13 A13 A12 A12 A11 A11 A10 A10 A9 A9 A8 A8 A7 A7 A6 A6 A5 A5 A4 A4 A3 A3 A2 A2 A1 A1 A0 A0 05 06 07 16.74 m² / 180 ft² Core A EVAC Stairs 17.20 m² / 185 ft² Core A EVAC Stairs 5.70 m² / 61 ft² Core A FF/EVAC 5.70 m² / 61 ft² Core A EVAC 5.79 m² / 62 ft² Core A EVAC 11.21 m² / 121 ft² Core A Lift Lobby 14.69 m² / 158 ft² Core B FF/EVAC Stairs 5.90 m² / 63 ft² Core B FF/EVAC 5.80 m² / 62 ft² Core B EVAC 5.80 m² / 62 ft² Core B Lift 7.17 m² / 77 ft² Core B Lift Lobby 16.03 m² / 173 ft² Core B EVAC Stairs 20.03 m² / 216 ft² Residential access 48.35 m² / 520 ft² Residential access 6.16 m² / 66 ft² Cleaners Cpd OXFORD GARDENS CORE ARRANGEMENT 3 Cores / 7 Lifts vs 2 Cores / 6 Lifts NO. OF UNITS 474 NO. OF UNITS PER FLOOR 25 GEA 2,174.40 m2 (23,405 ft2) GIA 2,009.83 m2 (21,634 ft2) NIA 1,533.23 m2 (16,504 ft2) NET TO GROSS 76% PERIMETER (EXTERNAL WALL) 315m FFL TO FFL 3.025m EXTERNAL WALL AREA 954m2 WALL TO FLOOR RATIO 0.48 (less efficient) NO. OF BALCONIES 173 NO. OF CORES 3 NO. OF LIFTS 7 NO. OF STAIRS 5 NO. OF PODS 670 SLAB TYPE Reinforced Concrete 2022 SCHEME NO. OF UNITS 487 NO. OF UNITS PER FLOOR 26 GEA 2,162.76 m2 (23,279 ft2) GIA 2,030.12 m2 (21,852 ft2) NIA 1,564.75 m2 (16,842 ft2) NET TO GROSS 77% PERIMETER (EXTERNAL WALL) 292m FFL TO FFL 2.950m EXTERNAL WALL AREA 862m2 WALL TO FLOOR RATIO 0.42 NO. OF BALCONIES 15 NO. OF CORES 2 NO. OF LIFTS 6 NO. OF STAIRS 4 NO. OF PODS 712 SLAB TYPE Post-Tensioned 2024 SCHEME
*Based on Hoare Lea's 'Oxford Gardens Fire Engineering Stage 3 Fire Strategy Report REV04-24/04/2024' "Q:\JCD ARCHITECTURE\0825_Holland House Bournemouth\In\Project Team\Hoare Lea (Services Consultant)\HL Fire \2024-04-24_STAGE 3 INTERIM FIRE STRATEGY REPORT_Rev 04\REP-1922225-5A-SaB-20220420-Fire Strategy-Rev 04.pdf" BS 9991 OXFORD GARDENS TYPICAL FLOOR PLAN Typical Floor Plan to BS9991 RICS - Property Measurement 2nd Edition 2018 NIA 1564.75 m2 GIA 2030.12 m2 NET TO GROSS RATIO 77% GEA 2162.76 m2 PERIMETER 292.16 m FFL TO FFL 2.95 m WALL AREA 861.87 m2 WALL TO FLOOR RATIO 42.45% 1B2P 50.55m2/544ft 2 2B4P 70.20m2/756ft 2 3B5P 86m2/926ft 2 2B3P 61.47m2/662ft 2 1B2P 50.47m2/543ft 2 2B3P 61.78m2/665ft 2 1B2P 50.17m2/540ft 2 1B2P 50.67m2/545ft 2 1B2P 50.67m2/545ft 2 1B2P 50.67m2/545ft 2 1B2P 50.45m2/543ft 2 1B1P 44.28m2/477ft 2 2B4P 70.83m2/762ft 2 2B4P 70.82m2/762ft 2 1B1P 44.73m2/481ft 2 2B3P 61.42m2/661ft 2 2B4P 70.36m2/757ft 2 2B4P 75.47m2/842ft 2 1B2P 50.36m2/542ft 2 2B4P 70.15m2/755ft 2 1B1P 44.30m2/477ft 2 1B2P 50.45m2/541ft 2 1B2P 50.02m2/538ft 2 2B4P 71.99m2/775ft 2 3B5P 86.86m2/935ft 2 2B4P 70.20m2/756ft 2 Design • 26 Apartments per floor • Dual Stair Compliance • Higher-Risk Building • Route to compliance via BS9991 • Fire-fighting Stair • Fire-fighting Lift • Evacuation Stair • Evacuation Lift • Mechanical Ventilation • Wet Risers
VIABILITY METHOD OF MEASUREMENT
PROPERTY MEASUREMENT RICS VS IPMS RICS COMP 6th Edition vs RICS IPMS Based 2nd Edition WINDOWS WINDOWS rics.org/guidance RICS guidance note RICS professional standards and guidance, Global Code of measuring practice 6th edition, May 2015 rics.org/guidance RICS guidance note RICS professional standards and guidance, Global Code of measuring practice 6th edition, May 2015 rics.org/guidance RICS professional statement GLOBAL/JANUARY 2018/RICS/RICS PS Confidence through professional standards RICS promotes and enforces the highest professional qualifications and standards in the development and management of land, real estate, construction and infrastructure. Our name promises the consistent delivery of standards – bringing confidence to the markets we serve. We accredit 125,000 professionals and any individual or firm registered with RICS is subject to our quality assurance. Their expertise covers property, asset valuation and real estate management; the costing and leadership of construction projects; the development of infrastructure; and the management of natural resources, such as mining, farms and woodland. From environmental assessments and building controls to negotiating land rights in an emerging economy; if our professionals are involved the same standards and ethics apply. We believe that standards underpin effective markets. With up to seventy per cent of the world’s wealth bound up in land and real estate, our sector is vital to economic development, helping to support stable, sustainable investment and growth around the globe. With offices covering the major political and financial centres of the world, our market presence means we are ideally placed to influence policy and embed professional standards. We work at a cross-governmental level, delivering international standards that will support a safe and vibrant marketplace in land, real estate, construction and infrastructure, for the benefit of all. We are proud of our reputation and we guard it fiercely, so clients who work with an RICS professional can have confidence in the quality and ethics of the services they receive. United Kingdom RICS HQ Parliament Square, London SW1P 3AD United Kingdom contactrics@rics.org Media enquiries pressoffice@rics.org Ireland 38 Merrion Square, Dublin 2, Ireland t +353 1 644 5500 f +353 1 661 1797 ricsireland@rics.org Europe (excluding UK and Ireland) Rue Ducale 67, 1000 Brussels, Belgium t +32 2 733 10 19 f +32 2 742 97 48 ricseurope@rics.org Middle East Office B303, The Design House, Sufouh Gardens, Dubai, UAE PO Box 502986 t +971 4 446 2808 ricsmiddleeast@rics.org Africa PO Box 3400, Witkoppen 2068, South Africa t +27 11 467 2857 f +27 86 514 0655 ricsafrica@rics.org Americas One Grand Central Place, 60 East 42nd Street, Suite #542, New York 10165 – 2811, USA t +1 212 847 7400 f +1 212 847 7401 ricsamericas@rics.org Latin America Rua Maranhão, 584 – cj 104, São Paulo – SP, Brasil t +55 11 2925 0068 ricsamericalatina@rics.org Oceania Suite 1, Level 9, 1 Castlereagh Street, Sydney NSW 2000, Australia t +61 2 9216 2333 f +61 2 9232 5591 oceania@rics.org Greater China (Hong Kong) 3707 Hopewell Centre, 183 Queen’s Road East Wanchai, Hong Kong t +852 2537 7117 f +852 2537 2756 ricseastasia@rics.org Greater China (Shanghai) Room 4707-4708, 47/F Plaza 66, Tower 1, No. 1266, Nanjing Road West, Jing’an District, Shanghai, 200041, China t +86 21 5243 3090 f +86 21 5243 3091 ricschina@rics.org Japan Level 14 Hibiya Central Building, 1-2-9 Nishi Shinbashi Minato-Ku, Tokyo 105-0003, Japan t +81 3 5532 8813 f +81 3 5532 8814 ricsjapan@rics.org ASEAN #27-16, International Plaza, 10 Anson Road, Singapore 079903 t +65 6812 8188 f +65 6221 9269 ricsasean@rics.org South Asia GF-17, Ground Floor, Block B, Vatika Atrium, Sector 53 Gurgaon, Haryana 122002, India t +91 124 459 5400 f +91 124 459 5402 ricsindia@rics.org RICS professional standards and guidance, Global RICS property measurement 2nd edition, January 2018 rics.org/guidance RICS professional statement GLOBAL/JANUARY 2018/RICS/RICS PS Confidence through professional standards RICS promotes and enforces the highest professional qualifications and standards in the development and management of land, real estate, construction and infrastructure. Our name promises the consistent delivery of standards – bringing confidence to the markets we serve. We accredit 125,000 professionals and any individual or firm registered with RICS is subject to our quality assurance. Their expertise covers property, asset valuation and real estate management; the costing and leadership of construction projects; the development of infrastructure; and the management of natural resources, such as mining, farms and woodland. From environmental assessments and building controls to negotiating land rights in an emerging economy; if our professionals are involved the same standards and ethics apply. We believe that standards underpin effective markets. With up to seventy per cent of the world’s wealt
MORDEN WHARF TYPICAL FLOORPLAN - NIA NIA-ADB-IPMS= 536.04 m2/ 5770 ft2 NIA-ADB-IPMS-L04 Level Area (m2) Area (ft2) Level 04 82.55 889 Level 04 51.46 554 Level 04 51.46 554 Level 04 82.55 889 Level 04 82.55 889 Level 04 51.46 554 Level 04 51.46 554 Level 04 82.55 889 Grand total: 8 536.04 5770 ADB RICS - Property Measurement 2nd Edition 2018 NIA 536.04m536.04m22 GIA 716.28m2 NET TO GROSS RATIO 74.8%74.8% ADB RICS - Code of Measuring Practice 6th Edition 2015 NIA 523.43m2 GIA 703.99m2 NET TO GROSS RATIO 74.4% BS9991 RICS - Property Measurement 2nd Edition 2018 NIA 527.09m2 GIA 716.28m2 NET TO GROSS RATIO 73.6% BS9991 RICS - Code of Measuring Practice 6th Edition 2015 NIA 514.77m2514.77m2 GIA 703.99m2 NET TO GROSS RATIO 73.1%73.1% Net Internal Area (NIA) 2B3P 80.6m2/868ft 2 2B3P 80.6m2/868ft 2 2B3P 80.6m2/868ft 2 2B3P 80.6m2/868ft 2 1B2P 50.2m2/540ft 2 1B2P 50.2m2/540ft 2 1B2P 50.2m2/540ft 2 1B2P 50.2m2/540ft 2
VIABILITY QUANTITIES REPORTING
DW DW DW DW DW DW DW 2 2 DW H 2 2 2 DW DW DW DW DW DW DW DW DW 70351 2 3 2B4P 500 600 600 600600600600600 3375 2075 Kitchen Type 01 70352 2 3 2B4P 500600600600600300 500600 1575 3575 Kitchen Type 02 2 70353 2 Studio 600300600600600600300 3600 Kitchen Type 03 70354 2 3 2B4P 600400350600600 600600 1575 2925 Kitchen Type 04 70355 2 3 1B2P 250600600300600600 600 3325 1125 Kitchen Type 05 2 70356 2 1B2P M4(3) 600330600600600600200600200 4330 1800 400800600 2200 Kitchen Type 06 70357 2 3 2B4P M4(3) 600500600600200600 600600300 400 800 600 1800 1874.85 2200 Kitchen Type 07 70358 2 3 4 200 600 600 399.7600600 600 600 600 2275 1775 2350 Kitchen Type 08 70359 3 2 1B2P 600 600600600600600600 975 4075 Kitchen Type 09 600600600600600600600 4200 1B2P Kitchen Type 10 2 70360 2 600600 400600400 600600 2150 1575 1575 Kitchen Type 11 70361 3 2 4 600600 350600400 600 600 1575 1575 1B2P 2150 Kitchen Type 12 70362 3 4 2 70363 3 02 6 300 450 600 600 600 600 600 600 250 3675 1725 950 2150 3B6P 600 600 400 600 600 300 1100 1750 500 600 600 600 2655 3475 70364 2 3 4 6 70364 6 70365 3 2B4P 600 600 600 600 600 275 600 2450 2175 Kitchen Type 15 2 70366 2 3 4 2B4P 450 600 600 600600 450600600 2025 2025 2125 Kitchen Type 16 70367 2 3 3B5P 250600600300600600600600 300 5004525 Kitchen Type 17 70368 2 3 1B2P 600600600600450 600 450 14553225 Kitchen Type 18 0 Scale: 1: JCA Project No. Status Revision www.jocowenarchitects.com Drawing Number Drawing Title Project Purpose of Drawing Rev Date Description General Notes Jo Cowen Architects take no responsibility for any information supplied by third parties as the accuracy of which cannot be guaranteed. Do not scale from this drawing. All dimensions should be checked on site. Any omissions or discrepancies should be reported in writing to Jo Cowen Architects. This work is copyright and cannot be reproduced, copied, or modified in any form or by any means; graphic electronic or mechanical, including photocopying without permission in writing. © Jo Cowen Architects - 2023 - All Rights Reserved 1.25m 2.5m 25@A0 WIP Scale@A0 Drawn by Checked by Scale@A4 1 : 25 P02 For Information GREENWICH PENINSULA QUAYS Kitchen Layouts (plan only) 1.03-JCA-XX-ZZ-DR-A-70300 0857 S21 : 71 Kitchen Length 5450 Kitchen Length 3600 Kitchen Length 4150 Kitchen Length 3550 Kitchen Length 4330 Kitchen Length 4800 Kitchen Length 4800 Kitchen Length 4200 Kitchen Length 4200 Kitchen Length 4330 Kitchen Length 4500 Kitchen Length 6750 Kitchen Length 7890 Kitchen Length 4300 70 - Kitchen Schedule by Type Type Count Kitchen Type 01 20 Kitchen Type 02 20 Kitchen Type 03 55 Kitchen Type 03A 30 Kitchen Type 03B 2 Kitchen Type 04 27 Kitchen Type 05 26 Kitchen Type 06 20 Kitchen Type 07 20 Kitchen Type 08 20 Kitchen Type 09 20 Kitchen Type 10 20 Kitchen Type 10A 30 Kitchen Type 11 7 Kitchen Type 12 7 Kitchen Type 13 1 Kitchen Type 14 1 Kitchen Type 15 30 Kitchen Type 16 28 Kitchen Type 17 28 Kitchen Type 18 30 Kitchen Type 19. 29 Kitchen Type 20 29 Kitchen Type 21 29 Kitchen Type 22 20 Kitchen Type 24 29 Kitchen Type 25 9 Kitchen Type 26 3 Kitchen Type 27 1 Kitchen Type 28 1 Kitchen Type 29 5 Kitchen Type 30 3 600 Kitchen Length 3875 Kitchen Length 5312.5 Kitchen Length 4950 Kitchen Length 4665 1 : 25 Kitchen Type 01 Plan 1 1 : 25 Kitchen Type 02 Plan 2 1 : 25 Kitchen Type 03 Plan 3 1 : 25 Kitchen Type 04 Plan 4 1 : 25 Kitchen Type 05 Plan 5 1 : 25 Kitchen Type 06 Plan 6 1 : 25 Kitchen Type 07 Plan 7 1 : 25 Kitchen Type 08 Plan 8 1 : 25 Kitchen Type 09 Plan 9 1 : 25 Kitchen Type 10 Plan 10 1 : 25 Kitchen Type 11 Plan 11 1 : 25 Kitchen Type 12 Plan 12 1 : 25 Kitchen Type 13 Plan 13 1 : 25 Kitchen Type 14 Plan 14 1 : 25 Kitchen Type 15 Plan 15 1 : 25 Kitchen Type 16 Plan 16 1 : 25 Kitchen Type 17 Plan 17 1 : 25 Kitchen Type 18 Plan 18 P01 20/11/2023 80% Tender Release JCA GM P02 12/12/2023 100% Tender Release JCA GM TYPE 01 M4(2) TYPE 02 M4(2) TYPE 04 M4(2) TYPE 07 M4(3)2a TYPE 08 M4(3)2a TYPE 05 M4(1) 2230 1930 300 750 1615 2365 230 910 1090 1615 750 2365 750 1615 2365 800 1565 2365 1565 800 2365 2115 700 2815 700 1965 2665 2230 1930 300 2230 1630 300 1930 150 910 870 1930 300 1010 1105 2415 2665 540 910 915 1305 910 150 1365 810 190 1930 300 300 1010 1355 1930 1630 300 2310 3002010 2200 800 3000 1565 800 2365 900 1940 2840 1155 820 1025 190 910 1265 TYPE 09 M4(2) IN-SITU TYPE 10 M4(2) IN-SITU TYPE 11 M4(2) IN-SITU 1630 300 TYPE 06 M4(2) 2115 300 2365 300 1850 350 2200 Sterchele PODs Sterchele PODs Sterchele PODs Sterchele PODs Sterchele PODs Sterchele PODs 0 Scale: 1: JCA Project No. Status Revision www.jocowenarchitects.com Drawing Number Drawing Title Project Purpose of Drawing Rev Date Description General Notes Jo Cowen Architects take no responsibility for any information supplied by third parties as the accuracy of which cannot be guaranteed. Do not scale from this drawing. All dimensions should be checked on site. Any omissions or discrepancies should be reported in writing to Jo Cowen Architects. This work is copyright and can
TYPICAL LEVEL - DRYLINING Level Type Mark Type Function Width (mm) Length (m) Type Comments Level 03 (+13.140m) IW-01 JCA_WAL_INT_350 Interior 350.00 303.55 Party Wall / Separating Wall Level 03 (+13.140m) IW-02 JCA_WAL_INT_92 Interior 92.00 285.25 Internal Partition Level 03 (+13.140m) IW-03 JCA_WAL_INT_180-Corridor-Riser-doorside Interior 180.00 33.51 Riser Wall to Corridor Door Level 03 (+13.140m) IW-04 JCA_WAL_INT_Utility Cupboards Interior 119.00 143.29 Utility Cupboard Wall Level 03 (+13.140m) IW-08 JCA_WAL_INT_100-blockwork Interior 100.00 3.33 Blockwork Level 03 (+13.140m) IW-09 JCA_WAL_INT_180-Corridor Separating Wall Interior 180.00 5.45 Corridor Separating Wall Level 03 (+13.140m) IW-10 JCA_WAL_INT_BIKESandRISERS-0.18u Interior 400.00 37.04 Riser Wall Level 03 (+13.140m) IW-12 JCA_WAL_INT_500-Refuse Chute Wall Interior 500.00 4.69 Refuse Chute Wall Level 03 (+13.140m) IWL-01 JCA_IWL_INT_100-COL Interior 100.00 61.25 Column Lining - Apartments Level 03 (+13.140m) IWL-02 JCA_IWL_INT_100-PODS Interior 100.00 324.81 BY OTHERS Level 03 (+13.140m) IWL-03 JCA_IWL_INT_50a Interior 50.00 2.70 Column Lining - Apartments Level 03 (+13.140m) IWL-04 JCA_IWL_INT_50b Interior 50.00 32.09 2no. 12.5 plasterboard Wall Lining Level 03 (+13.140m) IWL-05 JCA_IWL_INT_23 Interior 23.00 53.61 Dot & Dab Wall Lining Level 03 (+13.140m) IWL-06 JCA_IWL_INT_50c Interior 50.00 0.25 2no. 15 plasterboard Wall Lining Level 03 (+13.140m) IWL-07 JCA_IWL_INT_100-CORE Interior 150.00 24.86 Independent Lining to Core Wall QUANTITY TAKEOFF REVIT Quantity Takeoff - Drylining DRYLINING Dynamic Reporting at every stage which can be checked against CostX
Type: IW-01 Width: 350mm Description: Party Wall/Seperating Wall Fire Rating: 60min Acoustic Rating: 54dB JCA_*Generic*_Gyproc FireLine JCA_*Generic*_Gyproc FireLine Mineral Wool Slab Insulation Isover Acoustic Partition Roll (APR 1200 Full Fill) Channel with Studwork Channel with Studwork JCA_*Generic*_Gyproc FireLine JCA_*Generic*_Gyproc FireLine 350 15 15 25 240 25 15 15 600mm Centres Typ. Type: IW-01 Width: 350mm Description: Party Wall/Seperating Wall Fire Rating: 60min Acoustic Rating: 54dB TYPICAL LEVEL - WALL TYPES TAKEOFF Level Type Mark Type Function Width (mm) Length (m) Type Comments Level 03 IW-01 JCA_WAL_INT_350 Interior 350.00 303.55 Party Wall / Separating Wall Level 03 IW-02 JCA_WAL_INT_92 Interior 92.00 285.20 Internal Partition Level 03 IW-03 JCA_WAL_INT_180 Interior 180.00 33.51 Riser Wall to Corridor Door Level 03 IW-04 JCA_WAL_INT_119 Interior 119.00 143.29 Utility Cupboard Wall and Boxing Level 03 IW-08 JCA_WAL_INT_100-Blockwork Interior 100.00 3.33 High Density Blockwork at Mezzanine Level Level 03 IW-09 JCA_WAL_INT_180-Corridor Interior 180.00 5.45 Corridor Separating Wall Level 03 IW-10 JCA_WAL_INT_400 Interior 400.00 37.04 Riser Wall and Bike Store Heated to Unheated Level 03 IW-12 JCA_WAL_INT_500 Interior 500.00 4.69 Refuse Chute Wall Level 03 IWL-01 JCA_IWL_INT_100-Lining Interior 100.00 61.25 Column Lining Inside Apartments Level 03 IWL-02 JCA_IWL_INT_100-Pods Interior 100.00 324.85 Pods by OTHERS Level 03 IWL-03 JCA_IWL_INT_50A Interior 50.00 2.70 Column Lining Inside Apartments 50mm Level 03 IWL-04 JCA_IWL_INT_50B Interior 50.00 32.34 Column Lining Inside Apartments 50mm Level 03 IWL-05 JCA_IWL_INT_23 Interior 23.00 53.61 Column Lining Platerboard and Dabs Level 03 IWL-07 JCA_IWL_INT_150-Core Interior 150.00 24.86 Independent Lining to Core Wall MATERIAL TAKEOFF Level Type Mark Type Location Material: Name Material: Area (m2) Material: Volume (m3) Level 03 IW-01 JCA_WAL_INT_350 Party Wall/Seperating Wall JCA_*Generic*_Gyproc FireLine 9500.19 142.50 Level 03 IW-01 JCA_WAL_INT_350 Party Wall/Seperating Wall JCA_*Generic*_Insulation, Isovar APR 1200 2375.05 570.01 Level 03 IW-01 JCA_WAL_INT_350 Party Wall/Seperating Wall JCA_*Generic*_Metal, Stud Layer 4750.09 118.75 QUANTITY TAKEOFF REVIT Quantity Takeoff - Wall Types WALL TYPES Dynamic Reporting at every stage which can be checked against CostX
STRUCTURAL COLUMNS Count Column Size Volume (m3) 1 150x1000 RC COLUMN HEAD 0.15 1 200x1000 RC COLUMN HEAD 0.20 1 200x1000 RC COLUMN HEAD 0.20 1 200x1000 RC COLUMN HEAD 0.20 1 200x1000 RC COLUMN HEAD 0.20 1 200x1000 RC COLUMN HEAD 0.20 1 200x1000 RC COLUMN HEAD 0.20 1 200x1000 RC COLUMN HEAD 0.20 1 200x1000x1200 RC COLUMN HEAD 0.24 61 250x1000 RC COLUMN 506.48 29 300x1200 RC COLUMN 610.62 2 350x1100 RC COLUMN 1.37 2 350x1200 RC COLUMN 5.74 16 400x750 RC COLUMN 136.59 4 400x1300 RC COLUMN 4.03 1 450 SQ RC COLUMN 1.27 8 450x800 RC COLUMN 20.94 2 450x1300 RC COLUMN 2.34 134 1291.18 STRUCTURAL BEAMS Count Type Length (mm) Volume (m3) 1 165Dpx250 RC UPSTAND 31025 1.20 1 165Dpx250 RC UPSTAND 8365 0.30 1 165Dpx250 RC UPSTAND 16052 0.62 1 165Dpx250 RC UPSTAND 12240 0.45 1 595Dpx200 RC BEAM 14181 0.55 1 600Dpx450 RC BEAM 7627 1.11 1 600Dpx450 RC BEAM 15343 2.32 1 600Dpx450 RC BEAM 16882 2.61 1 600Dpx450 RC BEAM 4721 0.70 1 600Dpx450 RC BEAM 26553 3.84 1 600Dpx450 RC BEAM 15382 2.21 1 600Dpx450 RC BEAM 7111 1.03 1 600Dpx450 RC BEAM 9910 1.41 1 600Dpx450 RC BEAM 15722 2.45 1 600Dpx450 RC BEAM 7056 1.17 1 600Dpx450 RC BEAM 19849 3.05 1 600Dpx450 RC BEAM 7553 1.16 1 600Dpx450 RC BEAM 4861 0.68 1 600Dpx450 RC BEAM 24620 3.43 1 600Dpx450 RC BEAM 14411 2.44 1 600Dpx450 RC BEAM 13540 3.38 1 600Dpx450 RC BEAM 13731 2.16 1 670Dpx250 RC BEAM 8465 0.30 1 670Dpx250 RC BEAM 31025 1.26 1 670Dpx250 RC BEAM 16052 1.07 1 670Dpx250 RC BEAM 12340 0.47 1 700Dpx200 RC UPSTAND 13969 1.96 1 700Dpx200 RC UPSTAND 7461 1.04 1 700Dpx200 RC UPSTAND 4831 0.68 1 895Dpx250 RC BEAM 17179 1.50 1 895Dpx250 RC BEAM 15872 2.29 1 1075Dpx300 RC BEAM 2150 0.28 1 1075Dpx500 RC UPSTAND 2248 0.77 1 1595Dpx200 RC UPSTAND 23977 7.64 1 1595Dpx200 RC UPSTAND 39836 12.73 1 1595Dpx200 RC UPSTAND 8543 2.59 1 1595Dpx200 RC UPSTAND 26500 8.23 37 81.09 STRUCTURAL PILE CAPS Count Type Volume (m3) 9 600 4No. PILE CAP (2700Sqx1000Dp) 64.85 1 600Ø 1No. PILE CAP (900Sqx1000Dp) 0.79 7 600Ø 1No. PILE CAP (1200Sqx1000Dp) 9.93 13 600Ø 2No. PILE CAP (2700Lgx900Wdx1000Dp) 31.04 1 600Ø 2No. PILE CAP (2700Lgx1200Wdx1000Dp) 3.20 14 600Ø 3No. PILE CAP (2460Lgx2700Wdx1000Dp) 72.76 4 750Ø 2No. Pile Cap (3300Lgx1100Wdx1000Dp) 14.25 7 750Ø 3No. PILE CAP (2950Lgx3300Wdx1000Dp) 52.72 1 750Ø 4No. PILE CAP (3300Lgx1000Dp) 10.76 5 750Ø 6No. PILE CAP (5550Lgx3300Wdx1000Dp) 90.58 1 750Ø 30No. PILE CAP (12500Lgx10150Wdx2000Dp) 253.75 1 750Ø 57No. PILE CAP (16800Lgx19890Wdx2000Dp) 497.53 2 2200mm THK RC PILE CAP 101.38 66 1203.52 STRUCTURAL PILES Count Pile Size Volume (m3) 8 600Ø PILE 33.69 106 600Ø PILE 449.56 15 750Ø PILE 98.91 153 750Ø PILE 1013.88 282 1596.03 STRUCTURAL SLABS Count Slab Type Slab Thickness (mm) Volume (m3) 3 150mm THK RC SLAB 150 10.86 38 200mm THK PT SLAB 200 7618.08 2 200mm THK RC SLAB 200 9.78 2 250mm THK PT SLAB 250 277.41 2 250mm THK RC SLAB 250 577.20 1 250mm THK RC SLAB TOE 44.70 2 300mm THK PT SLAB 300 405.06 50 8943.09 STRUCTURAL WALLS Count Wall Type Width (mm) Volume (m3) 4 200mm THK RC WALL 200 174.05 31 300mm THK RC WALL 300 2471.24 18 400mm THK RC WALL 400 79.45 53 2724.74 CONCRETE VOLUME TOTAL 15,839.65 m3 QUANTITY TAKEOFF CONCRETE FRAME REVIT Quantity Takeoff - Concrete CONCRETE VOLUME (M3) BEAMS PILES 10.0% 1,596.03 PILE CAPS 8.0% 1,203.52 SLABS 56.5% 8,943.09 BEAMS 0.5% 81.09 COLUMNS 8.0% 1,291.18 WALLS 17.0% 2,724.74 TOTAL: 100% 15,839.65
TYPICAL LEVEL - DRYLINING Level Type Mark Type Function Width (mm) Length (m) Type Comments LEVEL 04 (+19.425m) IWL 01 JCA_WAL_INT_GEN_100_IWL 01 Interior 100.00 13.73 Independant Wall Lining LEVEL 04 (+19.425m) IWL 02 JCA_WAL_INT_GEN_100_IWL 02 Interior 100.00 132.55 BY OTHERS LEVEL 04 (+19.425m) IWL 03 JCA_WAL_INT_GEN_50_IWL 03 Interior 50.00 62.58 Bathroom Pod - External Lining LEVEL 04 (+19.425m) IWL 03a JCA_WAL_INT_GEN_100_IWL 03a Interior 100.00 46.95 Independent Wall Lining - Utility Cupboard LEVEL 04 (+19.425m) IWL 04 JCA_WAL_INT_GEN_IWL 04 Interior 115.00 13.50 Shaftwall to Cores LEVEL 04 (+19.425m) IWL 05 JCA_WAL_INT_GEN_209 Party ShaftWall-IWL 05 Interior 209.00 2.89 Dual Shaft Wall + Lining LEVEL 04 (+19.425m) IWL 06 JCA_WAL_INT_GEN_150_IWL 06 Interior 150.00 36.28 Core Wall Lining - Back of Core LEVEL 04 (+19.425m) IWS 01 JCA_WAL_INT_GEN_100_IWS 01 Interior 100.00 118.68 Internal Partition LEVEL 04 (+19.425m) IWS 02 JCA_WAL_INT_GEN_250 PartyWalls-IWS 02 Interior 250.00 100.94 Party Wall / Separating Wall LEVEL 04 (+19.425m) WL 01 JCA_WAL_INT_GEN_50_WL 01 Interior 50.00 156.97 Independent Wall Lining - Columns LEVEL 04 (+19.425m) WL 03 JCA_WAL_INT_GEN_85_WL 03 Interior 85.00 40.75 Core Wall Lining QUANTITY TAKEOFF REVIT Quantity Takeoff - Drylining DRYLINING FRAME Dynamic Reporting at every stage which can be checked against CostX
STRUCTURAL SLABS Count Slab Type Slab Thickness (mm) Volume (m3) 33 Slab_225ThickInsitu 225 5011.16 1 Slab_250ThickInsitu 250 155.71 65 Slab_275ThickInsitu 275 283.36 3 Slab_300ThickInsitu 300 165.10 34 Slab_320ThickInsitu 320 1031.95 4 Slab_350ThickInsitu 350 152.28 140 6799.56 STRUCTURAL COLUMNS Count Column Size Volume (m3) 75 350mm x 350mm RC COLUMN 26.48 31 400mm x 350mm RC COLUMN 12.75 2 500mm x 500mm RC COLUMN 2.35 47 600mm x 350mm RC COLUMN 28.90 29 675mm x 500mm RC COLUMN 28.14 112 700mm x 350mm RC COLUMN 78.89 1 700mm x 400mm RC COLUMN 0.81 8 700mm x 700mm RC COLUMN 31.46 31 800mm x 425mm RC COLUMN 30.96 6 800mm x 520mm RC COLUMN 7.39 29 800mm x 600mm RC COLUMN 40.94 5 850mm x 400mm RC COLUMN 5.24 122 900mm x 350mm RC COLUMN 110.86 2 900mm x 500mm RC COLUMN 2.59 33 950mm x 550mm RC COLUMN 49.84 115 1000mm x 350mm RC COLUMN 117.21 31 1000mm x 400mm RC COLUMN 36.42 1 1000mm x 500mm RC COLUMN 1.44 31 1000mm x 550mm RC COLUMN 50.08 48 1100mm x 350mm RC COLUMN 54.79 10 1100mm x 450mm RC COLUMN 15.18 1 1100mm x 500mm RC COLUMN 1.58 2 1150mm x 450mm RC COLUMN 3.97 107 1200mm x 350mm RC COLUMN 132.58 33 1200mm x 450mm RC COLUMN 51.51 20 1300mm x 350mm RC COLUMN 27.91 60 1400mm x 350mm RC COLUMN 86.52 10 1400mm x 400mm RC COLUMN 17.18 12 1400mm x 450mm RC COLUMN 24.16 10 1500mm x 450mm RC COLUMN 20.71 42 1600mm x 350mm RC COLUMN 67.56 20 1600mm x 450mm RC COLUMN 44.17 6 1750mm x 250mm RC COLUMN 7.77 46 2000mm x 250mm RC COLUMN 66.72 44 2500mm x 250mm RC COLUMN 79.38 42 3000mm x 250mm RC COLUMN 90.56 1224 1454.99 STRUCTURAL PILES Count Pile Size Pile Length (mm) Pile Cross Sectional Area (m2) Volume (m3) 1 750mm Ø 10000 0.442 4.45 1 1050mm Ø 43275 0.866 37.54 3 1050mm Ø 44225 0.866 115.09 1 1050mm Ø 44400 0.866 38.52 1 1050mm Ø 44475 0.866 38.58 18 1050mm Ø 44825 0.866 699.91 1 1200mm Ø 44825 1.131 50.79 3 1200mm Ø 45000 1.131 152.96 2 1500mm Ø 43257 1.767 153.17 26 1500mm Ø 44825 1.767 2063.23 57 3354.24 STRUCTURAL FOUNDATION-SLABS Count Type Foundation Thickness (mm) Length (mm) Width (mm) Volume (m3) 1 Slab_2000ThickRaftFoundation 2000 14090 18215 425.47 1 Slab_2000ThickRaftFoundation 2000 3694 9875 35.69 1 Slab_2000ThickRaftFoundation 2000 1100 5096 11.22 1 Slab_2000ThickRaftFoundation 2000 2335 2262 10.56 1 Slab_2000ThickRaftFoundation 2000 280 7021 3.93 1 Slab_1500ThickRaftFoundation 1500 36220 6139 112.59 1 Slab_1500ThickRaftFoundation 1500 8740 19494 80.04 1 Slab_1500ThickRaftFoundation 1500 4475 1650 10.97 1 Slab_1500ThickRaftFoundation 1500 2281 19586 67.03 1 Slab_1200ThickRaftFoundation 1200 1500 23170 41.70 1 Slab_1200ThickRaftFoundation 1200 2403 21045 45.52 1 Slab_1200ThickRaftFoundation 1200 6097 1650 9.05 1 Slab_1200ThickRaftFoundation 1200 6097 1610 11.78 1 Slab_1200ThickRaftFoundation 1200 6097 1650 9.05 1 Slab_600ThickRaftFoundation 600 8140 9490 46.35 1 Slab_300ThickSuspendedRCSlab 300 36220 31750 180.47 1 1050mm x 1050mm x 1200mm DP (750Ø PILE) 1200 1050 1050 1.29 17 1102.72 STRUCTURAL BEAMS Count Beam Size Length (mm) Width (mm) Depth (mm) Volume (m3) 1 300mm W x 575mm DP RC BEAM 15970 300 575 2.75 1 300mm W x 575mm DP RC BEAM 1150 300 575 0.14 1 300mm W x 575mm DP RC BEAM 3550 300 575 0.56 1 300mm W x 575mm DP RC BEAM 20455 300 575 3.52 1 300mm W x 575mm DP RC BEAM 7675 300 575 1.32 1 300mm W x 575mm DP RC BEAM 2290 300 575 0.34 1 300mm W x 575mm DP RC BEAM 11845 300 575 1.99 1 300mm W x 575mm DP RC BEAM 6946 300 575 1.20 1 300mm W x 575mm DP RC BEAM 14775 300 575 2.54 1 300mm W x 575mm DP RC BEAM 6946 300 575 1.19 1 350mm W x 800mm DP RC BEAM 15175 350 800 4.15 1 350mm W x 800mm DP RC BEAM 23264 350 800 6.17 1 350mm W x 800mm DP RC BEAM 16620 350 800 4.53 1 350mm W x 800mm DP RC BEAM 20360 350 800 5.50 1 350mm W x 800mm DP RC BEAM 1775 350 800 0.39 1 350mm W x 800mm DP RC BEAM 2904 350 800 0.71 1 750mm W x 1200mm DP RC GROUND BEAM 3979 750 1200 3.58 1 750mm W x 1200mm DP RC GROUND BEAM 1245 750 1200 1.12 1 750mm W x 1200mm DP RC GROUND BEAM 3979 750 1200 3.58 1 750mm W x 1200mm DP RC GROUND BEAM 1245 750 1200 1.12 1 1350mm W x 225mm DP RC BEAM 7275 1350 225 2.15 1 1350mm W x 225mm DP RC BEAM 7500 1350 225 2.14 1 1350mm W x 225mm DP RC BEAM 7500 1350 225 2.14 1 1350mm W x 225mm DP RC BEAM 7500 1350 225 2.14 1 1350mm W x 225mm DP RC BEAM 7275 1350 225 2.15 25 57.12 STRUCTURAL WALLS Count Type Width (mm) Volume (m3) 2 Upstand_1000ThickInsitu 1000 1.15 393 Wall_250ThickInsitu 250 978.12 48 Wall_300ThickInsitu 300 113.64 13 Wall_350ThickInsitu 350 46.02 245 Wall_400ThickInsitu 400 1535.35 2 Wall_850ThickRetaingWal 850 13.99 2 Wall_1000ThickRetaingWall 1000 16.46 705 2704.72 CONCRETE VOLUME TOTAL:: 15,473.35 m33 CONCRETE FRAME EAST TOWER REVIT Quantity Takeoff - Concrete CONCRETE VOLUME (M3) PILES 21.7% 3,354.24 SLABS 44.0% 6,799.56 BEAMS 0.3% 57.12 FOUNDATION 7.0% 1,102.72 COLUMNS 9.4% 1,454.99 WALLS 17.6% 2,704.72 TOTAL: 100% 15,473.35 QUANTITY TAKEOFF
VIABILITY NAVIGATING THE BUILDING SAFETY ACT & BSA 2022
CONTENT 1. What is the building safety act? 2. The BSA: a Brief Timeline 3. Gateways: Impact on Programmes 4. Adapting Designs: The Second Staircase Rule 5. Misconceptions Surrounding the Principal Designer Role 6. Contractor Risk Profile and Responsibility 7. Implications for Consultant Appointments & Scope of Service 8. Will the BSA Increase Preliminaries Costs? 9. Impact on Procurement and Design Completion 10.Does JCT 2024 Recognise the Building Safety Act? 11.Adapting to the Regulatory Changes
WHAT IS THE BUILDING SAFETY ACT?
• The Building Safety Act 2022 (BSA) is a pivotal piece of legislation. • following the tragic events of the Grenfell tower fire, • to enhance safety and accountability within the UK construction industry. • More than just tweaks to the Building Act 1984. • Aims to establish a comprehensive framework for ensuring the safety of buildings throughout their lifecycle • Focus is largely on structural and fire safety. • Applies to all buildings (regardless of use). • Created the Building Safety Regulator to oversee compliance and enforcement. WHAT IS THE BUILDING SAFETY ACT?
THE BSA: A BRIEF TIMELINE
JULY 2021 THE BSA: A BRIEF TIMELINE Introduced To Parliament 28 APRIL 2022 1 APRIL 2023 1 OCTOBER 2023 6 APRIL 2024 6 JULY 2024 Royal Assent Officially Took Effect Six-month Transition Ends Competence Assessment Period Ends Higher-Risk Buildings
GATEWAYS: IMPACT ON PROGRAMMES
GATEWAY 1: PLANNING • Fire Statement (evidencing specialist fire safety advice has been considered. • Early engagement with local fire brigade. • London Fire Brigade response has been as long as 18 weeks. GATEWAYS: IMPACT ON PROGRAMME CONSTRUCTION PERIOD • Notice of Commencement • Ongoing requirements to assure building regulations compliance. • Change Management • Golden Thread. BEFORE BUILDING WORK COMMENCES • Building control approval from BSR required before ‘work’ commences. • 12-week statutory determination period. WHEN BUILDING WORK IS COMPLETED. • Pre-Occupation • 12-week statutory determination period. • Principal Contractor hands over golden thread of information to building owner. • Building can be registered for occupation. GATEWAY 2: BETWEEN GATEWAYS 2 & 3: GATEWAY 3:
ADAPTING DESIGNS: THE SECOND STAIRCASE RULE
SECOND STAIRCASE RULE Second staircase required in new residential buildings above 18m Holistic approach should be taken, revaluating building materials, construction methods and occupancy capacities Designers must devise comprehensive evacuation plans accounting for multiple staircases. Simulations and mock evacuations may be necessary. 30-month transitional period to comply with the second staircase requirements (expiring in September 2026)
MISCONCEPTIONS SURROUNDING THE PRINCIPAL DESIGNER ROLE
PRINCIPAL DESIGNER Principal Designer (BR) Principal Designer (CDM) Must plan, manage, and monitor the design work during the design phase of a building. They ensure that the design complies with the Building Regulations. • Ensures compliance with the broader set of Building Regulations governing the design and construction of buildings. Must plan, manage, and monitor the pre- construction phase of a project and to co-ordinate matters relating to health and safety. • Focuses specifically on health and safety compliance under the CDM Regulations Principal Designer (BR) / Principal Designer (CDM) Same Name Different Roles Clients need to understand the role of each Principal Designer when making appointments but should note that these roles can be carried out by the same person or company (providing they have the requisite skills, knowledge, experience, and competence).
CONTRACTOR RISK PROFILE & RESPONSIBILITY
CONTRACTOR RISK PROFILES BSA places greater emphasis on Contractor: • Accountability and ownership throughout the project lifecycle. • Quality Assurance and Compliance strategies (including compliance with regulatory requirements and safety protocols) • Ownership of project outcomes, including the long-term safety and integrity of the buildings they construct (immediate and long-term sustainability and safety standards mandated by the legislation) • Contractor’s All Risks (CAR) and professional indemnity insurance. (greater regulatory oversight and stakeholder scrutiny, increasing risk exposure to claims from clients, building occupants, and regulatory authorities) • expanded liability for defects, deficiencies, and non-compliance with building safety standards. Project teams must ensure that there is absolute clarity in preliminary documents as to who is responsible for which elements of BSA compliance, particularly in relation to the higher-risk building regime.
IMPLICATIONS FOR CONSULTANT APPOINTMENTS & SCOPE OF SERVICE
CONSULTANT APPOINTMENTS AND SCOPE OF SERVICE Consultants face additional requirements related to building safety, fire protection, and compliance with new regulations Increased accountability for ensuring their designs, plans, and recommendations comply with building safety regulations Consultants should conduct thorough assessments of their existing service offerings to pinpoint areas that may require updates or enhancements. Potential for programme delays because of the higher-risk building regime (gateways 1 - 3) needs to be considered relative to consultant fees.
WILL THE BSA INCREASE PRELIMINARIES COSTS?
WILL THE BSA INCREASE PRELIMINARIES COST? Increased preliminaries costs could include expenses related to implementing new safety measures, conducting additional inspections and tests, and maintaining comprehensive documentation to demonstrate compliance Consultants may incur additional costs as they adapt their services and may include investment in training and professional development to stay informed. Clients / Developers may incur additional costs related to hiring additional consultants with building safety expertise, pre-construction and risk assessments, as well as obtaining necessary approval and permits. CONTRACTORS CONSULTANTS CLIENTS/DEVELOPERS INSURANCE PROVIDERS May adjust CAR and PI insurance premiums.
IMPACT ON PROCUREMENT AND DESIGN COMPLETION
IMPACT ON PROCUREMENT AND DESIGN COMPLETION Designs need to be “completed” and building regulations submitted prior to commencing construction adds complexity to procurement processes • The definition of "completed" designs poses a challenge, potentially extending project timelines and increasing costs. The requirement for completed designs places additional pressure on design teams to deliver comprehensive and accurate documentation within tighter time frames. RIBA Stage 4 design information required for Gateway 2 applications under the higher-risk building regime, project teams are grappling with ways to maintain competitive commercial practices in the contractor market • Consideration should be given to the timing of procuring HRB projects due to the necessity of earlier contractor involvement. May result in procuring contractors with less cost fixity, increasing client risk, as client-contractor design collaboration occurs earlier in the design process To tackle these challenges, stakeholders should embrace proactive and innovative strategies in procurement and project management.
DOES THE JCT 2024 RECOGNISE THE BSA
DOES THE JCT 2024 RECOGNISE THE BSA The new JCT Design and Build 2024 contract recognises some of the requirements of the BSA, such as the new duty-holder obligations. • Article 7 has been included, which requires parties to identify who the Principal Designer and Principal Contractor will be for the purposes of the amended Building Regulations The JCT produced a separate note covering their approach to BSA compliance, acknowledging they have made no special provisions regarding these complexities. These will need to be introduced by way of a bespoke schedule of amendments, with particular attention given to who falls responsible in the event delays are caused by the gateway regime and BSR.
ADAPTING TO THE REGULATORY CHANGES
ADAPTING TO THE REGULATORY CHANGES Building Safety Act 2022 represents a seismic shift in the construction industry Embrace collaboration, innovation and a commitment to excellence Adapting designs to clarifying responsibilities and reimagining procurement processes, stakeholders must navigate a complex regulatory landscape with agility and foresight
BSA 2022 LEGISLATION aka Building Safety Regulator (BSR) aka The Regulator aka Building Control Authority for HRBs NEW and EXISTING Higher-Risk Buildings (HRBs) BSA 2022 amended many sections of the BA 1984 Building Advisory Committee Accountable Person for HRBs (AP) JCA Client Care Letters 1. BRPD Client Care Letter_Commercial.docx 2. BRPD + CDM Client Care Letter_Commercial.docx 3. BRPD + CDM Client Care Letter_Domestic.docx CDM PD 2015 Building Regulations Principal Contractor (BRPC) CDM PC 2015 Building Regulations Principal Designer (BRPD) BS FLEX 8670 v3 Behavioural competence PAS 8671 2022 PD Competence HSE CDM L153 Domestic Clients The Construction (Design and Management) Regulations 2015 The Building Regulations 2010 with The Building Regulations etc. (Amendment)(England) Regulations 2023 The Building Safety (Regulator’s Charges) Regulations 2023 The Regulatory Reform (Fire Safety) Order 2005 Require Full Plans Submission PAS 8672 2022 PC Competence BS FLEX 8670 v3 1. Principal Designers 2. Principal Contractors 3. Designers 4. Contractors 5. Building Safety Managers 6. Building control professionals and 7. Responsible persons for buildings in occupation BSR Gateway 2 HRBs Building Regs Submission BSR Gateway 3 HRBs BSR Completion Certificate PAS 8673 2022 Competence person managing safety in a residential building Domestic or Commercial Clients (HRBs) BSR is the statutory consultee for planning applications which involve relevant buildings BSR Gateway 1 HRBs Planning Submission Principal Contractor (HRBs) Domestic or Commercial Clients (HRBs) Registered Building Control Approver (RBCA) Registered Building Inspector (BI) Public Register of (RBCAs) Approved Inspector (AI) only till 06/04/2024 01/07/2024 Relevant Requirements 4, 6, 7, 8, 22, 23, 25B, 26, 26A, 28, 36, 41(2)(a), 42(2)(a), 43(2)(a), 44A, 44ZA, 44ZC and 44D to 44I and Schedule 1. Commercial Clients Principal Accountable Person for HRBs (PAP) Regulatory Reform Act 2001 Health and Safety at Work etc Act 1974 Architects Act 1997 Building Safety Act 2022 Consumer Protection Act 1987 Mandatory Occurrence Reporting (MOR) Under it, "safety occurrences" relating to the structural integrity or fire safety of HRBs which could potentially pose a serious risk to people, must be reported to the Building Safety Regulator (BSR) during the construction phase. https://www.gov.uk/guidance/submitting-mandatory-occurrence-notices-and-reports Overview of the new building control regime https://www.hse.gov.uk/building-safety/building-control/regime-overview.htm JCA Training ARB CPDs Training RIBA Close Cooperation ARB RIBA CPD Training RIBA CPD core curriculum 2024 by JCA 1. Architecture for Social Purpose 2. Health, safety and wellbeing 3. Business, clients and services 4. Legal, regulatory and statutory compliance 5. Procurement and contracts 6. Sustainable architecture 7. Inclusive environments 8. Places, planning and communities 9. Building conservation and heritage 10. Design, construction and technology ARB CPD core curriculum 2024 by JCA 1. Environmental sustainability 2. Fire and life safety JCA RIBA & ARB CPD Record with 'CPD Central Register' Part of JCA ISO 9001 Accreditation About the Building Safety Regulator https://www.hse.gov.uk/building-safety/regulator.htm Provision of assistance to a multi-disciplinary team https://www.hse.gov.uk/building-safety/building-control/provision-of-assistance.htm High-rise residential building register https://www.gov.uk/guidance/find-a-high-rise-residential-building Criteria for determining whether a building is a higher-risk building during the occupation phase of the new higher-risk regime https://www.gov.uk/guidance/criteria-for-being-a-higher-risk-building-during-the- occupation-phase-of-the-new-higher-risk-regime BSR Gateway 2 submission requirements https://www.gov.uk/guidance/managing-building-control-approval-applications-for- higher-risk-buildings Building Act 1984 Fire Safety Act 2021 Responsible Person (RP) Functional Requirements Schedule 1 - Approved Documents A - Structure B - Fire safety C - Site preparation and resistance to contaminants and moisture D - Toxic substances E - Resistance to the passage of sound F - Ventilation G - Sanitation, hot water safety and water efficiency H - Drainage and waste disposal J - Combustion appliances and fuel storage systems K - Protection from falling, collision and impact L - Conservation of fuel and power M - Access to and use of buildings O - Overheating P - Electrical safety – dwellings Q - Security – dwellings R - Physical infrastructure for high speed electronic communication networks S - Infrastructure for charging electric vehicles Criteria for determining whether a new building that is being designed and constructed is a "higher-risk building" https://www.gov.uk/guidance/criteria-for-determining-whether-a-new-building-that-is- being-designed-and-constructed-is-a-higher-risk-building Building Control: An overview of the new regime https://www.hse.gov.uk/
BUILDING REGULATIONS PRINCIPAL DESIGNER SERVICES Building Regulations Principal Designer Services JCA BRPD Services 1. The Practice - Organizational Capability 2. JCA Project Approach 3. Competency of JCA Architects - Lead Designers 4. Competency of JCA Architects - Building Regulations Principal Designers (BRPD) 5. Competence Assessment under BS Flex 8670 V3.0 6. Design Responsibility Matrix 7. JCA Building Regulations PD Client Care Letter for Commercial Projects 8. JCA Building Regulations Relevant Requirements Tracker 9. JCA Construction Assumptions Compliance Tracker 10. Schedule of Building Regulations Principal Designer services • General duties as Designers • Building Regulations Principal Designer – General services (Non HRBs) • Building Regulations Principal Designer – Higher-Risk Buildings (HRBs) 11. JCA Lead Designers and Building Regulations Principal Designers CVs JCA Membership / Affiliation • ARB - Architects Registration Board • RIBA - Royal Institute of British Architects • CIOB - Charted Institute of Buildings • ATLG - Architectural Technical Leads Group • ATLG - BRPD Compliance Group • ATLG - BRPD Competence Group • DIOHAS - The Designers’ Initiative on Health and Safety Individual designers (multi-disciplinary teams) still have responsibility. BRPD is ideally suited for those companies who are acting as Lead Designers.
VIABILITY BUILDING REGULATIONS COMPLIANCE TRACKER Relevant Requirements • 4, 6, 7, 8, 22, 23, 25B, 26, 26A, 28, 36, 41(2)(a), 42(2)(a), 43(2)(a), 44A, 44ZA, 44ZC and 44D to 44I and Schedule 1 Functional Requirements under Schedule 1 • ADB A - Structure • ADB B - Fire safety • ADB C - Site preparation and resistance to contaminants and moisture • ADB D - Toxic substances • ADB E - Resistance to the passage of sound • ADB F - Ventilation • ADB G - Sanitation, hot water safety and water efficiency • ADB H - Drainage and waste disposal • ADB J - Combustion appliances and fuel storage systems • ADB K - Protection from falling, collision and impact • ADB L - Conservation of fuel and power • ADB M - Access to and use of buildings • ADB O - Overheating • ADB P - Electrical safety – dwellings • ADB Q - Security – dwellings • ADB R - Physical infrastructure for high speed electronic communication networks • ADB S - Infrastructure for charging electric vehicles • Devising and producing tools and templates to standardise approaches to be able to comply with and demonstrate competency and compliance with relevant requirements. • Knowledge share and insight into potential pitfalls. Building Regulations Compliance Tracker
12 Weeks Assessment Period 12 Weeks Assessment Period BSR GATEWAYS FOR HRBS RIBA Stages & Building Safety Regulator (BSR)Process, Programme & Procurement • Not business as usual, embrace change, upskill and increase knowledge. • Control the process and ultimately project programme. • How does this affect viability? Potential for delays across the work stages. • Consultants’ appointment: Scope /Competence/ Education/ Responsibilities • Programme and procurement. • Stage 4 & GW02. GW01 - Planning Submission • HSE statutory consultee for HRBs GW02 - Building Control Submission • Hard Stop - 12 weeks assessment period GW03 - Completion • Hard Stop - 12 weeks assessment period followed by Completion Certificate Changes are broadly categorized as follows: • A major change is one with a significant impact on the design or fire strategy of the HRB and would significantly alter or undermine the basis on which the original approval was based. These applications will be subject to a fee and will take up to six weeks to be determined. No work can take place on any area subject to a major change until the regulator has approved that change • A notifiable change is one having an effect on the design or compliance. Once the regulator is informed, notifiable changes can be started on site. • A recordable change is a minor change that does not need to be raised with the Building Safety Regulator. Should be included in the controlled change log. BRIEF DESIGNER DELIVERY HRB Gateway 01: Prior to Planning Permission Applicants demonstrate that the planning application incorporates thinking on fire safety. DEFECTS RESOLUTION EVALUATION HRB Gateway 02: Prior to Construction This gateway provides a ‘hard stop’ where construction cannot begin until the BSR has approved the building control application. HRB Gateway 03: Prior to Occupation A ‘hard stop’ at which the BSR undertakes final inspections and issues a completion certificate. Architect / Lead Designer / Principal Designer Design Team Construction BSR Hard StopBSR BSR Hard Stop
533 Kings Road Chelsea London SW10 0TZ United Kingdom T +44 (0) 207 371 0357 www.jocowenarchitects.com 10 South Crescent London WC1E 7BD United Kingdom T +44 (0) 207 209 3000 www.gardiner.com