PWD SCHEDULE OF RATES 2022 (2nd REVISED) PART A: CIVIL WORKS SIXTEENTH EDITION (2nd REVISED) PUBLIC WORKS DEPARTMENT GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH EFFECTIVE FROM 22 JANUARY 2026

ENDORSEMENT The sixteenth edition (2nd Revised) of PWD Schedule of Rates 2022 Part A: Civil Works, approved by the Ministry of Finance, Government of the People’s Republic of Bangladesh (GoB) vide memo no. 07.00.0000.000.155.15.26.01.26-13; dated: 08/01/2026 and duly endorsed by the Ministry of Houding and Public Works, GoB vide memo no. 25.00.0000.031.14.003.22/124; dated: 22/01/2026, is hereby endorsed by the undersigned for official use in Public Works Department (PWD), Bangladesh with effect from 22 January 2026. Md Khalequezzaman Choudhury Chief Engineer Public Works Department

PREFACE The sixteenth edition (2nd Revised) of PWD Schedule of Rates (SoR) 2022 is the revised and updated edition replacing the previous edition of 2022 (Revised). The sixteenth edition (Revised) of Schedule of Rates has been in effect since 23 February 2023. This edition of schedule of rates shall be effective from 22 January 2026. The Value Added Tax (VAT) rate has been updated to 10% from the previous rate of 7.5%, in accordance with the Statutory Regulatory Order (SRO) no 182-Law/2025/310-VAT; dated: 27/05/2025 issued in the form of gazettee by the National Board of Revenue (NBR). This change in VAT has been endorsed for implementation by the Ministry of Finance vide memo no: 07.00.0000.000.155.15.26.01.26-13; dated: 08/01/2026. Then the Ministry of Housing and Public Works duly endorsed this vide memo no. 25.00.0000.031.14.003.22/124; dated: 22/01/2026. Necessary adjustments have been made in the rates to reflect this change. This edition of the SoR has the consent by the Ministry of Finance. All efforts have been taken to keep this publication free from errors. Constructive suggestions are welcome for any necessary correction, modification or issuance of corrigendum, if required. Preparation, updating and publication of the Schedule of Rates is a mammoth task, which has been accomplished through the sincere and relentless efforts of the members of the Schedule of Rates Preparation Committee. I would like to express my sincere gratitude to all concerned engineers and officers for their valuable cooperation, suggestions and constructive feedback. 25 January 2026 Purta Bhaban Segun Bagicha, Dhaka Md. Shamsuddoha Convenor PWD Schedule of Rates Preparation Committee & Additional Chief Engineer (Planning & Special Project) Public Works Department

TABLE OF CONTENTS Sl. No. Contents Page 1 Conversion Table i-iii 2 Unit weight of different engineering materials and weight of different steel sections iv-v 3 Cross sectional area and mass of round bar vi 4 Wire and sheet metal gauge in decimals of an inch vii 5 Distance matrix (District HQ to District HQ) viii-ix 6 Miscellaneous measurement relations x 7 Rates of Man, Materials and Mark-ups 1-66 8 Chapter 01: General, Site facilities & Safety 67-71 9 Chapter 02: Excavation, Filling & Site Development and Palisading 72-75 10 Chapter 03: Brick soling, CC, DPC etc. 76-77 11 Chapter 04: Brick works, Patent stone in floor and Fancy screen block works 78-84 12 Chapter 05 : Mosaic works 85-89 13 Chapter 06: Tiles, Marble and Granite stone works 90-98 14 Chapter 07: Reinforced cement concrete (RCC) works 99-114 15 Chapter 08: M.S. Fabrication and joints in RC works 115-117 16 Chapter 09: Pile works and Pile test 118-128 17 Chapter 10: Structural steel works, Sheet roofing and Safety canopy 129-134 18 Chapter 11: Wood/ Metal works in door and window frame, Roof truss and Hand Rail 135-137 19 Chapter 12: Door-window shutter & Fly proof wire-net shutter 138-147 20 Chapter 13: Window grill, Verandah grill & Netting 148-152 21 Chapter 14: Aluminium door, Window frame & Glass works 153-164 22 Chapter 15: Cement plaster, Fair-face plaster and Pointing works 165-168 23 Chapter 16: Painting and Polishing 169-175 24 Chapter 17: Lime terracing, Roof top water proofing for garden & Swimming pool 176-177 25 Chapter 18: False ceiling, Wall paneling & Acoustic items 178-191 26 Chapter 19: Collapsible gate, M.S. gate, Rolling shutter etc. 192-197 27 Chapter 20: Stair & Verandah Railing and Stair nosing 198-207 28 Chapter 21: Grill fencing and Barbed wire fencing 208-211 29 Chapter 22: Miscellaneous items 212-217 30 Chapter 23 : Ferrocement works 218-221 31 Chapter 24: Road and Pavement works 222-229 32 Chapter 25: Arboriculture works 230-232 33 Chapter 26: Sanitary & Water supply works 233-263 34 Chapter 27: Deep tube-well 264-285 35 Chapter 28: Gas connection works 286-289 36 Chapter 29: Termite treatment works 290-291 37 Chapter 30: Concrete solid and Hollow blocks, Facing and Paving stones etc. 292-302 38 Chapter 31: Sub-soil investigation works & Digital survey 303-307 39 Chapter 32: Repair works 308-319 40 Chapter 33: Added rate for Inaccessible Areas 320 41 Annexure-A: Plinth Area Rates 321-330 42 Annexure-B: Guidelines for Preparation of preliminary Estimates 331-338 43 Annexure –C: Finish schedule 339-341

PWD SoR 2022 (2nd Revised) for CIVIL Works i CONVERSION TABLE FPS AND METRIC SYSTEM (TABLE – 1 TO 3) TABLE – 1 FPS METRIC METRIC FPS 1 inch 25.40 mm = 2.54 cm 1 mm 0.03937 inch 1 feet 30.48 cm = 0.3048 m 1 meter 3.281 ft 1 mile 1.609 km 1 km 0.6214 mile 1 gallon (UK) 4.546 liter 1 liter 0.22 gallon (UK) 1 pound 0. 4536 kg 1 kg 2.205 lb 1 seer 0.9331 kg 1 kg 1.072 seer 1 maund 37.324 kg 1 kg 85.74 tolas 1 ton 1.016 tonne 1 tonne 0.984 ton = 1000 kg. 1 cwt. (UK) 0.508 quintal 1 quintal 1.969 cwt (UK) 1 in2 6.452 cm2 1 cm2 0.155 in2 1 ft2 0.093 m2 1 m2 10.764 ft2

PWD SoR 2022 (2nd Revised) for CIVIL Works ii TABLE – 2 CONVERSION FACTOR CONVERSION FACTOR RemarksBritish (FPS) Metric SI SI Metric British (FPS) Length 1 in 1 ft 1 yd 1 mile 1 nautical mile 25.4 mm 0.3048 m 0.9144 m 1.609 km 1.852 km 25.4 mm 0.3048 m 0.9144 m 1.609 km 1.852 km 1 mm 1 cm 1 m 1 km 1 km 1 mm 1 cm 1 m 1 km 1 km 0.03937 in 0.3937 in 3.281 ft 0.6214 mi 0.5399 nautical mile 1 in = 2.54 cm Area 1 in2 1 ft2 1 yd2 1 mi2 acre 6.452 cm2 0.0929 m2 0.8361 m2 2.59 km2 0.4047 ha 6.452 cm2 0.0929 m2 0.8361 m2 2.59 km2 0.4047 ha 1 cm2 1 m2 1 m2 1 km2 1 ha 1 cm2 1 m2 1 m2 1 km 1 ha 0.155 in2 10.764 ft2 1.196 yd2 0.3861 mi2 2.471 acre 1 in2 = 645.2 mm2 1 acre = 43560 ft2 = 4047m2 1 km2= 247.105 acres 1 hectre = 10000 m2 Volume 1 in3 1 ft3 1 yd3 1 gal (UK) 1 gal (US) 16.387 cm3 0.02832 m3 0.7648 m3 4.546 liters 3.7854 liters 16.387 cm3 0.02832 m3 0.7648 m3 4.546 liters 3.7854 liters 1 cm3 1 m3 1 m3 1 liter 1 liter 1 cm3 1 m3 1 m3 1 liter 1 liter 0.061 in3 35.315 ft3 1.308 yd3 0.22 gal (UK) 0.264 gal (US) 1 ft3 = 6.23901 gal = 28.316 liters 1 bushel (imperial) = 36.37 liters Moment of Inertia 1 in4 1 ft4 41.623 cm4 0.008631 m4 41.623 cm4 0.008631 m4 1 cm4 1 m4 1 cm4 1 m4 0.024 in4 115.86 ft4 Power, Work, Energy, Quantity of heat 1 hp 1 btu 0.7457 kw 1.055 kilo joules 0.7457 kw 1.055 kilo joules 1 kw 1 kj 1 kcl 1 kw 1 kj 1 kcl 1.341 hp 0.9478 btu 3.9651 btu 1 J = 1 Nm 1 hp = 1.01387 metric hp = 550 ft-lb/sec 1 W = 1 J/sec Miscellaneous Units: 1 great gross = 12 gross = 144 dozen 1 quire= 24 sheets 1 gross =12 dozen = 144 units 1 ream = 20 quires = 480 sheets 1 dozen = 12 units 1 ream printing paper = 500 sheets 1 score = 20 units

PWD SoR 2022 (2nd Revised) for CIVIL Works iii TABLE – 3 CONVERSION FACTOR CONVERSION FACTOR Remarks British (FPS) Metric SI SI Metric British (FPS) Mass 1 gr 1 oz (avoir) 1 lb (avoir) 0.0648 gm 28.349 gm 0.4536 kg 0.0648 gm 28.349 gm 0.4536 kg 1 gm 1 gm 1 kg 1 gm 1 gm 1 kg 15.432 gr 0.0353 oz 2.205 lbs 1 lb = 0.486 seer 1 kg = 1.072 seer = 85.74 tolas Conc. load/force, mass, weight 1 lb 1 kip 1 ton 1 cwt 0.4536 kg 453.6 kg 1.016 tonne (1016 kg) 50.80 kg 4.4482 N 4.4482 kN 9.964 kN 0.4982 kN 1 N 1 kN 1 kN 0.102 kg 101.96 kg 101.96 kg 0.2248 lb 224.81 lb 2.007 cwt 1 kg = 2.2046 lb = 9.807 N 1 tonne = 10 quintal = 1000 kg = 26.7923 maund 1 kg = 0.01968 cwt 1 ton = 2200 lb =907.2 kg Linear loads (load per unit length) 1 lb/in 1 lb/ft 1 kip/ft 1 ton/ft 0.01786 kg/mm 1.488 kg/m 1488.19 kg/m 3.333 tonne/m 0.17512 N/mm 0.0146 kN/m 14.5939 kN/m 32.69 kN/m 1 N/mm 1 kN/m 1 kN/m 0.102 kg/mm 101.96 kg/m 0.102 tonne/m 5.71 lb/in 68.52lb/ft 0.031 ton/ft 1 kg/m = 9.80 N/m = 0.672 lb/ft. Surface loads (load per unit area) 1 lb/in2 1 lb/ft2 1 kip/ft2 1 ton/ft2 0.0703 kg/cm2 4.883 kg/m2 4883 kg/m2 10.937 tonne /m2 6.895 kN/m2 0.04788 kN/m2 47.8803 kN/m2 107.14 kN/m2 1 MN/m2 1 kN/m2 1 kN/m2 101972.6 kg/m2 101.97 kg/m2 0.102 tonne/ m2 145.038 lb/in2 20.885 lb/ft2 0.00933 ton/ft2 1 kg /cm2 = 2048.16lb/ft2 1 kg/cm2 = 0.968 atom 1 kg/m2 = 0.205 lb/ft2 Density (unit weight) 1 lb/in3 1 lb/ft3 1 ton/ft3 0.0000277 kg/mm3 16.02 kg/m3 35.88 tonne/m3 0.00027N/mm3 0.1572 kN/m3 352.08 kN/m3 1 N/mm3 1 kN/m3 1 kN/m3 0.1021 kg/mm3 101.92 kg/m3 0.102 tonne/m3 3703.70 lb/in3 6.361 lb/ft3 0.0028 ton/ft3 1 kg/m3 = 0.0624 Ib/ft3 Stress, modulus of elasticity, pressure 1 lb/in2 1 kip/in2 1 lb/ft2 0.0703 kg/cm2 70.3078 kg/cm2 4.883 kg/m2 6.895 kPa 6.895 mPa 47.8802 Pa 1 mPa 1 kPa 10.19 kg/cm2 101.97 kg/m2 145.038 lb/in2 20.885 lb/ft2 MPa = MN/m2 = N/mm2 = 1000 kN/m2 1 Pa = 1N/m2 1 kN = 224.809 lbs 1 kg/cm2 = 14.223 lb/in2 1 ft. of water = 2.989 kPa Moment/ Torque 1 lb-in 1 lb-ft 1 kip-ft 1 ton-ft 11.5214 kg-mm 0.1383 kg-m 138.3 kg-m 0.31 tonne-m 112.98 N-mm 1.3558 N-m 1.3558 kN-m 3.037 kN-m 1 N-mm 1 N-m 1 kN-m 0.102 kg-mm 0.102 kg-m 0.102 tonne-m 0.0088lb-in 0.738 lb-ft 0.3293 ton-ft Velocity/ Speed 1 ft/sec 1 mile/sec 1 mile/hr 0.3048 m/sec 1.609 km/sec 0.4470 m/sec 0.3048 m/sec 1.609 km/sec 0.4470 m/sec 1 m/sec 1 km/sec 1 m/sec 1 km/sec 3.281 ft/sec 2236.94 mi/hr Acceleration 1 ft/sec2 0.3048 m/sec2 0.3048 m/sec2 1 m/sec2 1 m/sec2 3.281 ft/sec2 Temperature (Celsius) 1 degree Fahrenheit (0F) = (t0-32)/1.8 degree Celsius (0C)

PWD SoR 2022 (2nd Revised) for CIVIL Works iv UNIT WEIGHT OF DIFFERENT ENGINEERING MATERIALS AND WEIGHT OF DIFFERENT STEEL SECTIONS (TABLE – 4 TO 8) TABLE – 4 UNIT WEIGHT OF ENGINEERING MATERIALS Unit Weight of Different Materials Unit Weight of M.S. Flat Bars** Materials Unit weight Size Weight lb/cft kg/cum inch mm* lb/rft kg/meter Asphalt 66 1057 ¾ x 1/8 20 x 3 0.32 0.471 Aluminium 165 2643 ¾ x 3/16 20 x 5 0.48 0.785 Bamboo 25 400 ¾ x ¼ 20 x 6 0.64 0.942 Bitumen 65 1040 1 x 1/8 25 x 3 0.43 0.589 Brass 534 8552 1 x 3/16 25 x 5 0.64 0.981 Bricks 69 1110 1 x ¼ 25 x 6 0.85 1.178 Brick ballast 60-70 960-1120 1 ¼ x 1/8 30 x 3 0.53 0.707 Brick chips 80-110 1280-1760 1 ¼ x 3/16 30 x 5 0.80 1.178 Brick work 120 1922 1 ¼ x ¼ 30 x 6 1.06 1.413 Cast iron 450 7207 1 ½ x 1/8 40 x 3 0.64 0.942 Cement 90 1440 1 ½ x 3/16 40 x 5 0.96 1.570 Cement concrete 140 2240 1 ½ x ¼ 40 x 6 1.28 1.884 Clay ( dry to wet) 115-130 1840-2080 2 x 3/3/16 50 x 5 1.28 1.9625 Coal (loose) 50 800 2 x ¼ 50 x 6 1.70 2.335 Copper 556 8905 UNIT WEIGHT OF M.S. SOLID SQUARE BARS Earth (compacted & damp) 100 1600 Size Weight Earth (dry & loose) 90 1440 inch mm* lb/rft kg/meter Garjan timber 45-50 720-800 ½ x ½ 12 x 12 0.851 1.130 Gravel 90 1440 ¾ x ¾ 20 x 20 1.914 3.140 Lead 710 11371 1 x 1 25 x 25 3.403 4.906 Lime concrete 120 1920 UNIT WEIGHT OF M.S. Z-SECTION Lime (slaked to fresh) 40-60 640-960 Size Weight Lime stone 150 2400 inch mm* lb/rft kg/meter Macadam (tar) 140 2242 ¾ x ¾ x ¾ x 1/8 20 x 20 x 20 x 3 0.851 1.272 Marble 169 2707 ¾ x ¾ x ¾ x 3/16 20 x 20 x 5 1.196 1.963 Mild steel 490 7850 1 x 1 x 1/8 25 x 25 x 3 1.170 1.625 Pebbles 90 1440 1 x 1 x 3/16 25 x 25 x 5 1.675 2.551 Plain concrete 144 2300 UNIT WEIGHT OF M.S. ANGLE Reinforced cement concrete 150 2400 Size Weight Sal wood 60-65 960-1040 inch mm* lb/rft kg/meter Sand (dry to wet) 100-120 1600-1920 ¾ x ¾ x 1/8 20 x 20 x 3 0.585 0.871 Shingles 90 1440 ¾ x ¾ x 3/16 20 x 20 x 5 0.837 1.374 Silver 656 10506 ¾ x ¾ x ¼ 20 x 20 x 6 1.063 1.601 Stone ballast 100 1600 1 x 1 x 1/8 25 x 25 x 3 0.798 1.107 Sundari wood 55-65 880-1040 1 x 1 x 3/16 25 x 25 x 5 1.156 1.766 Surki 80 1280 1 x 1 x ¼ 25 x 25 x 6 1.489 2.072 Surki mortar 85-120 1360-1920 1 ½ x 1 ½ x 1/8 40 x 40 x 3 1.223 1.813 Tar 90 1440 1 ½ x 1 ½ x 3/16 40 x 40 x 5 1.794 2.944 Teak wood 45-55 720-880 1 ½ x 1 ½ x ¼ 40 x 40 x 6 2.339 3.485 Water at 40 C 62.45 1000 2 x 2 x 3/16 50 x 50 x 5 2.432 3.729 Wrought iron 480 7688 2 x 2 x ¼ 20 x 20 x 6 3.190 4.427 2 ½ x 2 ½ x ¼ 65 x 65 x 6 4.041 5.840 3 x 3 x ¼ 75 x 75 x 6 4.891 6.782 3 x 3 x 5/16 75 x 75 x 8 6.048 8.918 ** Unit weight with respect to FPS measurements of materials * Measurements in soft conversion

PWD SoR 2022 (2nd Revised) for CIVIL Works v TABLE – 5 WEIGHT OF M.S. TEES PER RFT Size in inch Weight in lbs. Size in inch Weight in lbs. Size in inch Weight in lbs. Size in inch Weight in lbs. 1 x 1 x 1/8 0.81 1 ½ x 1 ½ x ¼ 2.35 2 ¼ x 2 ¼ x ¼ 3.64 3 x 3 x 3/8 7.20 1 x 1 x ¼ 1.54 1 ¾ x 1 ¾ x ¼ 2.79 2 ½ x 2 ½ x ¼ 4.07 3 x 3 x ½ 9.38 1 ¼ x 1 ¼ x 3/16 1.50 1 ¾ x 1 ¾ x 3/16 2.11 2 ½ x 2 ½ x 5/16 5.00 3 ½ x 3 ½ x 3/8 8.49 1 ¼ x 1 ¼ x ¼ 1.88 2 x 2 x ¼ 3.21 2 ½ x 2 ½ x 3/8 5.92 3 ½ x 3 ½ x ½ 11.08 1 ½ x 1 ½ x 3/16 1.81 2 x 2 x 3/8 4.64 3 x 3 x ¼ 4.91 TABLE – 6 WEIGHT OF M.S SHEET/PLATE PER SFT Thickness in BWG Weight in lbs. Thickness in inch Weight in lbs. Thickness in inch Weight in lbs. Thickness in inch Weight in lbs. 24 1.01 1/16 2.55 5/16 12.75 5/8 25.50 22 1.27 1/8 5.10 3/8 15.30 3/4 30.60 20 1.59 3/16 7.65 7/16 17.85 7/8 35.70 18 2.04 1/4 10.20 1/2 20.40 1 40.80

PWD SoR 2022 (2nd Revised) for CIVIL Works vi TABLE – 7 CROSS-SECTIONAL AREA AND MASS OF ROUND BAR1 Nominal Size (dia in mm) Bar No. Cross-sectional area in mm2 Perimeter in mm Mass per running meter in kg Length per 100 kg in meter 4 12.6 12.7 0.099 1010.10 5 19.6 15.71 0.154 644.35 6 2 28.3 18.85 0.222 450.45 7 38.5 21.99 0.302 331.12 8 50.3 25.13 0.395 253.16 10 3 78.5 31.42 0.616 162.34 12 4 113.0 37.70 0.888 112.61 16 5 201.0 50.27 1.579 63.33 20 6 314.0 62.83 2.466 40.55 22 7 380.0 69.11 2.980 33.56 25 8 491.0 78.54 3.854 25.95 28 9 616.0 87.96 4.830 20.70 32 10 804.0 100.53 6.313 15.8 40 1257.0 125.66 9.864 10.14 1BDS 1313: 1991

PWD SoR 2022 (2nd Revised) for CIVIL Works vii TABLE – 8 WIRE AND SHEET METAL GAUGES IN DECIMALS OF AN INCH Name of Gauge United States Standard Gauge United States Steel Wire Gauge American or Brown & Sharpe Wire Gauge New Birmingham Standard Sheet & Hoop Gauge British Imperial or English Legal Standard Wire Gauge (SWG) Birmingham or Stubs Iron Wire Gauge (BWG) Principle Use Uncoated Steel Sheets and Light Plates Steel Wire except Music Wire Non-Ferrous Sheets and Wire Iron and Steel Sheets and Hoops Wire Strips, Bands, Hoops and Wire Gauge No. Weight oz. per sq. ft. Approximate thickness in inch Thickness in inch 7/0's 0.4960 . 0.6666 0.5 6/0's 0.4615 0.5800 0.625 0.464 5/0's 0.4305 0.5165 0.5883 0.432 0.5 4/0's 0.3938 0.4600 0.5416 0.4 0.454 3/0's 0.3625 0.4096 0.5 0.372 0.425 2/0's 0.3310 0.3648 0.4452 0.348 0.38 0 0.3065 0.3249 0.3964 0.324 0.34 1 0.2830 0.2893 0.3532 0.3 0.3 2 0.2625 0.2576 0.3147 0.276 0.284 3 160 0.2391 0.2437 0.2294 0.2804 0.252 0.259 4 150 0.2242 0.2253 0.2043 0.25 0.232 0.238 5 140 0.2092 0.2070 0.1819 0.2225 0.212 0.22 6 130 0.1943 0.1920 0.1620 0.1981 0.192 0.203 7 120 0.1793 0.1770 0.1443 0.1764 0.176 0.18 8 110 0.1644 0.1620 0.1285 0.157 0.16 0.165 9 100 0.1495 0.1483 0.1144 0.1398 0.144 0.148 10 90 0.1345 0.1350 0.1019 0.125 0.128 0.134 11 80 0.1196 0.1205 0.0907 0.113 0.116 0.12 12 70 0.1046 0.1055 0.0808 0.0991 0.104 0.109 13 60 0.0897 0.0915 0.072 0.0882 0.092 0.095 14 50 0.0747 0.0800 0.0641 0.0785 0.08 0.083 15 45 0.0673 0.0720 0.0571 0.0699 0.072 0.072 16 40 0.0598 0.0625 0.0508 0.0626 0.064 0.065 17 36 0.0538 0.0540 0.0453 0.0556 0.056 0.058 18 32 0.0478 0.0475 0.0403 0.0495 0.048 0.049 19 28 0.0418 0.0410 0.0359 0.044 0.04 0.042 20 24 0.0359 0.0348 0.032 0.0392 0.036 0.035 21 22 0.0329 0.0318 0.0285 0.0349 0.032 0.032 22 20 0.0299 0.0286 0.0253 0.0313 0.028 0.028 23 18 0.0269 0.0258 0.0226 0.0278 0.024 0.025 24 16 0.0239 0.0230 0.0201 0.0248 0.022 0.022 25 14 0.0209 0.0204 0.0179 0.022 0.020 0.020 26 12 0.0179 0.0181 0.0159 0.0196 0.018 0.018 27 11 0.0164 0.0173 0.0142 0.0175 0.0164 0.016 28 10 0.0149 0.0162 0.0126 0.0156 0.048 0.014 29 9 0.0135 0.0150 0.0113 0.0139 0.036 0.013 30 8 0.0120 0.0140 0.01 0.0123 0.024 0.012 31 7 0.0105 0.0132 0.0089 0.011 0.0116 0.01 32 6.5 0.0097 0.0128 0.008 0.0098 0.0108 0.009 33 6 0.0090 0.0118 0.0071 0.0087 0.01 0.008 34 5.5 0.0082 0.0104 0.0063 0.0077 0.0092 0.007 35 5 0.0075 0.0095 0.0056 0.0069 0.0084 0.005 36 4.5 0.0067 0.0090 0.005 0.0061 0.0076 0.004 37 4.25 0.0064 0.0085 0.0045 0.0054 0.0068 38 4 0.0060 0.0080 0.004 0.0058 0.006 39 0.0075 0.0035 0.0043 0.0052 40 0.0070 0.0031 0.0039 0.0048 U.S. Standard Gauge is officially a weight Gauge, in oz. Per sq. ft as tabulated. The approximate thickness shown is the "Manufacturers' Standard" of the American Iron and Steel Institute, based on steel as weighing 501.81 Ib. per cu. ft. (489.6 true weight plus 2.5% for average over-run in area and thickness).

PWD SoR 2022 (2nd Revised) for CIVIL Works viii URL: www.rhd.gov.bd Distance Matrix (District HQ to District HQ)**, Length in kilometer

PWD SoR 2022 (2nd Revised) for CIVIL Works ix **Note: This is an indicative distance chart. Users are requested to verify the distances before using. District headquarters have been consider on the nearest RHD roads. Shortest route have been considered for measuring the distance. For the same destination, if alternate route is used, then distance will vary.

PWD SoR 2022 (2nd Revised) for CIVIL Works x MISCELLANEOUS MEASUREMENT RELATIONS  Dry volume of concrete, mortar etc. = 1.5 x wet volume(approx.)  100 maunds of slaked lime or sand or Surki = 225 cft. (2.25 cft. = 1 maund)  100 cft. of khoa or brick chips required 850 Nos. bricks of size 9.5" x 4.5" x 2.75"  Standard Bricks (9.5" x 4.5" x 2.75") 1000 Nos. = approx. 72 cft. = 2.039 cum = 3172 to 4000 kg.  1 bag of cement (British) = 1.25 cft. = 50 kg. (BDS EN 197 CEM-I)  1 Ton of C.I. Sheet (24 B.W.G.) = 10 bundles  1 bundle =  Width of C.I. Sheet = 32 inch  950 rft of barbed wire (12 B.W.G.) = 1 cwt  200 Nos. of 2.5" long nails = 1 seer  1 gallon of plastic emulsion paint / synthetic enamel paint covers 300 sft of new surface (approx.)  1 gallon of distemper covers 250 sft of new surface (approx.)  1 drum (40 kg) of snowcem covers 2070 square meters (approx.)  100 cft masonry brick work requires 1100 nos standard bricks (size 9.5" x 4.5" x 2.75") with 0.25” thickness of mortar Brick Soling:  Single brick flat soling requires : 300 Nos. bricks per % sft (Brick size 9.5" x 4.5" x 2.75")  Double brick flat soling requires : 600 Nos. bricks per % sft (Brick size 9.5" x 4.5" x 2.75")  Herringbone bond (HBB) brick soling requires : 500 Nos. bricks pre % sft (Brick size 9.5" x 4.5" x 2.75")  Brick on end edging requires : 250 Nos. bricks per % rft (Brick size 9.5" x 4.5" x 2.75") Size of C.I. sheet No of C.I. sheet Size of C.I. sheet No of C.I. sheet 6' – 0" long 12 nos 8' – 0" long 9 nos 7' – 0" long 10 nos 9' – 0" long 8 nos 10' – 0" long 7 nos

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 1 RATES OF MAN, MATERIAL AND MARK-UPS SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1 MARK-UPS 1 Contractor's Profit 10.00% 10.00% 10.00% 10.00% 2 Contractor's Overhead Expenses 3.50% 3.50% 3.50% 3.50% 3 VAT 10.00% 10.00% 10.00% 10.00% 4 Additional Incidental Expenses for Gas Line Installation Works 10.00% 10.00% 10.00% 10.00% C1 LABOUR & MAN-POWER: PER DAY 1 Head mason / Mosaic head mistry per day 800.00 800.00 750.00 750.00 2 Mason / Mosaic mistry per day 700.00 700.00 650.00 650.00 3 Skilled labour per day 600.00 580.00 550.00 550.00 4 Ordinary labour per day 550.00 540.00 500.00 500.00 5 Field Engineer (minimum BSc in Eng. with 3yrs exp or Diploma in Eng. with 8yrs exp) per day 1,900.00 1,900.00 1,900.00 1,900.00 6 Skilled technician per day 1,200.00 1,200.00 1,200.00 1,200.00 7 Semi skilled technician per day 800.00 800.00 750.00 750.00 8 Foreman/Supervisor per day 850.00 850.00 800.00 800.00 9 Electrician per day 700.00 700.00 650.00 650.00 10 Assistant Electrician per day 575.00 560.00 525.00 525.00 11 Rod binder per day 700.00 700.00 650.00 650.00 12 Mosaic mistry per day 700.00 700.00 650.00 650.00 13 Plumber per day 700.00 700.00 650.00 650.00 14 Painter per day 700.00 700.00 650.00 650.00 15 Carpenter per day 700.00 700.00 650.00 650.00 16 Welder per day 700.00 700.00 650.00 650.00 17 Polish mistry per day 700.00 700.00 650.00 650.00 18 Helper to carpenter/ painter/ plumber/ rod binder/ electrician/ polish mistry/ rig operator per day 550.00 540.00 500.00 500.00 19 Machine operator per day 700.00 700.00 650.00 650.00 20 Pile rig operator per day 700.00 700.00 650.00 650.00 21 Diesel hammer mounted rig operator per day 700.00 700.00 650.00 650.00 22 Helper to diesel hammer mounted rig operator per day 600.00 580.00 550.00 550.00 23 Rig operator including site allowances for soil exploration per day 700.00 700.00 650.00 650.00 24 Assistant laboratory technician per day 850.00 850.00 800.00 800.00 25 Laboratory technician (diploma in engineering in relevant field having minimum 3yrs exp) per day 1,400.00 1,400.00 1,400.00 1,400.00 26 Laboratory engineer (minimum BSc in relevant field with minimum 3yrs exp) per day 1,900.00 1,900.00 1,900.00 1,900.00 27 Ghorami per day 700.00 700.00 650.00 650.00 28 Sweeper for ODD JOB per use 800.00 800.00 750.00 750.00 29 Tube-well mistry per day 700.00 700.00 650.00 650.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 2 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 30 Tube-well head mistry per day 800.00 800.00 750.00 750.00 31 Surveyor (10yrs Exp / diploma Engineer trained in survey ) per day 1,400.00 1,400.00 1,400.00 1,400.00 32 Helper to surveyor per day 800.00 800.00 750.00 750.00 C2 EQUIPMENT, TOOLS & PLANTS, VEHICLE, SCAFFOLDING ETC. 33 Scaffolding per sft 10.00 10.00 10.00 10.00 34 Carrying charge of earth by 5-ton capacity truck in Dhaka/ Mymensingh per trip 2,000.00 - - - 35 Carrying charge of earth by 5-ton capacity truck in Chattogram/ Sylhet per trip - 2,000.00 - - 36 Carrying charge of earth by 5-ton capacity truck in Gopalgonj/ Barisal/ Khulna per trip - - 1,850.00 - 37 Carrying charge of earth by 5-ton capacity truck in Rajshahi/ Rangpur per trip - - - 1,850.00 38 Carriage of earth by any means for site development in Dhaka/ Mymensingh cft 8.50 - - - 39 Carriage of earth by any means for site development in Chattogram/ Sylhet cft - 8.50 - - 40 Carriage of earth by any means for site development in Gopalgonj/ Barisal/ Khulna cft - - 7.50 - 41 Carriage of earth by any means for site development in Rajshahi/ Rangpur cft - - - 7.50 42 5-ton capacity truck-fare including loading & unloading (within 30 km radius) per trip 2,300.00 2,300.00 2,100.00 2,100.00 43 Hire charge of concrete mixer machine per day 1,200.00 1,200.00 1,200.00 1,200.00 44 Hire charge of concrete vibrator per day 550.00 540.00 500.00 500.00 45 Hire charge of water pump for concreting or similar purposes per day 530.00 530.00 530.00 530.00 46 Hire charge of diesel operated 1/4 cusec capacity water pump per day 640.00 640.00 640.00 640.00 47 Hire charge of electricity operated 1 cusec capacity water pump per day 850.00 850.00 850.00 850.00 48 Hire charge of 1 cusec capacity diesel operated water pump per day 1,300.00 1,300.00 1,300.00 1,300.00 49 Fuel & lubricant for mixer machine, vibrator, pump etc. per day 1,275.00 1,275.00 1,275.00 1,275.00 50 Hire charge of mosaic cutting machine per day 550.00 550.00 550.00 550.00 51 Hire charge of marble cutting and shaping machine including cutting disc. per day 550.00 550.00 550.00 550.00 52 Hire charge of marble polishing machine including polishing stone per day 620.00 620.00 620.00 620.00 53 Hire charge of marble cutting disk per day 450.00 450.00 450.00 450.00 54 Hire charge of electric grinding machine per day 260.00 260.00 260.00 260.00 55 Hire charge of cast-in-situ pile boring complete rig set including operational expenses per day 8,500.00 8,500.00 8,500.00 8,500.00 56 Hire charge of pre-cast pile driving complete rig set including operational expenses per day 6,000.00 6,000.00 6,000.00 6,000.00 57 Hire charge of pre-cast micro pile driving complete rig set including operational expenses per day 5,000.00 5,000.00 5,000.00 5,000.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 3 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 58 Hire charge of load testing devices including hydraulic fluid: up to 200 ton capacity per test 7,000.00 7,000.00 7,000.00 7,000.00 59 Hire charge of pile load testing devices including hydraulic fluid: up to 400 ton capacity per test 9,000.00 9,000.00 9,000.00 9,000.00 60 Hire charge of diesel hammer mounted completed rig set. per day 25,200.00 25,200.00 25,200.00 25,200.00 61 Hire charge of auger boring complete rig set including operational expenses per day 76,300.00 76,300.00 76,300.00 76,300.00 62 Hire charge of crane for auger boring per day 55,000.00 55,000.00 55,000.00 55,000.00 63 Hire charge of total station per day 3,000.00 3,500.00 3,500.00 3,500.00 64 Hire charge of Hanging working Platform (Gondola) per day 1,000.00 1,000.00 1,000.00 1,000.00 65 Hire charge for air pressure pump per day 500.00 500.00 500.00 500.00 66 Hire charge of pump for dewatering per day 1,000.00 1,000.00 1,000.00 1,000.00 67 Hire charge of Crane (crawler) (50 to 55 Ton) including cost of fuel and lubricant etc. for driving/ lifting sheet pile per day 19,692.00 19,962.00 19,962.00 19,962.00 68 Hire charge of vibratory hammer for driving sheet pile per day 15,000.00 15,000.00 15,000.00 15,000.00 69 Hire charge of air compressor for auger boring per day 5,300.00 5,300.00 5,300.00 5,300.00 70 Hire charge of concreting equipment for auger boring per day 5,300.00 5,300.00 5,300.00 5,300.00 71 Hire charge of generator for auger boring per day 5,300.00 5,300.00 5,300.00 5,300.00 72 Hire charge of excavator for auger boring per day 10,000.00 10,000.00 10,000.00 10,000.00 73 Hire charge of desander for auger boring per day 6,450.00 6,450.00 6,450.00 6,450.00 74 Hire charge of mud silo for auger boring per day 1,100.00 1,100.00 1,100.00 1,100.00 75 Hire charge of water bowser for auger boring per day 5,600.00 5,600.00 5,600.00 5,600.00 76 Hire charge of hydraulic static pile driver complete rig set per day 76,200.00 76,200.00 76,200.00 76,200.00 77 Generator, fuel, lubricant for hydraulic static pile driver per day 20,400.00 20,400.00 20,400.00 20,400.00 78 Hire charge of 3HP mud pump per day 645.00 645.00 645.00 645.00 79 Hire charge of MS steel tank (6'-6" x 10'-0" x 4'-0") per trip 350.00 350.00 350.00 350.00 80 Truck fare for carrying diesel hammer mounted rig per trip 15,200.00 15,200.00 15,200.00 15,200.00 81 Hire charge of 8 - 12 ton road roller per day 6,050.00 6,050.00 6,050.00 6,050.00 82 Hire charge of vibratory (ride on) roller with 2 steel drum compactor (3-5 tons) per day 5,500.00 5,500.00 5,500.00 5,500.00 83 Hire charge of pneumatic multiple tired roller (7 tires, 8-10 tons) per day 5,000.00 5,000.00 5,000.00 5,000.00 84 Hire charge of asphalt plant per day 15,000.00 15,000.00 15,000.00 15,000.00 85 Hire charge of AC paver per day 6,100.00 6,100.00 6,100.00 6,100.00 86 Hire charge of dump truck/ tripping trucks per day 5,000.00 5,000.00 5,000.00 5,000.00 87 Hire charge of distributor per day 5,500.00 5,500.00 5,500.00 5,500.00 88 Hire charge of water tanker (truck mounted) per day 3,200.00 3,200.00 3,200.00 3,200.00 89 Hire-charge of chain dozer per day 8,200.00 8,200.00 8,200.00 8,200.00 90 Fuel & lubricants, spares, maintenance, driver etc. for 8-12 ton road roller. per day 1,500.00 1,500.00 1,500.00 1,500.00 91 Hire charge of paint spray machine per day 700.00 700.00 700.00 700.00 92 Hire charge of machine for cutting terrazzo tiles per % sft 555.00 555.00 555.00 555.00 93 Chisel for heavy duty power hammer (100 sft capacity) each 1,900.00 1,900.00 1,900.00 1,900.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 4 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 94 Hire charge of heavy duty chisel machine per day 700.00 700.00 700.00 700.00 95 Shuttering including prop for partial dismantling of R.C.C. per sft 28.00 28.00 28.00 28.00 96 Hire charge of welding machine per day 750.00 750.00 750.00 750.00 97 Hire charge of survey instrument (Level / Theodolite etc.) per day 1,000.00 1,000.00 1,000.00 1,000.00 98 Hire charge of aggregate base paver per day 30,500.00 30,500.00 30,500.00 30,500.00 99 Hire charge of Pay loader per day 13,000.00 13,000.00 13,000.00 13,000.00 100 Hire charge of motor grader per day 10,500.00 10,500.00 10,500.00 10,500.00 101 Hire charge of Rebar forging and threading machines - full set (including local carriage, power and all other related consumables) per day 12,000.00 12,000.00 12,000.00 12,000.00 102 Hire charge of cold extrusion coupler press machine - full set (including local carriage, power and all other related consumables) per day 4,500.00 4,500.00 4,500.00 4,500.00 103 Hire Charge of Compressive Strength Testing Machine with necessary accessories per month 3,000.00 3,000.00 3,000.00 3,000.00 104 Compressive Strength Testing Machine Initial Calibration each 32,500.00 32,500.00 32,500.00 32,500.00 105 Concrete Cylinder Mold each 1,350.00 1,350.00 1,350.00 1,350.00 106 10mm Tamping Rod, 300mm long each 100.00 100.00 100.00 100.00 107 Rubber Mallet each 500.00 500.00 500.00 500.00 108 Metal tray, 600mm x 450mm, 2-1.5mm thickness each 1,200.00 1,200.00 1,200.00 1,200.00 109 Steel unbonded caps for cylinder compression testing per pair 3,000.00 3,000.00 3,000.00 3,000.00 110 Elastomeric neoprene pads for specimen (assuming 150 set of cylinder and 1 pair of pad required for every 10 set cylinder) per pair 180.00 180.00 180.00 180.00 111 Slide Calipers, 300mm length each 1,000.00 1,000.00 1,000.00 1,000.00 112 Sieve with opening size 1.5" (37.5mm) each 1,350.00 1,350.00 1,350.00 1,350.00 113 Sieve with opening size 1" (25mm) each 1,350.00 1,350.00 1,350.00 1,350.00 114 Sieve with opening size 3/4" (19mm) each 1,350.00 1,350.00 1,350.00 1,350.00 115 Sieve with opening size 14mm each 1,350.00 1,350.00 1,350.00 1,350.00 116 Sieve with opening size 1/2" (12.5mm) each 1,350.00 1,350.00 1,350.00 1,350.00 117 Sieve with opening size 3/8" (9.5mm) each 1,350.00 1,350.00 1,350.00 1,350.00 118 Sieve with opening size 6.3mm each 1,350.00 1,350.00 1,350.00 1,350.00 119 Sieve No. 4 each 1,350.00 1,350.00 1,350.00 1,350.00 120 Sieve No. 8 each 1,350.00 1,350.00 1,350.00 1,350.00 121 Sieve No. 16 each 1,350.00 1,350.00 1,350.00 1,350.00 122 Sieve No. 30 each 1,350.00 1,350.00 1,350.00 1,350.00 123 Sieve No. 50 each 1,350.00 1,350.00 1,350.00 1,350.00 124 Sieve No. 100 each 1,350.00 1,350.00 1,350.00 1,350.00 125 Sieve No. 200 each 1,350.00 1,350.00 1,350.00 1,350.00 126 Pan under sieves each 1,350.00 1,350.00 1,350.00 1,350.00 127 Lid Cover for sieves each 600.00 600.00 600.00 600.00 128 Sieve Brush each 500.00 500.00 500.00 500.00 129 Weighing balance, 0.1g sensitivity, 16kg capacity, pan size 330mm ~ 220mm each 14,000.00 14,000.00 14,000.00 14,000.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 5 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 130 Metal Scoop each 500.00 500.00 500.00 500.00 131 Aggregate bowl each 500.00 500.00 500.00 500.00 132 Multiplug each 500.00 500.00 500.00 500.00 133 Slump Mold with base plate, Metal body each 2,100.00 2,100.00 2,100.00 2,100.00 134 16mm tamping rod, 600mm long each 200.00 200.00 200.00 200.00 135 Measurement tape (30 m length) each 300.00 300.00 300.00 300.00 136 Measurement tape (6 m length) each 120.00 120.00 120.00 120.00 137 Steel Tape (6 m length) each 90.00 90.00 90.00 90.00 138 Moisture meter each 3,500.00 3,500.00 3,500.00 3,500.00 139 Distance meter each 1,200.00 1,200.00 1,200.00 1,200.00 C3 WORK RATE EXCLUDING COST OF MATERIALS 140 Breaking of 50 mm down brick chips per % cft 870.00 870.00 860.00 860.00 141 Breaking of 20 mm down brick chips per % cft 970.00 970.00 960.00 960.00 142 Breaking of 12 mm (1/2") down brick chips per % cft 1,220.00 1,220.00 1,210.00 1,210.00 143 Breaking of 20 mm down stone chips per % cft 2,200.00 2,200.00 2,180.00 2,180.00 144 Breaking of 12 mm down stone chips per % cft 2,400.00 2,400.00 2,380.00 2,380.00 145 Placing and removing of shutter for formwork per sft 18.00 18.00 18.00 18.00 146 Making steel shutter for formwork per sft 90.00 90.00 90.00 90.00 147 Making steel door-window frame and shutter per sft 78.00 78.00 78.00 78.00 148 Making fixed steel glazed frame per sft 66.00 66.00 66.00 66.00 149 Making steel grill per sft 51.00 51.00 51.00 51.00 150 Filling and stitching gunny bags per bag 12.00 12.00 12.00 12.00 151 Load testing result sheet preparation per test 6,500.00 6,500.00 6,500.00 6,500.00 152 Carrying cost of timber per cft 48.00 48.00 48.00 48.00 153 Seasoning of timber in plant per cft 165.00 165.00 165.00 165.00 154 Carrying cost of steel door and window each 77.00 77.00 77.00 77.00 155 Fabrication and erection of mild steel truss Per 50 kg 2,550.00 2,550.00 2,550.00 2,550.00 156 Fitting and fixing of safety net framing system per sft 30.00 30.00 30.00 30.00 157 Fabrication of safety net per kg 25.00 25.00 25.00 25.00 158 Fabrication of light section steel per 50 kg 360.00 360.00 360.00 360.00 C4 WORK RATE INCLUDING COST OF MATERIALS 159 Point welding per point 3.00 3.00 3.00 3.00 160 Line welding (at field) per inch 5.00 5.00 5.00 5.00 161 Bituminous coating (for damp proof course (D.P.C) per % sft 920.00 920.00 900.00 900.00 162 Coal-tar (over timber surface) per sft 8.20 8.20 8.00 8.00 163 Glass pan fitting including putty per sft 18.70 18.70 18.40 18.40 164 Jute hessian (for making formwork water-tight) per sft 3.00 3.00 3.00 3.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 6 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur C5 BRICKS AND SCREEN BLOCKS 165 1st class/Picked jhama standard bricks per % 0 nos 13,000.00 13,000.00 12,500.00 12,500.00 166 Automatic machine made 1st class standard bricks per % 0 nos 16,000.00 16,000.00 16,000.00 16,000.00 167 Sand cement solid block (SCSB) (250x115x115)mm per % 0 nos 12,000.00 12,000.00 12,000.00 12,000.00 168 1st class 10 holes machine made 9.5" x 4.5" x 2.75" / 237.5 mm x 112.5 mm x 68.75 mm size ceramic bricks per % 0 nos 19,900.00 19,900.00 19,900.00 19,900.00 169 9.5" x 4.5" x 2.75"/ 237.5 mm x 112.5 mm x 68.75 mm size machine made solid klinker facing bricks per % 0 nos 14,500.00 14,500.00 14,500.00 14,500.00 170 9.5" x 4.5" x 2.75" / 237.5 mm x 112.5 mm x 68.75 mm size 10 hole machine made rock-face/textured klinker facing bricks per % 0 nos 20,000.00 20,000.00 20,000.00 20,000.00 171 9.5" x 4.5" x 2.75"/ 237.5 mm x 112.5 mm x 68.75 mm size 3 hole machine made reinforcing facing bricks per % 0 nos 23,750.00 23,750.00 23,750.00 23,750.00 172 8" x 4" x 2"/ 200 x 100 x 50 mm machine made hard pressed klinker facing bricks per % 0 nos 19,750.00 19,750.00 19,750.00 19,750.00 173 8" x 2" x 2"/ 200 x 50 x 50 mm machine made klinker facing red or maroon strips per % 0 nos 18,000.00 18,000.00 18,000.00 18,000.00 174 200 mm x 62 mm x 16.51 mm machine made clay wall tile red strips per % 0 nos 18,900.00 18,900.00 18,900.00 18,900.00 175 200 mm x 62 mm x 12.7 mm machine made clay wall tile beige strips per % 0 nos 21,500.00 21,500.00 21,500.00 21,500.00 176 200 mm x 62 mm x 8.9 mm machine made clay wall tile red strips per % 0 nos 16,900.00 16,900.00 16,900.00 16,900.00 177 241 mm x 70 mm x 12.7 mm machine made clay wall tile red strips per % 0 nos 28,500.00 28,500.00 28,500.00 28,500.00 178 241 mm x 70 mm x 12.7 mm machine made clay wall tile matt glazed textured strips per % 0 nos 34,500.00 34,500.00 34,500.00 34,500.00 179 4.5'' x 4.5'' x 4.5''/ 112.5 mm x 112.5 mm x 112.5 mm fancy screen block per % 0 nos 29,000.00 29,000.00 29,000.00 29,000.00 180 5.5'' x 5.5'' x 4'' / 137.5 mm x 137.5 mm x 100 mm fancy screen block per % 0 nos 35,000.00 35,000.00 35,000.00 35,000.00 181 6" x 6" x 4" / 150 mm x 150 mm x 100 mm fancy screen block per % 0 nos 38,000.00 38,000.00 38,000.00 38,000.00 182 8'' x 8'' x 4.25''/ 200 mm x 200 mm x 106.25 mm fancy screen block per % 0 nos 48,000.00 48,000.00 48,000.00 48,000.00 183 8'' x 4.75'' x 4''/ 200 mm x 118.75 mm x 100 mm fancy screen block per % 0 nos 48,000.00 48,000.00 48,000.00 48,000.00 184 6" x 6" x 6" / 150 mm x 150 mm x 150 mm fancy screen block per % 0 nos 38,000.00 38,000.00 38,000.00 38,000.00 185 9.5'' x 4.5'' x 2.75''/ 237.5 mm x 112.5 mm x 68.75 mm fancy screen block per % 0 nos 38,000.00 38,000.00 38,000.00 38,000.00 186 190 mm x 190 mm size glass bricks each 370.00 370.00 370.00 370.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 7 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur C6 CEMENT 187 Ordinary Portland Cement, BDS-EN - 197-1-CEM-I ,52.5N, 50 kg bag per bag 520.00 520.00 520.00 520.00 188 Portland Composite Cement ,(CEM-II/B-M 42.5N (42.5MPa) (6-20% constituents other than clinker): 50 kg bag per bag 500.00 500.00 500.00 500.00 189 White Cement per kg 27.00 27.00 27.00 27.00 C7 STONE/ BOULDER/ MOSAIC CHIPS/ BITUMEN/ ADMIXTURE/ MEMBRANE 190 Uncrushed boulder per % cft 19,604.00 20,171.00 17,784.00 16,793.00 191 19 mm (3/4") down grade crushed stone chips per % cft 21,804.00 22,371.00 19,964.00 18,973.00 192 12 mm (1/2") down grade stone chips per % cft 17,840.00 17,982.00 16,990.00 16,509.00 193 6 mm (1/4") down grade stone chips per % cft 15,500.00 15,550.00 15,200.00 15,000.00 194 Stone shingles per % cft 15,000.00 15,050.00 14,800.00 14,600.00 195 Stone dust (2.38 mm down grade) per % cft 5,500.00 5,500.00 5,400.00 5,400.00 196 Pea-gravel per % cft 9,345.00 9,345.00 8,495.10 8,495.10 197 Slaked lime per kg 25.00 25.00 25.00 25.00 198 Surki from 1st class brick per cft 113.00 113.00 109.00 109.00 199 Pakistan origin (onix) mosaic chips per kg 20.00 20.00 20.00 20.00 200 Indian origin (deradun) mosaic chips per kg 18.00 18.00 18.00 18.00 201 Pumice stone for finishing mosaic work each 175.00 175.00 175.00 175.00 202 Minar stone for finishing mosaic work each 420.00 420.00 420.00 420.00 203 Colour pigment per lbs 80.00 80.00 80.00 80.00 204 20 mm x 50 mm glass strip per foot 10.00 10.00 10.00 10.00 205 60/70 grade bitumen for road work per M. ton 89,000.00 87,000.00 91,000.00 91,000.00 206 Water-proofing PVC membrane per sqm 610.00 610.00 610.00 610.00 207 Primer for laying PVC membrane on wall per litre 580.00 580.00 580.00 580.00 208 Water reducing admixture in concrete: Type - A per litre 150.00 150.00 150.00 150.00 209 Retarding admixture in concrete: Type - B per litre 160.00 160.00 160.00 160.00 210 Accelerating admixture in concrete: Type - C per litre 110.00 110.00 110.00 110.00 211 Water reducing and retarding admixture in concrete: Type-D per litre 210.00 210.00 210.00 210.00 212 Water reducing and accelerating admixture in concrete: Type-E per litre 180.00 180.00 180.00 180.00 213 Water reducing high range admixture in concrete: Type - F per litre 210.00 210.00 210.00 210.00 214 Water reducing high range retarding admixture in concrete: Type - G per litre 155.00 155.00 155.00 155.00 215 Micro fibre for concrete per kg 740.00 740.00 740.00 740.00 216 Shutter releasing agent/ form oil per litre 180.00 180.00 180.00 180.00 217 Polymer based curing compound per litre 230.00 230.00 230.00 230.00 218 Epoxy bonding agent per litre 1,810.00 1,810.00 1,810.00 1,810.00 219 Corrosion inhibiting admixture per litre 750.00 750.00 750.00 750.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 8 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur C8 EARTH/SAND 220 Royalty of earth per % 0 cft 2,200.00 2,200.00 2,100.00 2,100.00 221 Royalty of sand per % 0 cft 6,806.00 6,940.00 6,806.00 6,806.00 222 Royalty of turf per % sft 30.00 30.00 28.00 28.00 223 Sand (F.M. 0.5) per 100 cft 1,530.00 1,544.80 1,530.60 1,530.60 224 Sand (F.M. 0.8) per % cft 1,670.00 1,680.00 1,610.00 1,610.00 225 Sand (F.M. 1.2) per % cft 1,900.00 1,915.00 1,845.00 1,845.00 226 Sand (F.M. 2.2) per % cft 5,380.00 5,200.00 5,270.00 5,210.00 C9 TIMBER / BOARD / TIMBER PRODUCT 227 Garjan/Jam/local Sal per cft 2,200.00 2,100.00 2,250.00 2,250.00 228 Mehgani per cft 2,000.00 2,000.00 2,000.00 2,000.00 229 Silkarai/Chikrashi per cft 2,500.00 2,500.00 2,500.00 2,500.00 230 Teak Chambal per cft 3,700.00 3,600.00 3,750.00 3,750.00 231 Chattogram teak per cft 4,400.00 4,300.00 4,599.00 4,599.00 232 Jessore & other local teak per cft 3,000.00 3,000.00 3,000.00 3,000.00 233 Kathal per cft 2,400.00 2,400.00 2,400.00 2,400.00 234 Gamari per cft 1,900.00 1,800.00 2,000.00 2,000.00 235 Chapalish per cft 2,300.00 2,200.00 2,400.00 2,400.00 236 Timber for formwork per cft 550.00 550.00 500.00 500.00 237 Bamboo per foot 13.50 13.50 12.00 12.00 238 Shal ballah (avg. dia 6") for driving per foot 80.00 80.00 78.00 78.00 239 Myanmar(Burma) teak veneered flush door shutter per sft 340.00 340.00 340.00 340.00 240 Champ veneered flush door shutter per sft 240.00 240.00 240.00 240.00 241 Chapalish veneered flush door shutter per sft 240.00 240.00 240.00 240.00 242 Garjan veneered flush door shutter per sft 252.00 252.00 252.00 252.00 243 Door frame:For wall finished thickness 5.75'' Hatil model no- HCL-101-101-Bch-5-88 or equivalent per rft 1,149.00 1,149.00 1,149.00 1,149.00 244 Door frame:For wall finished thickness 5.75'' Hatil model no- HCL-101-101-Bch-6-88 or equivalent per rft 1,803.00 1,803.00 1,803.00 1,803.00 245 Door shutter:Hatil Model: HCL-102-118-BCH-1-88 or equivalent per sft 1,538.00 1,538.00 1,538.00 1,538.00 246 Door shutter:Hatil Model no- HCL-102-128-BCH-1-88 or equivalent per sft 1,437.00 1,437.00 1,437.00 1,437.00 247 Door shutter:Partex model no- SD- 029 or equivalent per sft 2,315.00 2,315.00 2,315.00 2,315.00 248 Formica laminated door shutter (commercial lipping) per sft 375.90 375.90 375.90 375.90 249 HPL Sheet (0.8 mm) per sft 110.00 110.00 110.00 110.00 250 12 mm Thick MDF Board per sft 45.00 45.00 45.00 45.00 251 12 mm thick Plain Particle board : 550kg/m3 per sft 40.00 40.00 41.00 41.00 252 Melamine board (12 mm thick): 8' -0" x 4'-0" size, 700kg/m3 per pc 2,150.00 2,150.00 2,152.00 2,152.00 253 8 mm thick Melamine board per sft 36.00 36.00 36.00 36.00 254 9 mm thick gypsum board per sft 36.00 36.00 36.00 36.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 9 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 255 9 mm thick perforated gypsum board (600 mm x 600 mm grid) per sft 39.00 39.00 39.00 39.00 256 8 mm thick perforated gypsum board (600 mm x 600 mm grid) per sft 30.00 30.00 30.00 30.00 257 8 mm thick perforated gypsum board (600 mm x 1200 mm grid) per sft 42.00 42.00 42.00 42.00 258 15mm thick Perforated wooden acoustic panel per sft 360.00 360.00 360.00 360.00 259 12 mm thick gypsum board per sft 42.00 42.00 42.00 42.00 260 12 mm thick fire rated gypsum board per sft 50.00 50.00 50.00 50.00 261 12mm thick BT ply board per sft 115.00 115.00 115.00 115.00 262 18mm thick BT ply board per sft 145.00 145.00 145.00 145.00 263 5mm thick Garjan ply board per sft 50.00 50.00 50.00 50.00 264 12mm thick Garjan ply board per sft 78.00 78.00 78.00 78.00 265 18mm thick Garjan ply board per sft 110.00 110.00 110.00 110.00 266 18mm thick B.T. Marine ply board per sft 190.00 190.00 190.00 190.00 267 18mm thick HPL board per sft 375.00 375.00 375.00 375.00 268 12 mm thick laminated vinyl board: 550 kg/m3 per sft 68.00 68.00 68.00 68.00 269 12 mm thick Myanmar (Burma) Teak veneered board: 550 kg/m3 per sft 88.00 88.00 88.00 88.00 270 12 mm thick commercial veneer per sft 73.00 73.00 73.00 73.00 271 18 mm thick Myanmar (Burma) Teak veneered board per sft 110.00 110.00 110.00 110.00 272 Making hole in Myanmar (Burma) Teak board per sft 35.00 35.00 35.00 35.00 273 Fire rated Wood Acoustic Panel (WAP) per sft 500.00 500.00 500.00 500.00 274 15mm thick wooden grooved standard acoustic panel per sft 350.00 350.00 350.00 350.00 275 15mm thick wooden grooved moisture proof acoustic panel per sft 370.00 370.00 370.00 370.00 276 15mm thick wooden grooved fire retardant acoustic panel per sft 380.00 380.00 380.00 380.00 277 15 mm thick acoustic Mineral fiber board (Asian standard) per sft 60.00 60.00 60.00 60.00 278 15 mm thick acoustic Mineral fiber board (European standard) per sft 220.00 220.00 220.00 220.00 279 20mm thick Auditorium Mineral Fiber Acoustic ceiling board (Asian standard) per sft 300.00 300.00 300.00 300.00 280 20mm thick Auditorium Mineral Fiber Acoustic ceiling board (European standard) per sft 560.00 560.00 560.00 560.00 281 Myanmar (Burma) teak per cft 7,100.00 7,000.00 7,200.00 7,200.00 282 50 mm thick glass wool per sft 222.00 222.00 222.00 222.00 283 Black/ gray airtight cloth bearded per sft 75.00 75.00 75.00 75.00 284 Edging per bundle 2,000.00 2,000.00 2,000.00 2,000.00 285 18mm PVC edging per sft 3.00 3.00 3.00 3.00 286 Moulding for furniture work per sft 851.00 851.00 851.00 851.00 287 Rubber gum per kg 655.00 655.00 655.00 655.00 C10 STEEL 288 Grade 300 (300MPa/ 300N/mm2 ≈ 43500psi/ 40 Grade): BDS- 6935-2006 - B300 and Ratio fy to fu ≥1.25 per M. ton 80,000.00 80,000.00 80,000.00 80,000.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 10 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 289 Grade 400/ 420 (400MPa/ 400N/mm2 ≈ 60900 psi/ 60 Grade), BDS-6935-2006, B400: and ratio fy to fu ≥ 1.25 per M. ton 89,000.00 89,000.00 89,000.00 89,000.00 290 Grade 500 (500MPa), BDS-6935-2016 and ratio fy to fu ≥ 1.25 per M. ton 87,000.00 87,000.00 87,000.00 87,000.00 291 Upset forging parallel thread rebar Coupler for (Grade 400) 20 mm dia deformed bar each 110.00 110.00 110.00 110.00 292 Upset forging parallel thread rebar Coupler for (Grade 400) 25 mm dia deformed bar each 200.00 200.00 200.00 200.00 293 Upset forging parallel thread rebar Coupler for (Grade 400) 32 mm dia deformed bar each 300.00 300.00 300.00 300.00 294 Cold extrusion mechanical rebar Coupler for (Grade 400) 16 mm dia deformed bar each 160.00 160.00 160.00 160.00 295 Cold extrusion mechanical rebar Coupler for (Grade 400) 20 mm dia deformed bar each 240.00 240.00 240.00 240.00 296 Cold extrusion mechanical rebar Coupler for (Grade 400) 22 mm dia deformed bar each 330.00 330.00 330.00 330.00 297 Cold extrusion mechanical rebar Coupler for (Grade 400) 25 mm dia deformed bar each 450.00 450.00 450.00 450.00 298 Cold extrusion mechanical rebar Coupler for (Grade 400) 32 mm dia deformed bar each 880.00 880.00 880.00 880.00 299 18/20/22 BWG MS Sheet/plate per M. ton 77,000.00 77,000.00 77,000.00 77,000.00 300 M.S. angle, T and Z-section, Channel etc. per M. ton 70,000.00 70,000.00 70,000.00 70,000.00 301 M.S. plain bar and F.I. bar (non-structural use) per M. ton 70,000.00 70,000.00 70,000.00 70,000.00 302 MS hollow box (3 mm thick) per M. ton 140,000.00 140,000.00 140,000.00 140,000.00 303 Solid square bar per M. ton 77,000.00 77,000.00 77,000.00 77,000.00 304 0.45 mm thick C.I. sheet per M. ton 79,000.00 79,000.00 79,000.00 79,000.00 305 0.45 mm thick C.I. sheet per sqm 700.00 700.00 700.00 700.00 306 0.27 mm thick 6'-0" x 18" ridging per pc 360.00 360.00 360.00 360.00 307 0.27 mm thick 6'-0" x 18" coloured ridging per pc 420.00 420.00 420.00 420.00 308 Anchor bolt fitting charge per Kg 27.00 27.00 27.00 27.00 309 Galvanized anchor bolt of varying dia per M.Ton 125,000.00 125,000.00 125,000.00 125,000.00 310 MS plate of grade 345 MPa per M.Ton 77,000.00 77,000.00 77,000.00 77,000.00 311 MS plate of grade 275 MPa per M.Ton 74,000.00 74,000.00 74,000.00 74,000.00 312 Hot rolled W, I, S, T shape sections of grade 275 MPa per M.Ton 80,000.00 80,000.00 80,000.00 80,000.00 313 Hot rolled Steel pipe & tube of grade 275 MPa per M.Ton 135,000.00 135,000.00 135,000.00 135,000.00 314 U-shape hot rolled steel sheet pile per M.Ton 95,000.00 95,000.00 95,000.00 95,000.00 315 6 mm thick ASTM A572 Chequered plate per M.Ton 138,000.00 138,000.00 138,000.00 138,000.00 316 Roof sheet / wall sheet 0.47 mm zinc alum colour bond per M.Ton 245,000.00 245,000.00 245,000.00 245,000.00 317 MS tube/ angle per M.Ton 76,000.00 76,000.00 76,000.00 76,000.00 318 Fabrication charge for column, beam, rafter using MS plates including the cost of electricity, LP gas, machineries etc. per M.Ton 20,000.00 20,000.00 20,000.00 20,000.00 319 Fabrication charge for column, beam, rafter using Hot Rolled sections including the cost of electricity, LP gas, machineries etc. per M.Ton 12,000.00 12,000.00 12,000.00 12,000.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 11 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 320 Fabrication charge of Hot Rolled sections for shore piles of grade 250 MPa including the cost of electricity, LP gas, machineries etc. per M.Ton 5,000.00 5,000.00 5,000.00 5,000.00 321 Fabrication charge of chequered plate including the cost of electricity, LP gas, machineries etc. per M.Ton 12,000.00 12,000.00 12,000.00 12,000.00 322 Fabrication charge of roof sheet/wall sheet including the cost of electricity, LP gas, machineries etc. per M.Ton 7,500.00 7,500.00 7,500.00 7,500.00 323 MS sheet for purlin of any thickness per M.Ton 77,000.00 77,000.00 77,000.00 77,000.00 324 GP sheet for purlin of any thickness per M.Ton 118,000.00 117,000.00 118,000.00 118,000.00 325 0.70 mm thick GP decking sheet of Grade 345 MPa per M.Ton 127,000.00 127,000.00 127,000.00 127,000.00 326 0.47mm colour profile sheet per M.Ton 145,000.00 145,000.00 145,000.00 145,000.00 327 Fastener/ roof, wall screw per pcs 4.50 4.50 4.50 4.50 328 Decking screw/fastener per pcs 8.00 8.00 8.00 8.00 329 Galvanized nut bolt of varying dia ASTM 325 per Kg 280.00 280.00 280.00 280.00 330 Galvanized nut bolt of varying dia ASTM 307 per Kg 250.00 250.00 250.00 250.00 331 Fabrication charge for roof/ wall sheet per M.Ton 7,500.00 7,500.00 7,500.00 7,500.00 332 8 mm thick double bubble insulation per sqm 147.00 147.00 147.00 147.00 333 Fabrication charge for decking panel per M.Ton 9,000.00 9,000.00 9,000.00 9,000.00 334 Fabrication charge for Purlin per M.Ton 8,400.00 8,400.00 8,400.00 8,400.00 335 Erection charge for built-up or hot rolled sections per M.Ton 9,600.00 9,600.00 9,600.00 9,600.00 336 Erection charge for decking panel per Kg 8.00 8.00 8.00 8.00 337 Erection charge for purlin per Kg 4.00 4.00 4.00 4.00 338 Erection charge for roof/wall sheet including flashing and trims per Kg 8.00 8.00 8.00 8.00 339 Fitting and fixing of double bubble insulation on roof and wall sqm 50.00 50.00 50.00 50.00 340 CNC Machine cutting sft 155.00 155.00 155.00 155.00 341 Safety Shade (with 22BWG MS sheet) sft 42.75 42.75 42.75 42.75 342 Safety Net (chain link with 24BWG wire net) sft 25.00 25.00 25.00 25.00 343 Erection and de-installation per Kg 16.00 16.00 16.00 16.00 344 Galvanization at plant per Kg 55.00 55.00 55.00 55.00 345 Anti corrosive epoxy paint per litre 950.00 950.00 950.00 950.00 346 Anti corrosive red oxide paint per litre 180.00 180.00 180.00 180.00 347 Thinner for anti corrosive red oxide paint per litre 120.00 120.00 120.00 120.00 348 Red Oxide Primer per kg 3.24 3.24 3.24 3.24 349 Labour charge for red oxide painting per M.Ton 600.00 600.00 600.00 600.00 350 Labour charge for enamel painting per M.Ton 3,500.00 3,500.00 3,500.00 3,500.00 351 Labour charge for application of non-shrink grout including the cost of making shutter per cft 50.00 50.00 50.00 50.00 352 16 mm steel wire per meter 126.00 126.00 126.00 126.00 353 16 mm I bolt with heal side washer and clamp per set 178.00 178.00 178.00 178.00 354 12 mm I bolt with heal side washer and clamp per set 157.00 157.00 157.00 157.00 355 Shear stud of variable dia of grade 275 MPa per Kg 126.00 126.00 126.00 126.00 356 Making thread for sag rod per Kg 13.00 13.00 13.00 13.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 12 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 357 Nut with washer for 12 mm dia sag rod per Kg 155.00 155.00 155.00 155.00 358 cost of non-shrink grout per bag (25 kg ) per bag 1,500.00 1,500.00 1,500.00 1,500.00 359 Labour charge for wire bracing per foot 12.00 12.00 12.00 12.00 360 Local carriage, load-unload per M.Ton 1,700.00 1,700.00 1,700.00 1,700.00 C11 TILES / MARBLE STONE / GRANITE STONE 361 18 mm thick marble stone, Indian standard quality (Bansowara/ Indian grey/ Indian pink or equivalent) per sft 460.00 460.00 460.00 460.00 362 16 mm thick marble stone, Indian standard quality (Bansowara/ Indian grey/ Indian pink or equivalent) per sft 420.00 420.00 420.00 420.00 363 12 mm thick marble stone, Indian standard quality (Bansowara/ Indian grey/ Indian pink or equivalent) per sft 380.00 380.00 380.00 380.00 364 12 mm thick marble stone, Indian superior quality per sft 410.00 410.00 410.00 410.00 365 18 mm thick marble stone, Indian superior quality per sft 510.00 510.00 510.00 510.00 366 16 mm thick marble stone, Indian superior quality per sft 430.00 430.00 430.00 430.00 367 18 mm thick marble stone, Italian or equivalent per sft 650.00 650.00 650.00 650.00 368 12 mm thick marble stone, Italian or equivalent per sft 600.00 600.00 600.00 600.00 369 Country made wall tiles less than , equal or equivalent to 250mmx330mm in sizes per sft 48.00 48.00 48.00 48.00 370 Country made wall tiles more than 250 mm x 330 mm & less than 310 mm x 510 mm in sizes or equivalent per sft 65.00 65.00 65.00 65.00 371 Country made wall tiles more than 310 mm X 510 mm in sizes or equivalent per sft 85.00 85.00 85.00 85.00 372 Wall tiles less than, equal or equivalent to 250 mm x 750 mm in sizes per sft 91.00 91.00 91.00 91.00 373 Country made decor tiles per sft 103.00 103.00 103.00 103.00 374 Country made border Tiles per sft 270.00 270.00 270.00 270.00 375 Country made rustic wall tiles less than or equal to 300 mm x 600 mm per sft 92.00 92.00 92.00 92.00 376 GP (glazed/ unglazed homogeneous) 300 mm x 300 mm floor tiles country made per sft 60.00 60.00 60.00 60.00 377 GP (glazed/ unglazed Homogeneous) 400 mm x 400 mm floor tiles country made per sft 70.00 70.00 70.00 70.00 378 GP (homogeneous) 300 mm x 600 mm floor tiles per sft 79.00 79.00 79.00 79.00 379 GP (homogeneous) 600 mm x 600 mm floor tiles per sft 82.00 82.00 82.00 82.00 380 GP (homogeneous) 600 mm x 1200 mm floor tiles per sft 184.00 184.00 184.00 184.00 381 GP (homogeneous) 305 mm x 305 mm high traffic floor tiles per sft 67.00 67.00 67.00 67.00 382 GP (mirror polished) 300 mm x 300 mm floor tiles country made per sft 65.00 65.00 65.00 65.00 383 GP (mirror polished) 400 mm x 400 mm floor tiles country made per sft 82.00 82.00 82.00 82.00 384 GP (mirror polished) 600 mm x 600 mm floor tiles country made per sft 105.00 105.00 105.00 105.00 385 GP (mirror polished) 500 mm x 500 mm floor tiles country made per sft 92.00 92.00 92.00 92.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 13 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 386 GP (mirror polished) 800 mm x 800 mm floor tiles country made per sft 115.00 115.00 115.00 115.00 387 GP (mirror polished) 600 mm x 900 mm country made per sft 134.00 134.00 134.00 134.00 388 GP (mirror polished) 600 mm x 1200 mm country made per sft 165.00 165.00 165.00 165.00 389 GP Mirror Polished (Double Charge) 600 mm x 600 mm floor tiles per sft 121.00 121.00 121.00 121.00 390 GP Mirror Polished (Double Charge) 800 mm x 800 mm floor tiles per sft 156.00 156.00 156.00 156.00 391 Matt or rustic floor tiles of size 400 mm x 400 mm and min. thick 8.4 mm (country made) per sft 87.00 87.00 87.00 87.00 392 Matt or rustic floor tiles of size 600 mm x 600 mm and min. thick 9.8 mm (country made ) per sft 103.00 103.00 103.00 103.00 393 Matt or rustic floor tiles of size 800 mm x 800 mm and min. thick 9.8 mm (country made ) per sft 135.00 135.00 135.00 135.00 394 GP 300 mm x 300 mm stair tiles (country made) per sft 68.00 68.00 68.00 68.00 395 GP 300 mm x 600 mm stair tiles (country made ) per sft 97.00 97.00 97.00 97.00 396 GP 300 mm x 600 mm (Double Charge) stair tiles (country made ) per sft 136.00 136.00 136.00 136.00 397 Stair tiles size 300 mm x 600 mm foreign (China/equivalent) made per sft 110.00 110.00 110.00 110.00 398 Rustic stair tiles country made per sft 90.00 90.00 90.00 90.00 399 Rustic stair tiles foreign (China/equivalent) made per sft 95.00 95.00 95.00 95.00 400 Mirror polish 600 mm x 600 mm floor tiles foreign(China/equivalent) made per sft 150.00 150.00 150.00 150.00 401 Mirror polish 800 mm x 800 mm floor tiles foreign(China/equivalent) made per sft 170.00 170.00 170.00 170.00 402 Mirror polish 600 mm x 1200 mm floor tiles foreign(China/equivalent) made per sft 300.00 300.00 300.00 300.00 403 Mirror polish 1000 mm x1000 mm floor tiles foreign(China/equivalent) made per sft 400.00 400.00 400.00 400.00 404 Mirror polish1200 mm x 1200 mm floor tiles foreign(China/equivalent) made per sft 500.00 500.00 500.00 500.00 405 Glazed / Matt or Semi polished 300 mm x 600 mm floor tiles(Spain or equivalent) made per sft 425.00 425.00 425.00 425.00 406 Glazed / Matt or Semi polished 600 mm x 600 mm floor tiles(Spain or equivalent) made per sft 435.00 435.00 435.00 435.00 407 Glazed / Matt or Semi polished 450 mm x 900 mm floor tiles(Spain or equivalent) made per sft 450.00 450.00 450.00 450.00 408 Glazed / Matt or Semi polished 800 mm x 800 mm floor tiles(Spain or equivalent) made per sft 550.00 550.00 550.00 550.00 409 Glazed / Matt or Semi polished 600 mm x 1200 mm floor tiles(Spain or equivalent) made per sft 650.00 650.00 650.00 650.00 410 Matt or rustic floor tiles of size 600 mm x 600 mm and minimum thickness 9.8 mm foreign(China/equivalent) made per sft 180.00 180.00 180.00 180.00 411 Matt or rustic floor tiles of size 600 mm x 900 mm and minimum thickness 9.8 mm foreign (China/Malaysia or equivalent) made per sft 320.00 320.00 320.00 320.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 14 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 412 foreign (China/ equivalent) glazed wall tiles of size 300 mm x 600 mm with matching floor tiles, décor and border (if any) per sft 160.00 160.00 160.00 160.00 413 foreign (Spain or equivalent) glazed wall tiles of size 200 mm x 600 mm per sft 355.00 355.00 355.00 355.00 414 foreign (Spain or equivalent) glazed wall tiles of size 300 mm x 600 mm per sft 380.00 380.00 380.00 380.00 415 foreign (Spain or equivalent) glazed wall tiles of size 450 mm x 900 mm per sft 500.00 500.00 500.00 500.00 416 foreign (Spain or equivalent) glazed wall tiles of size 300 mm x 900 mm per sft 565.00 565.00 565.00 565.00 417 foreign (China/equivalent) rustic wall tiles of size 300 mm x 600 mm with matching floor tiles, décor and border (if any) per sft 160.00 160.00 160.00 160.00 418 20 mm to 25 mm thick machine made cement pavement tiles(country made) per sft 50.00 50.00 50.00 50.00 419 Roof tiles of size 100 mm x 200 mm or equivalent (Red colour) (country made) per % sft 14,690.00 14,690.00 14,690.00 14,690.00 420 Roof tiles of size 125 mm x 170 mm to 200 mm x 200 mm or equivalent (red colour) (country made) per % sft 17,575.00 17,575.00 17,575.00 17,575.00 421 Roof tiles of size 160 mm x 268 mm or equivalent (red colour) (country made) per % sft 15,600.00 15,600.00 15,600.00 15,600.00 422 Roof tiles of size 225 mm x 300 mm or larger (red colour) (country made) per % sft 16,200.00 16,200.00 16,200.00 16,200.00 423 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (red colour) (country made) per % sft 22,420.00 22,420.00 22,420.00 22,420.00 424 Roof tiles of size 100 mm x 200 mm or equivalent (beige colour) (country made) per % sft 14,500.00 14,500.00 14,500.00 14,500.00 425 Roof tiles of size 125 mm x 170 mm to 200 mm x 200 mm or equivalent (beige colour) (country made) per % sft 18,500.00 18,500.00 18,500.00 18,500.00 426 Roof tiles of size 225 mm x 300 mm or larger (beige colour) per % sft 18,000.00 18,000.00 18,000.00 18,000.00 427 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (beige colour) (country made) per % sft 23,600.00 23,600.00 23,600.00 23,600.00 428 Flower shaped roof tiles of size 175 mm x175 mm or equivalent (grey or black colour) (country made) per % sft 26,200.00 26,200.00 26,200.00 26,200.00 429 Pasting tiles adhesive per kg 21.00 21.00 21.00 21.00 430 Tiles grout / joint filler per kg 85.00 85.00 85.00 85.00 431 18 mm thick granite stone (Indian/equivalent) per sft 550.00 550.00 550.00 550.00 432 18 mm thick granite stone (Italian/equivalent) per sft 650.00 650.00 650.00 650.00 433 12 mm thick granite stone(Indian/equivalent) per sft 400.00 400.00 400.00 400.00 434 12 mm thick granite stone(Italian/equivalent) per sft 500.00 500.00 500.00 500.00 435 14-22 mm thick natural Kota stone (Indian or equivalent) per sft 270.00 270.00 270.00 270.00 436 foreign (China/ Malaysia or equivalent) swimming pool wall /floor tiles of size 115 mm x 240 mm per sft 190.00 190.00 190.00 190.00 437 Acid stone each 450.00 450.00 450.00 450.00 438 Water Proofing Paper (12 Size) each 22.00 22.00 22.00 22.00 439 Water Proofing Paper (320 Size) each 24.00 24.00 24.00 24.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 15 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur C12 PROPS / PIPES / I-SECTION/BOX CHANNEL FOR CONCRETING WORK 440 Bamboo prop including top supports each 138.00 138.00 138.00 138.00 441 Salballah prop including top supports each 1,150.00 1,150.00 1,150.00 1,150.00 442 50 mm/2" dia M.S. pipe per foot 162.00 162.00 162.00 162.00 443 38 mm/1.5" dia M.S. pipe per foot 135.00 135.00 135.00 135.00 444 19 mm/0.75" dia M.S. pipe per foot 66.00 66.00 66.00 66.00 445 38 mm dia swivel clamp each 85.00 85.00 85.00 85.00 446 32 mm dia MS nipple each 75.00 75.00 75.00 75.00 447 50 mm/2" dia G.I. pipe per foot 215.00 215.00 215.00 215.00 448 38 mm/1.5" dia G.I. pipe per foot 175.00 175.00 175.00 175.00 449 19 mm/3/4" dia G.I. pipe per foot 82.00 82.00 82.00 82.00 450 13 mm/1/2" dia G.I. pipe per foot 61.00 61.00 61.00 61.00 451 Adjustable mechanism including top and bottom plate per set 624.00 624.00 624.00 624.00 452 I-section joist to support inclined prop per foot 425.00 425.00 425.00 425.00 453 4" x 2" M.S. box channel with 1/8" thick M.S. sheet per foot 370.00 370.00 370.00 370.00 454 Steel prop with adjustable mechanism including top and bottom plate per set 1,700.00 1,700.00 1,700.00 1,700.00 455 Turn-buckle including tie rod per set 450.00 450.00 450.00 450.00 C13 PAINT / POLISHING 456 Standard exterior emulsion paint per litre 310.00 310.00 310.00 310.00 457 Premium exterior emulsion paint per litre 430.00 430.00 430.00 430.00 458 Sealer for exterior emulsion paint per litre 195.00 195.00 195.00 195.00 459 Standard Silicon based paint/coating per litre 350.00 350.00 350.00 350.00 460 Premium Silicon based paint/coating per litre 950.00 950.00 950.00 950.00 461 Ready-mix putty ( exterior) per kg 64.00 64.00 64.00 64.00 462 Ready-mix putty ( interior) per kg 80.00 80.00 80.00 80.00 463 Thinner for oil-based paint (turpentine) for general purpose per litre 130.00 130.00 130.00 130.00 464 Synthetic polyvinyl (S.P.) distemper per litre 102.00 102.00 102.00 102.00 465 Synthetic polyvinyl (S.P.) distemper primer /sealer per litre 175.00 175.00 175.00 175.00 466 Acrylic plastic emulsion paint (plastic/matt finish) per litre 245.00 245.00 245.00 245.00 467 Acrylic plastic emulsion paint (silky finish) per litre 437.00 437.00 437.00 437.00 468 Acrylic plastic emulsion paint (odorless) per litre 669.00 669.00 669.00 669.00 469 Sealer for acrylic plastic emulsion paint per litre 172.00 172.00 172.00 172.00 470 Standard synthetic enamel paint per litre 220.00 220.00 220.00 220.00 471 Premium synthetic enamel paint per litre 290.00 290.00 290.00 290.00 472 Oil based anticorrosive primer per litre 196.00 196.00 196.00 196.00 473 Thinner for oil-based paint (turpentine) for general purpose per litre 130.00 130.00 130.00 130.00 474 Chlorinated rubber paint per litre 638.00 638.00 638.00 638.00 475 Chlorinated rubber sealer per litre 503.00 503.00 503.00 503.00 476 Chlorinated rubber paint thinner per litre 208.00 208.00 208.00 208.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 16 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 477 Ultra Violet (UV) Lacquer Polish on both sides of wooden surface per sft 350.00 350.00 350.00 350.00 478 Standard Duco Paint per litre 1,700.00 1,700.00 1,700.00 1,700.00 479 Premium Duco Paint per litre 1,950.00 1,950.00 1,950.00 1,950.00 480 Standard Tua colour per litre 270.00 270.00 270.00 270.00 481 Premium Tua colour per litre 340.00 340.00 340.00 340.00 482 Standard NC Thinner for duco paint per gallon 700.00 700.00 700.00 700.00 483 Premium NC Thinner for duco paint per gallon 1,000.00 1,000.00 1,000.00 1,000.00 484 Standard Al Karin Astor per gallon 850.00 850.00 850.00 850.00 485 Premium Al Karin Astor per gallon 1,180.00 1,180.00 1,180.00 1,180.00 486 Hardener (putty) for doco paint per litre 1,300.00 1,300.00 1,300.00 1,300.00 487 Hardener( hyco.mat) per litre 2,200.00 2,200.00 2,200.00 2,200.00 488 steel Formica each 25.00 25.00 25.00 25.00 489 Wood grain filler per kg 820.00 820.00 820.00 820.00 490 PU base coat clear sealer per litre 520.00 520.00 520.00 520.00 491 PU top coat pigmented per litre 1,050.00 1,050.00 1,050.00 1,050.00 492 PU general purpose hardener per litre 695.00 695.00 695.00 695.00 493 Wood putty clear per kg 900.00 900.00 900.00 900.00 494 Solvent stain teak per litre 1,505.00 1,505.00 1,505.00 1,505.00 495 Solvent stain walnut per litre 3,000.00 3,000.00 3,000.00 3,000.00 496 Solvent stain mahogany per litre 3,000.00 3,000.00 3,000.00 3,000.00 497 Thermo plastic paint per litre 1,375.00 1,375.00 1,375.00 1,375.00 498 Epoxy enamel primer including base, curing agent & thinner per litre 520.00 520.00 520.00 520.00 499 Epoxy enamel paint including base, curing agent & thinner per litre 450.00 450.00 450.00 450.00 500 Textured coating including sealer, texture coat & top coat per litre 270.00 270.00 270.00 270.00 501 Wood varnishing: Yacht (alkyd based) per litre 280.00 280.00 280.00 280.00 502 Wood varnishing: Egg-shell (alkyd based) per litre 280.00 280.00 280.00 280.00 503 Wood varnishing: Matt (alkyd based) per litre 290.00 290.00 290.00 290.00 504 Thinner for alkyd based wood varnishing per litre 131.00 131.00 131.00 131.00 505 Self leveling epoxy coating (3 mm thickness) per sft 135.00 135.00 135.00 135.00 506 Self leveling epoxy coating (4 mm thickness) per sft 161.00 161.00 161.00 161.00 507 Self leveling epoxy coating (5 mm thickness) per sft 225.00 225.00 225.00 225.00 508 Oxalic acid per litre 105.00 105.00 105.00 105.00 509 Wax for polishing per kg 300.00 300.00 300.00 300.00 510 Design Paint including base coat, design coat & protection coat per litre 417.00 417.00 417.00 417.00 French-Polishing 511 French powder per kg 30.00 30.00 30.00 30.00 512 Spirit per Ib 150.00 150.00 150.00 150.00 513 Gala per kg 900.00 900.00 900.00 900.00 514 Karpa per kg 550.00 550.00 550.00 550.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 17 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 515 Sand paper each 16.00 16.00 16.00 16.00 516 Putty per kg 107.00 107.00 107.00 107.00 517 Markin cloth per yard 12.00 12.00 12.00 12.00 518 Shari cloth each 30.00 30.00 30.00 30.00 519 Tuli / Hockey brush each 30.00 30.00 30.00 30.00 520 Cotton per lbs 105.00 105.00 105.00 105.00 C14 ALUMINIUM : I. Aluminium Channel / Sections: Rate per foot 521 101.60 mm, 44.45 mm wall frame of 1.5 mm thick (Anodized at any colour) per foot 154.50 154.50 154.50 154.50 522 101.60 mm, 44.45 mm wall frame of 1.5 mm thick (Powder coated at any colour) per foot 177.50 177.50 177.50 177.50 523 54 mm, 46 mm shutter side of 2.0 mm thick (Anodized at any colour) per foot 139.00 139.00 139.00 139.00 524 54 mm, 46 mm shutter side of 2.0 mm thick (Powder coated at any colour) per foot 169.50 169.50 169.50 169.50 525 16.54 mm, 15.49 mm Door glass bit of 0.99 mm thick (Anodized at any colour) per foot 19.00 19.00 19.00 19.00 526 16.54 mm, 15.49 mm Door glass bit of 0.99 mm thick (Powder coated at any colour) per foot 20.50 20.50 20.50 20.50 527 101.60 mm, 42.93 mm closure section of 1.8 mm thick(Anodized at any colour) per foot 134.00 134.00 134.00 134.00 528 101.60 mm, 42.93 mm closure section of 1.8 mm thick(Powder coated at any colour) per foot 161.00 161.00 161.00 161.00 529 101.60 mm closure cover of 1.5 mm thick (Anodized at any colour) per foot 51.00 51.00 51.00 51.00 530 101.60 mm closure cover of 1.5 mm thick (Powder coated at any colour) per foot 62.00 62.00 62.00 62.00 531 101.60 mm, 12.70 mm floor bottom of 4 mm thick (Anodized at any colour) per foot 140.00 140.00 140.00 140.00 532 101.60 mm, 12.70 mm floor bottom of 4 mm thick (Powder coated at any colour) per foot 172.50 172.50 172.50 172.50 533 82.60 mm, 43.99 mm door shutter bottom of 1.8 mm thick (Anodized at any colour) per foot 176.00 176.00 176.00 176.00 534 82.60 mm, 43.99 mm door shutter bottom of 1.8 mm thick (Powder coated at any colour) per foot 205.50 205.50 205.50 205.50 535 51 mm, 43.99 mm door shutter top of 1.8 mm thick (Anodized at any colour) per foot 147.00 147.00 147.00 147.00 536 51 mm, 43.99 mm door shutter top of 1.8 mm thick (Powder coated at any colour) per foot 169.00 169.00 169.00 169.00 537 101.60 mm, 38.10 mm, 25.4 mm door handle (short) of 2.3 mm, 2.3 mm, 4.01 mm thick (Anodized at any colour) per foot 194.00 194.00 194.00 194.00 538 101.60 mm, 38.10 mm, 25.4 mm door handle (short) of 2.3 mm, 2.3 mm, 4.01 mm thick (Powder coated at any colour) per foot 227.50 227.50 227.50 227.50 539 101.60 mm, 44.45 mm top & side minimum 1.2 mm thick (Anodized at any colour) per foot 180.00 180.00 180.00 180.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 18 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 540 101.60 mm, 44.45 mm top & side minimum 1.2 mm thick (Powder coated at any colour) per foot 196.00 196.00 196.00 196.00 541 101.35 mm, 44.45 mm bottom of minimum 1.2 mm thick (Anodized at any colour) per foot 108.00 108.00 108.00 108.00 542 101.35 mm, 44.45 mm bottom of minimum 1.2 mm thick (Powder coated at any colour) per foot 151.00 151.00 151.00 151.00 543 44.32 mm, 19.61 mm fixed bottom cover of minimum 1.2 mm thick(Anodized at any colour) per foot 55.00 55.00 55.00 55.00 544 44.32 mm, 19.61 mm fixed bottom cover of minimum 1.2 mm thick(Powder coated at any colour) per foot 67.50 67.50 67.50 67.50 545 83.21mm, 16.00 mm fixed grouve cover of minimum 1.2 mm thick (Anodized at any colour) per foot 81.00 81.00 81.00 81.00 546 83.21mm, 16.00 mm fixed grouve cover of minimum 1.2 mm thick (Powder coated at any colour) per foot 96.00 96.00 96.00 96.00 547 39.09mm, 14.81mm fixed glass protector of 1.0 mm thick (Anodized at any colour) per foot 27.00 27.00 27.00 27.00 548 39.09mm, 14.81mm fixed glass protector of 1.0 mm thick (Powder coated at any colour) per foot 34.00 34.00 34.00 34.00 549 15.75 mm, 14.81mm fixed glass protector bit of 0.99 mm thick (Anodized at any colour) per foot 19.00 19.00 19.00 19.00 550 15.75 mm, 14.81mm fixed glass protector bit of 0.99 mm thick (Powder coated at any colour) per foot 23.00 23.00 23.00 23.00 551 75.50 mm, 17.79 mm outer low bottom of minimum 1.2 mm thick (Anodized at any colour) per foot 90.00 90.00 90.00 90.00 552 75.50 mm, 17.79 mm outer low bottom of minimum 1.2 mm thick (Powder coated at any colour) per foot 113.00 113.00 113.00 113.00 553 75.5 mm, 28.50 mm outer top of minimum 1.2 mm thick (Anodized at any colour) per foot 106.00 106.00 106.00 106.00 554 75.5 mm, 28.50 mm outer top of minimum 1.2 mm thick(Powder coated at any colour) per foot 126.00 126.00 126.00 126.00 555 33 mm, 26.80 mm, shutter top of minimum 1.2 mm thick (Anodized at any colour) per foot 64.00 64.00 64.00 64.00 556 33 mm, 26.80 mm, shutter top of 1.3 mm thick (Powder coated at any colour) per foot 87.50 87.50 87.50 87.50 557 60 mm, 24.40 mm shutter bottom of minimum 1.2 mm thick (Anodized at any colour) per foot 89.00 89.00 89.00 89.00 558 60 mm, 24.40 mm shutter bottom of minimum 1.2 mm thick (Powder coated at any colour) per foot 123.50 123.50 123.50 123.50 559 75.50 mm, 19.90 mm outer side of minimum 1.2 mm thick (Anodized at any colour) per foot 80.00 80.00 80.00 80.00 560 75.50 mm, 19.90 mm outer side of minimum 1.2 mm thick (Powder coated at any colour) per foot 105.00 105.00 105.00 105.00 561 49.20 mm, 25.80 mm shutter lock of minimum 1.2 mm thick (Anodized at any colour) per foot 82.00 82.00 82.00 82.00 562 49.20 mm, 25.80 mm shutter lock of minimum 1.2 mm thick (Powder coated at any colour) per foot 116.50 116.50 116.50 116.50 563 34.40 mm, 32.10 mm shutter inter lock of minimum 1.2 mm thick (Anodized at any colour) per foot 85.00 85.00 85.00 85.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 19 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 564 34.40 mm, 32.10 mm shutter inter lock of minimum 1.2 mm thick (Powder coated at any colour) per foot 111.00 111.00 111.00 111.00 565 31.75 mm shutter divider of minimum 1.2 mm thick (Anodized at any colour) per foot 68.00 68.00 68.00 68.00 566 31.75 mm shutter divider of minimum 1.2 mm thick (Powder coated at any colour) per foot 82.00 82.00 82.00 82.00 567 7.14 mm spandrel of 1.5 mm thick (Anodized at any colour) per foot 118.50 118.50 118.50 118.50 568 7.14 mm spandrel of 1.5 mm thick (Powder coated at any colour) per foot 138.00 138.00 138.00 138.00 569 75.50 mm, 32 mm outer bottom (high) of minimum 1.2 mm thick (Anodized at any colour) per foot 98.00 98.00 98.00 98.00 570 75.50 mm, 32 mm outer bottom (high) of minimum 1.2 mm thick (Powder coated at any colour) per foot 123.50 123.50 123.50 123.50 571 95 mm, 22.39 mm outer bottom (low) of minimum 1.2 mm thick (Anodized at any colour) per foot 105.50 105.50 105.50 105.50 572 95 mm, 22.39 mm outer bottom (low) of minimum 1.2 mm thick (Powder coated at any colour) per foot 121.00 121.00 121.00 121.00 573 95.5 mm, 28.50 mm outer top of minimum 1.2 mm thick (Anodized at any colour) per foot 119.00 119.00 119.00 119.00 574 95.5 mm, 28.50 mm outer top of minimum 1.2 mm thick (Powder coated at any colour) per foot 180.00 180.00 180.00 180.00 575 17.40 mm, 31.78 mm bottom cover of minimum 1.2 mm thick (Anodized at any colour) per foot 41.00 41.00 41.00 41.00 576 17.40 mm, 31.78 mm bottom cover of minimum 1.2 mm thick (Powder coated at any colour) per foot 53.50 53.50 53.50 53.50 577 76.20 mm, 38.10 mm fixed bottom of minimum 1.2 mm thick (Anodized at any colour) per foot 121.00 121.00 121.00 121.00 578 76.20 mm, 38.10 mm fixed bottom of minimum 1.2 mm thick (Powder coated at any colour) per foot 139.00 139.00 139.00 139.00 579 57.15 mm, 15.88 mm grouve cover of minimum 1.2 mm thick (Anodized at any colour) per foot 62.00 62.00 62.00 62.00 580 57.15 mm, 15.88 mm grouve cover of minimum 1.2 mm thick (Powder coated at any colour) per foot 81.00 81.00 81.00 81.00 581 76.20 mm, 38.10 mm, 57.15 mm fixed top & side of minimum 1.2 mm thick (Anodized at any colour) per foot 134.00 134.00 134.00 134.00 582 76.20 mm, 38.10 mm, 57.15 mm fixed top & side of minimum 1.2 mm thick (Powder coated at any colour) per foot 156.50 156.50 156.50 156.50 583 38.88 mm, 36.63 mm casement outer 1.5 mm thick (Anodized at any colour) per foot 57.00 57.00 57.00 57.00 584 38.88 mm, 36.63 mm casement outer 1.5 mm thick (Powder coated at any colour) per foot 66.50 66.50 66.50 66.50 585 47.62 mm, 28.57 mm, 40.82 mm casement shutter of 1.9 mm thick (Anodized at any colour) per foot 98.00 98.00 98.00 98.00 586 47.62 mm, 28.57 mm, 40.82 mm casement shutter of 1.9 mm thick (Powder coated at any colour) per foot 116.00 116.00 116.00 116.00 587 15.87 mm, 27.00 mm casement glass clip of 1.245 mm thick (Anodized at any colour) per foot 29.00 29.00 29.00 29.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 20 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 588 15.87 mm, 27.00 mm casement glass clip of 1.245 mm thick(Powder coated at any colour) per foot 33.50 33.50 33.50 33.50 589 76.00 mm, 38.10 mm wall frame of minimum 1.2 mm thick (Anodized at any colour) per foot 97.00 97.00 97.00 97.00 590 76.00 mm, 38.10 mm wall frame of minimum 1.2 mm thick (Powder coated at any colour) per foot 123.00 123.00 123.00 123.00 591 55.02 mm, 37.39 mm louver Z-section of 1.5 mm thick (Anodized at any colour) per foot 54.00 54.00 54.00 54.00 592 55.02 mm, 37.39 mm louver Z-section of 1.5 mm thick (Powder coated at any colour) per foot 62.00 62.00 62.00 62.00 593 39.67 mm, 15.06 mm louver outer U-section of minimum 1.2 mm thick (Anodized at any colour) per foot 39.00 39.00 39.00 39.00 594 39.67 mm, 15.06 mm louver outer U-section of minimum 1.2 mm thick (Powder coated at any colour) per foot 47.50 47.50 47.50 47.50 595 95.00 mm, 38.00 mm outer bottom of minimum 1.2 mm thick (Anodized at any colour) per foot 119.00 119.00 119.00 119.00 596 95.00 mm, 38.00 mm outer bottom of minimum 1.2 mm thick (Powder coated at any colour) per foot 150.00 150.00 150.00 150.00 597 95.00 mm, 28.50 mm outer top of minimum 1.2 mm thick (Anodized at any colour) per foot 119.00 119.00 119.00 119.00 598 95.00 mm, 28.50 mm outer top of minimum 1.2 mm thick (Powder coated at any colour) per foot 180.00 180.00 180.00 180.00 599 95.00 mm, 19.50 mm outer side of minimum 1.2 mm thick (Anodized at any colour) per foot 95.00 95.00 95.00 95.00 600 95.00 mm, 19.50 mm outer side of minimum 1.2 mm thick (Powder coated at any colour) per foot 126.50 126.50 126.50 126.50 601 42.2 mm, 13.2 mm net section of minimum 1.2 mm thickness (Anodized at any colour) per foot 61.00 61.00 61.00 61.00 602 42.2 mm, 13.2 mm net section of minimum 1.2 mm thickness (Powder coated at any colour) per foot 79.00 79.00 79.00 79.00 603 91.50 mm, 38.00 mm outer bottom of 1.5 mm thick EDF(Anodized at any colour) per foot 124.50 124.50 124.50 124.50 604 91.50 mm, 38.00 mm outer bottom of 1.5 mm thick EDF(Powder coated at any colour) per foot 143.00 143.00 143.00 143.00 605 91.00 mm, 28.70 mm outer top of 1.5 mm thick EDF(Anodized at any colour) per foot 133.00 133.00 133.00 133.00 606 91.00 mm, 28.70 mm outer top of 1.5 mm thick EDF(Powder coated at any colour) per foot 152.50 152.50 152.50 152.50 607 65.00 mm, 27.30 mm shutter top of 1.5 mm thick EDF(Anodized at any colour) per foot 119.00 119.00 119.00 119.00 608 65.00 mm, 27.30 mm shutter top of 1.5 mm thick EDF(Powder coated at any colour) per foot 136.00 136.00 136.00 136.00 609 72.20 mm, 24.65 mm shutter bottom of 1.5 mm thick EDF(Anodized at any colour) per foot 129.00 129.00 129.00 129.00 610 72.20 mm, 24.65 mm shutter bottom of 1.5 mm thick EDF(Powder coated at any colour) per foot 148.00 148.00 148.00 148.00 611 91.50 mm, 28.50 mm outer side of 1.5 mm thick EDF(Anodized at any colour) per foot 125.50 125.50 125.50 125.50

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 21 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 612 91.50 mm, 28.50 mm outer side of 1.5 mm thick EDF (Powder coated at any colour) per foot 144.00 144.00 144.00 144.00 613 65.30 mm, 26.00 mm shutter lock of 1.5 mm thick EDF (Anodized at any colour) per foot 109.50 109.50 109.50 109.50 614 65.30 mm, 26.00 mm shutter lock of 1.5 mm thick EDF (Powder coated at any colour) per foot 125.50 125.50 125.50 125.50 615 55.20 mm, 26.00 mm inter lock of 1.5 mm thick EDF (Anodized at any colour) per foot 118.00 118.00 118.00 118.00 616 55.20 mm, 26.00 mm inter lock of 1.5 mm thick EDF (Powder coated at any colour) per foot 135.00 135.00 135.00 135.00 617 55.20 mm, 13.20 mm net section of 1.5 mm thick EDF (Anodized at any colour) per foot 85.50 85.50 85.50 85.50 618 55.20 mm, 13.20 mm net section of 1.5 mm thick EDF (Powder coated at any colour) per foot 98.00 98.00 98.00 98.00 619 1 in square pipe (Anodized at any colour) per foot 41.00 41.00 41.00 41.00 620 1 in square pipe (Powder coated at any colour) per foot 52.50 52.50 52.50 52.50 621 Mosquito net (fiber net) per sft 20.00 20.00 20.00 20.00 622 T-section (main T) for false ceiling (Anodized at any colour) per foot 28.00 28.00 28.00 28.00 623 T-section (main T) for false ceiling (Powder coated at any colour) per foot 30.00 30.00 30.00 30.00 624 T-section (cross T) for false ceiling (Anodized at any colour) per foot 24.00 24.00 24.00 24.00 625 T-section (cross T) for false ceiling (Powder coated at any colour) per foot 26.00 26.00 26.00 26.00 626 L-section for wall and ceiling (Anodized at any colour) per foot 23.00 23.00 23.00 23.00 627 L-section for wall and ceiling (Powder coated at any colour) per foot 25.00 25.00 25.00 25.00 628 Aluminium curtain rail including hard-wares and fittings (Anodized at any colour) per foot 31.00 31.00 31.00 31.00 629 Aluminium curtain rail including hard-wares and fittings (Powder coated at any colour) per foot 38.50 38.50 38.50 38.50 630 44 mm, 44 mm, 1.50 mm thick box (Anodized at any colour) per foot 117.00 117.00 117.00 117.00 631 44 mm, 44 mm, 1.50 mm thick box (Powder coated at any colour) per foot 134.00 134.00 134.00 134.00 632 25 mm, 25 mm, 1.50 mm thick angle (Anodized at any colour) per foot 49.50 49.50 49.50 49.50 633 25 mm, 25 mm, 1.50 mm thick angle (Powder coated at any colour) per foot 59.50 59.50 59.50 59.50 634 50 mm, 25 mm, 1.5 mm thick box (Anodized at any colour) per foot 110.50 110.50 110.50 110.50 635 50 mm, 25 mm, 1.5 mm thick box (Powder coated at any colour) per foot 127.00 127.00 127.00 127.00 636 25 mm, 32 mm,3.0 mm thick fitting angle (Anodized at any colour) per foot 71.00 71.00 71.00 71.00 637 25 mm, 32 mm,3.0 mm thick fitting angle (Powder coated at any colour) per foot 80.50 80.50 80.50 80.50 638 25 mm, 25 mm, 2.0 mm thick box (Anodized at any colour) per foot 93.50 93.50 93.50 93.50 639 25 mm, 25 mm, 2.0 mm thick box (Powder coated at any colour) per foot 119.00 119.00 119.00 119.00 640 Aluminium composite Panel Fire Rated per sft 550.00 550.00 550.00 550.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 22 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 641 Curtain wall sub mullium (134mm X70 mm X 3.5 mm) (Anodized at any colour) per foot 728.00 728.00 728.00 728.00 642 Curtain wall sub mullium (134mm X70 mm X 3.5 mm) (Powder coated at any colour) per foot 835.00 835.00 835.00 835.00 643 Curtain wall sub mullium (100mm X 50 mm X 2.00 mm) (Anodized at any colour) per foot 333.00 333.00 333.00 333.00 644 Curtain wall sub mullium (100mm X 50 mm X 2.00 mm) (Powder coated at any colour) per foot 365.50 365.50 365.50 365.50 645 Curtain wall sub mullium (50mm X 50 mm X 2.00 mm) (Anodized at any colour) per foot 212.00 212.00 212.00 212.00 646 Curtain wall sub mullium (50mm X 50 mm X 2.00 mm) (Powder coated at any colour) per foot 243.00 243.00 243.00 243.00 647 Casement outer frame (29mm X 20 mm X 1.50 mm) (Anodized at any colour) per foot 30.00 30.00 30.00 30.00 648 Casement outer frame (29mm X 20 mm X 1.50 mm) (Powder coated at any colour) per foot 33.50 33.50 33.50 33.50 649 Casement shutter section (58.40 mm X 37.20 mm X 57.40 mm X 3.0 mm) (Anodized at any colour) per foot 160.00 160.00 160.00 160.00 650 Casement shutter section (58.40 mm X 37.20 mm X 57.40 mm X 3.0 mm) (Powder coated at any colour) per foot 208.00 208.00 208.00 208.00 651 Aluminium angle (50 mm X 50 mm X 6 mm) (Anodized at any colour) per foot 249.00 249.00 249.00 249.00 652 Aluminium angle (50 mm X 50 mm X 6 mm) (Powder coated at any colour) per foot 294.00 294.00 294.00 294.00 653 Aluminium cover (63.50 mm X 25.60 mm X 2.0 mm) (Anodized at any colour) per foot 79.00 79.00 79.00 79.00 654 Aluminium cover (63.50 mm X 25.60 mm X 2.0 mm) (Powder coated at any colour) per foot 81.50 81.50 81.50 81.50 655 50mm X 6 mm X 2 mm angle for casement shutter (Anodized at any colour) per foot 83.00 83.00 83.00 83.00 656 50 mm X 6 mm X 2 mm angle for casement shutter (Powder coated at any colour) per foot 82.00 82.00 82.00 82.00 657 38 mm x 38 mm Aluminium frame (Wall box) of 2.0 mm (Anodized at any colour) per foot 136.00 136.00 136.00 136.00 658 38 mm x 38 mm Aluminium frame (Wall box) of 2.0 mm (Powder coated at any colour) per foot 158.50 158.50 158.50 158.50 659 20 mm Aluminium pipe (Anodized at any colour) per foot 95.00 119.50 119.50 119.50 660 20 mm Aluminium pipe (Powder coated at any colour) per foot 125.50 125.50 125.50 125.50 661 44 mm X 44 mm aluminium box per foot 82.00 82.00 82.00 82.00 662 25 mm Aluminium pipe per foot 140.00 140.00 140.00 140.00 663 100 mm x 25 mm wall frame of 1.20 mm thick per foot 137.50 137.50 137.50 137.50 664 125 mm x 50 mm aluminium box section per foot 342.00 342.00 342.00 342.00 665 Butterfly hanger per foot 43.50 43.50 43.50 43.50 II. Accessories for aluminium door-window works 666 Swing door closure set 3,200.00 3,200.00 3,200.00 3,200.00 667 Swing door lock set 750.00 750.00 750.00 750.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 23 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 668 Swing door Mohiar foot 5.00 5.00 5.00 5.00 669 Fixed Neoprene foot 3.00 3.00 3.00 3.00 670 Flush bolt set 320.00 320.00 320.00 320.00 671 Argon gas charge for double glazing glass sft 30.00 30.00 30.00 30.00 672 Insulated Gum/Structural silicon for Gas sealing in double glazing glass sft 70.00 70.00 70.00 70.00 673 Aluminium slp,desiccant(silica gel) for double glazing glass sft 50.00 50.00 50.00 50.00 674 1.52 mm thick PVB lamination per foot 250.00 250.00 250.00 250.00 675 1/2" x 2.5" nut-bolt set 32.00 32.00 32.00 32.00 676 Sliding door lock set 200.00 200.00 200.00 200.00 677 Sliding door show lock set 110.00 110.00 110.00 110.00 678 Sliding door /window wheel no 80.00 80.00 80.00 80.00 679 Sliding door /window Mohiar foot 1.50 1.50 1.50 1.50 680 Sliding Neoprene foot 2.80 2.80 2.80 2.80 681 Sealant gm 3.10 3.10 3.10 3.10 682 Sliding window key lock set 90.00 90.00 90.00 90.00 683 Bolts and Screws including sealants LS 75.00 75.00 75.00 75.00 684 4-bar hinge each 750.00 750.00 750.00 750.00 685 Casement handle each 252.00 252.00 252.00 252.00 686 Rivet each 5.00 5.00 5.00 5.00 687 Rivets (normal) each 2.00 2.00 2.00 2.00 688 S.S. screws each 2.50 2.50 2.50 2.50 689 Screws each 1.00 1.00 1.00 1.00 690 5 mm tinted glass sft 90.00 90.00 90.00 90.00 691 5 mm tinted tempered glass sft 155.00 155.00 155.00 155.00 692 5 mm clear glass sft 71.00 71.00 71.00 71.00 693 5 mm clear tempered glass sft 162.00 162.00 162.00 162.00 694 5 mm ambushed glass sft 70.00 70.00 70.00 70.00 695 5 mm reflective glass sft 102.00 102.00 102.00 102.00 696 5 mm reflective tempered glass sft 190.00 190.00 190.00 190.00 697 6 mm clear glass sft 90.00 90.00 90.00 90.00 698 6 mm clear tempered glass sft 190.00 190.00 190.00 190.00 699 6 mm ambushed glass sft 170.00 170.00 170.00 170.00 700 6 mm reflective glass sft 115.00 115.00 115.00 115.00 701 6 mm reflective tempered glass sft 187.00 187.00 187.00 187.00 702 6 mm low-E clear glass sft 195.00 195.00 195.00 195.00 703 6 mm low-E clear tempered glass sft 280.00 280.00 280.00 280.00 704 8 mm clear glass sft 130.00 130.00 130.00 130.00 705 8 mm clear tempered glass sft 255.00 255.00 255.00 255.00 706 8 mm low-E clear glass sft 235.00 235.00 235.00 235.00 707 8 mm low-E clear tempered glass sft 355.00 355.00 355.00 355.00 708 10 mm clear glass sft 142.00 142.00 142.00 142.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 24 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 709 10 mm clear tempered glass sft 280.00 280.00 280.00 280.00 710 12 mm clear glass sft 195.00 195.00 195.00 195.00 711 12 mm clear tempered glass sft 400.00 400.00 400.00 400.00 712 Rubber gasket rft 2.00 2.00 2.00 2.00 713 Aluminium sheet Kg. 405.00 405.00 405.00 405.00 714 Protector bit (Single) foot 20.00 20.00 20.00 20.00 715 Protector bit (Double) foot 28.10 28.10 28.10 28.10 716 Silicon (1 piece 300 mm) each 325.00 325.00 325.00 325.00 717 75 mm rowel bolt each 75.00 75.00 75.00 75.00 718 55 mm rowel bolt each 21.00 21.00 21.00 21.00 719 100 mm longs SS hinge each 100.00 100.00 100.00 100.00 720 Locking arrangement with magnet each 250.00 250.00 250.00 250.00 721 Steel rowel bolt each 42.00 42.00 42.00 42.00 722 Norton Tap each 28.00 28.00 28.00 28.00 723 Masking tape each 25.00 25.00 25.00 25.00 724 Structural sealant each 12.50 12.50 12.50 12.50 725 Casement 4-bar huge each 520.00 520.00 520.00 520.00 726 Casement handle each 252.00 252.00 252.00 252.00 727 Sealant Gum each 405.00 405.00 405.00 405.00 728 Arm lock each 420.00 420.00 420.00 420.00 729 M.S. angle each 115.00 115.00 115.00 115.00 730 Curtain wall jointer each 345.00 345.00 345.00 345.00 731 Dow coling silicon gum pcs 675.00 675.00 675.00 675.00 732 Fin connector each 4,430.00 4,430.00 4,430.00 4,430.00 733 Fin hanger each 5,245.00 5,245.00 5,245.00 5,245.00 734 Thread Rod per rft 30.00 30.00 30.00 30.00 735 MS "U'' bar /channel each 50.00 50.00 50.00 50.00 736 1.5 mm thick 12 mm x 12 mm aluminium U channel foot 45.00 45.00 45.00 45.00 737 1.5 mm thick 38 mm x 18 mm aluminium U channel foot 95.00 95.00 95.00 95.00 738 62 mm x 25 mm alluminium U Channel foot 175.00 175.00 175.00 175.00 739 SS U Channel foot 205.00 205.00 205.00 205.00 740 3 mm SS Channel foot 100.00 100.00 100.00 100.00 741 SS Spider Set each 9,500.00 9,500.00 9,500.00 9,500.00 742 S.S. angle each 100.00 100.00 100.00 100.00 743 8 mm thick PVC board of size 600 x 600 mm per sft 55.00 55.00 55.00 55.00 744 6 mm thick PVC board of size 600 x 600 mm per sft 45.00 45.00 45.00 45.00 745 0.6 mm thick plain aluminium board of size 600x600 mm per sft 111.00 111.00 111.00 111.00 746 0.6 mm thick perforated aluminium board of size 600x600 mm per sft 88.00 88.00 88.00 88.00 747 6 mm thick Fiber cement board per sft 92.00 92.00 92.00 92.00 748 38x12.5x0.5 mm U bar/ Furring channel per foot 23.00 23.00 23.00 23.00 749 19 mm x 19 mm x 0.5 mm G.I. angle per foot 26.00 26.00 26.00 26.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 25 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 750 12 mm thick solid PVC board per sft 114.00 114.00 114.00 114.00 751 Wall paper per sft 62.00 62.00 62.00 62.00 III. Vertical Venetian Blinds 752 Head rail, Aluminium per foot 9.50 9.50 9.50 9.50 753 Rod tilt / Hexagon Aluminium Rod per foot 9.00 9.00 9.00 9.00 754 End cap set / End closure set per set 82.00 82.00 82.00 82.00 755 Weight plate / Weight bar each 11.50 11.50 11.50 11.50 756 Link Chain / Weight Chain per foot 11.50 11.50 11.50 11.50 757 Ball Chain / Plastic Chain per foot 11.00 11.00 11.00 11.00 758 Plastic Washer / Fabric upper clip each 3.00 3.00 3.00 3.00 759 Spacer (Link) / Plastic Runner Spring each 9.75 9.75 9.75 9.75 760 Handling Cord /Nylon Cord per foot 3.25 3.25 3.25 3.25 761 Thread bar each 10.50 10.50 10.50 10.50 762 Angle Clip each 8.50 8.50 8.50 8.50 763 Plastic Runner each 4.00 4.00 4.00 4.00 764 Glass fiber Fabrics (special quality, foreign made) per sft 105.00 105.00 105.00 105.00 765 Angle each 5.00 5.00 5.00 5.00 766 Fitting-fixing charge per sft 4.00 4.00 4.00 4.00 IV. Horizontal Venetian Blind/Horizontal Zebra Blind 767 Head rail per foot 9.50 9.50 9.50 9.50 768 Bottom rail per foot 5.50 5.50 5.50 5.50 769 Aluminium Strips (special quality, foreign made) per foot 85.00 85.00 85.00 85.00 770 synthetic net per foot 62.00 62.00 62.00 62.00 771 50 mm thick polyester/fibreglass insulation per sft 30.00 30.00 30.00 30.00 772 Air tight fabrics in/c heat stitching per sft 75.00 75.00 75.00 75.00 773 polyester fabrics per foot 73.00 73.00 73.00 73.00 774 vinyl or PVC coated strip per foot 93.00 93.00 93.00 93.00 775 Rod till / hexagon aluminium Rod per foot 8.00 8.00 8.00 8.00 776 Gear box /tilter each 11.50 11.50 11.50 11.50 777 Support and cord drum each 6.50 7.50 6.50 6.50 778 Cord lock each 6.50 6.50 6.50 6.50 779 Stop ring each 8.50 8.50 8.50 8.50 780 Tassel ach 5.00 5.00 5.00 5.00 781 Ladder cord per foot 4.25 4.25 4.25 4.25 782 Stick / tilt wand each 8.50 8.50 8.50 8.50 783 Bracket/metal intermediate bracket each 8.50 8.50 8.50 8.50 784 Bottom cap / end cap for head rail each 11.00 11.00 11.00 11.00 785 Tape holder each 6.50 6.50 6.50 6.50 786 Steel washer each 8.50 8.50 8.50 8.50 787 Head cap set each 13.00 13.00 13.00 13.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 26 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 788 Handling cord per foot 5.50 5.50 5.50 5.50 789 Labour cost per sft 4.00 4.00 4.00 4.00 V. Blackout/ Translucent roller Blind 790 Head control tube, 38mm aluminium tube with wall thickness 1mm per foot 22.00 20.00 20.00 20.00 791 one idler aluminium rod per foot 16.00 15.00 15.00 15.00 792 End cap set/end closure set Per set 54.00 50.00 50.00 50.00 793 Weight plate/weight bar each 11.50 11.00 11.00 11.00 794 Link chain/weight chain per foot 12.00 11.00 11.00 11.00 795 Ball chain/plastic chain per foot 11.00 10.00 10.00 10.00 796 Plastic washer/fabricupper clip each 3.00 3.00 3.00 3.00 797 Mounting brackets cover per foot 13.00 13.00 13.00 13.00 798 Handling cord/nylon cord per foot 3.00 3.00 3.00 3.00 799 Thread bar each 10.50 10.50 10.50 10.50 800 Angle clip each 8.50 8.50 8.50 8.50 801 Plastic runner each 4.00 4.00 4.00 4.00 802 PVC/ vinyl laminated fiberglass fabrics per sft 100.00 100.00 100.00 100.00 803 Polypropylene(PP) fiber carpet tiles - size 20" x 20" & thickness 5mm per sft 410.00 410.00 410.00 410.00 804 Angle each 5.00 5.00 5.00 5.00 805 clip in brackets with cover per set 10.00 10.00 10.00 10.00 806 38mm clutch each 22.50 20.00 20.00 20.00 807 piano wire flat springs per foot 16.00 16.00 16.00 16.00 808 elastic spindle each 27.00 27.00 27.00 27.00 809 38mm thick rope chain bead clutch per set 73.00 73.00 73.00 73.00 810 bead chain per foot 22.00 22.00 22.00 22.00 811 25mm thick bottom aluminum tube with 1mm wall thickness per foot 15.50 15.50 15.50 15.50 812 lifting plastic kit each 10.50 10.50 10.50 10.50 813 clutch connectors each 87.00 87.00 87.00 87.00 814 mounting profile for outside mount of roller tube per foot 33.00 33.00 33.00 33.00 815 bottom bar end cap each 17.00 17.00 17.00 17.00 816 pull with tassel each 56.00 56.00 56.00 56.00 817 Fitting-fixing charge per sft 4.00 4.00 4.00 4.00 C15 PVC I. uPVC Pipe for Electric Conduit 818 Wall grade 3/4" / 19 mm dia pipe, 1.2mm thick per foot 5.50 5.50 5.50 5.50 819 Wall grade 1"/ 25 mm dia pipe, 1.2mm thick per foot 8.00 8.00 8.00 8.00 820 Roof grade 3/4"/19 mm dia pipe, 1.5mm thick per foot 6.50 6.50 6.50 6.50 821 Roof grade 1"/ 25 mm dia pipe, 1.5mm thick per foot 9.00 9.00 9.00 9.00 822 Roof grade 1.25"/ 32 mm dia pipe, 1.5mm thick per foot 12.00 12.00 12.00 12.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 27 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur II. Fittings for uPVC Pipe for Electric Conduit 823 3/4"/19 mm Socket per dzn 50.00 50.00 50.00 50.00 824 1" / 25 mm Socket per dzn 70.00 70.00 70.00 70.00 825 1.25"/ 32 mm Socket per dzn 73.00 73.00 73.00 73.00 826 3/4" / 19 mm Plain bend per dzn 88.00 88.00 88.00 88.00 827 1"/ 25 mm Plain bend per dzn 93.00 93.00 93.00 93.00 828 1.25"/ 32 mm Plain bend per dzn 132.00 132.00 132.00 132.00 829 3/4"/ 19 mm Circular box single per dzn 108.00 108.00 108.00 108.00 830 3/4" / 19 mm Circular box double per dzn 109.00 109.00 109.00 109.00 831 1"/ 25 mm Circular box single per dzn 116.00 116.00 116.00 116.00 832 1"/ 25 mm Circular box double per dzn 117.00 117.00 117.00 117.00 833 Solvent cement for jointing per grm 2.00 2.00 2.00 2.00 III. Plastic Door, Windows & Partition 834 uPVC plastic door shutter with uPVC plastic frame with panel wall thickness 1.7 mm-2.2 mm (size: 750mm X 2100mm) per set 4,000.00 4,000.00 4,000.00 4,000.00 835 uPVC plastic door shutter with uPVC plastic frame with panel wall thickness 2.4 mm-2.76 mm (size: 750mm X 2100mm) per set 8,000.00 8,000.00 8,000.00 8,000.00 836 PVC door frame thickness min 2.5 mm per meter 120.00 120.00 120.00 120.00 837 G.I inner joint (76.2 mm x 38.1 mm) clamp each 14.00 14.00 14.00 14.00 838 G.I inner joint (72.2 mm x 76.2 mm) clamp each 13.50 13.50 13.50 13.50 839 G.I outer clamp each 13.80 13.80 13.80 13.80 840 G.I. wall clamp (216 x 19 mm) each 16.50 16.50 16.50 16.50 841 Garjan wood 25.4 x 22.22 mm per meter 30.00 30.00 30.00 30.00 842 uPVC hollow section wall thickness 2.5 mm per meter 950.00 950.00 950.00 950.00 843 uPVC side clip 2.5mm per meter 28.50 28.50 28.50 28.50 844 Screw 25.5 mm each 3.25 3.25 3.25 3.25 845 Tower bolt Ø 9.38 x 152.4mm each 62.50 62.50 62.50 62.50 846 Plastic handle 146 mm long each 58.00 58.00 58.00 58.00 847 Hinges 76.2 x 57.15 mm each 54.00 54.00 54.00 54.00 848 Hasp bolt Ø 25 x ↔ 254 mm each 210.00 210.00 210.00 210.00 849 Round lock normal (China/Korea/Taiwan) each 616.00 616.00 616.00 616.00 850 Rod Ø 9.52 mm x 3 Pcs. each 48.00 48.00 48.00 48.00 851 Nut with washer 6 Pcs. each 13.00 13.00 13.00 13.00 852 Rowel plug each 1.00 1.00 1.00 1.00 853 T-frame per meter 145.00 145.00 145.00 145.00 854 L-frame per meter 145.00 145.00 145.00 145.00 855 Hollow bit per meter 64.00 64.00 64.00 64.00 856 Screw for hollow partition each 2.30 2.30 2.30 2.30 857 T-inner joint clamp each 10.00 10.00 10.00 10.00 858 L-inner joint clamp each 14.50 14.50 14.50 14.50 859 Glass bit per meter 67.00 67.00 67.00 67.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 28 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 860 Round rubber bit per meter 23.00 23.00 23.00 23.00 861 Rubber bit per meter 11.21 11.21 11.21 11.21 862 Adhesive per kg 222.00 222.00 222.00 222.00 863 10mm glass for partition wall per sqm 310.00 310.00 10.00 310.00 IV. Plastic Door, Windows & Partition 864 8 mm thick PVC sheet per pc 1,700.00 1,700.00 1,700.00 1,700.00 865 Partition frame (Profile) per foot 67.00 69.00 69.00 69.00 866 4" New sash (Profile) per foot 157.00 161.00 161.00 161.00 867 Sliding glass bead (Profile) per foot 21.00 23.00 23.00 23.00 868 Partition frame (Reinforcement) per foot 30.00 32.20 32.20 32.20 869 Rubber per foot 7.50 7.50 7.50 7.50 870 Screw per pc 1.00 1.00 1.00 1.00 871 Hinge per pc 49.00 49.00 49.00 49.00 872 Sitkani each 74.00 74.00 74.00 74.00 873 Handle each 54.00 54.00 54.00 54.00 874 Steel clamp (8") each 11.00 11.00 11.00 11.00 875 Partition glass bit per foot 11.00 11.00 11.00 11.00 876 Sliding frame per foot 38.00 38.00 38.00 38.00 877 Sliding sash per foot 43.00 43.00 43.00 43.00 878 Sliding interlock per foot 13.50 13.50 13.50 13.50 879 Brush per foot 10.00 10.00 10.00 10.00 880 Lock (2") each 38.00 38.00 38.00 38.00 881 Sliding frame: reinforcement per foot 31.00 31.00 31.00 31.00 882 Sliding sash: reinforcement per foot 31.00 31.00 31.00 31.00 883 5 mm clear glass per sft 71.00 71.00 71.00 71.00 884 3 mm thick plastic wood per pc 720.00 720.00 720.00 720.00 885 2" Screw per pack 115.00 115.00 115.00 115.00 886 Wall bit (9/64) per pc 42.00 42.00 42.00 42.00 887 Super bit per pc 174.00 174.00 174.00 174.00 888 Sun-star Glue per litre 120.00 120.00 120.00 120.00 889 Tarpin per gallon 280.00 280.00 280.00 280.00 890 Super Glue per pc 30.00 30.00 30.00 30.00 891 6 mm thick plastic wood per pc 1,420.00 1,420.00 1,420.00 1,420.00 892 12 mm thick plastic wood per pc 3,100.00 3,100.00 3,100.00 3,100.00 893 2" Magnet each 45.00 45.00 45.00 45.00 894 Chain Hinge (kabja) each 130.00 130.00 130.00 130.00 895 S.S. Chain Hinge each 250.00 250.00 250.00 250.00 896 Metal Handle each 210.00 210.00 210.00 210.00 897 Cloth per yrds 11.50 11.50 11.50 11.50 898 Rowl plug (10 Nos. per pack) per pack 22.00 22.00 22.00 22.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 29 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur C16 GAS CONNECTION WORK I. 50 PSI API 5L, Grade-B ERW M.S. Pipe 899 100 mm ND (114.30 mm OD) per foot 800.00 800.00 800.00 800.00 900 75 mm ND (88.90 mm OD) per foot 400.00 400.00 400.00 400.00 901 50 mm ND (60.30 mm OD) per foot 215.00 215.00 215.00 215.00 902 25 mm ND (33.40 mm OD) per foot 104.00 104.00 104.00 104.00 903 20 mm ND (26.70 mm OD) per foot 66.00 66.00 66.00 66.00 904 12mm ND (20.0mm OD) per foot 50.00 50.00 50.00 50.00 II. Consumable 905 4" x 400' Black tape per roll 6,370.00 6,370.00 6,370.00 6,370.00 906 2" x 200' Black tape per roll 1,270.00 1,270.00 1,270.00 1,270.00 907 Primer per litre 700.00 700.00 700.00 700.00 III. Butt welded joints 908 75 mm ND (88.90 mm OD) each 210.00 210.00 210.00 210.00 909 50 mm ND (60.30 mm OD) each 180.00 180.00 180.00 180.00 910 25 mm ND (33.40 mm OD) each 140.00 140.00 140.00 140.00 911 20 mm ND (26.70 mm OD) each 120.00 120.00 120.00 120.00 IV. Fittings & accessories 912 50 x 50 x 50 mm N.D. Tee CD40 each 227.00 227.00 227.00 227.00 913 50 x 50 x 25 mm N.D. Tee CD40 each 375.00 375.00 375.00 375.00 914 25 x 25 x 25 mm N.D. Tee CD40 each 25.00 125.00 125.00 125.00 915 50 mm x 90o Elbow each 180.00 180.00 180.00 180.00 916 25 mm x 90o Elbow each 150.00 150.00 150.00 150.00 917 50 mm x 45o Elbow each 77.00 77.00 77.00 77.00 918 50 x 25 mm reducer each 90.00 90.00 90.00 90.00 919 20 mm plug/socket each 385.00 385.00 385.00 385.00 920 50 x 20 mm saddle each 315.00 315.00 315.00 315.00 921 50 mm dia end cap each 67.00 67.00 67.00 67.00 922 25 mm dia end cap each 74.00 74.00 74.00 74.00 923 50 x 50 mm equal tee each 10,025.00 10,025.00 10,025.00 10,025.00 924 25 x 25 x 25 mm service tee each 3,575.00 3,575.00 3,575.00 3,575.00 925 50 x 25 mm service tee each 8,000.00 8,000.00 8,000.00 8,000.00 926 50 mm insulating kits each 980.00 980.00 980.00 980.00 927 50 mm flange W/N 150 R/F each 815.00 815.00 815.00 815.00 928 5/8" x 3" long nut bolt including washer each 75.00 75.00 75.00 75.00 929 Valve Pit (Titas Gas T&D Co. Ltd. design & plan.) (for 2" dia above) each 48,500.00 48,500.00 48,500.00 48,500.00 930 M.S. sheet cover supplied by Titas Gas T & D Co. Ltd.(for 2" dia above) each 20,721.00 20,721.00 20,721.00 20,721.00 931 Testing & purging per meter 22.00 22.00 22.00 22.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 30 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 932 Material cost for cathode protection in gas connection works each 21,000.00 21,000.00 21,000.00 21,000.00 933 1st stage regulator for gas line works each 150,000.00 150,000.00 150,000.00 150,000.00 934 MS seamless Schedule 40- 2" dia pipe line per foot 1,500.00 1,500.00 1,500.00 1,500.00 935 Cylinder heading line each 12,500.00 12,500.00 12,500.00 12,500.00 936 LP gas pigtal, ball valve and other necessary fittings each set 2,500.00 2,500.00 2,500.00 2,500.00 937 Supply and installation of 45KG LPG Cylinder each 6,000.00 6,000.00 6,000.00 6,000.00 938 50 mm ND dia ball valve class 150 R.F. each 7,320.00 7,320.00 7,320.00 7,320.00 939 25 mm ND dia plug valve class 150 R.F. each 5,417.00 5,417.00 5,417.00 5,417.00 940 25 mm dia flange W/N 150 R.F. each 392.00 392.00 392.00 392.00 941 50 mm dia flange W/N 150 R.F. each 814.00 814.00 814.00 814.00 942 50 mm dia gasket each 156.00 156.00 156.00 156.00 943 25 mm dia gasket (asbestos) each 200.00 200.00 200.00 200.00 944 1/2" x 2.5" nut-bolt each 32.00 32.00 32.00 32.00 945 3/4" dia G.I. pipe (NTL or eqv.) per foot 67.00 67.00 67.00 67.00 946 1/2" dia G.I. pipe (NTL or eqv.) per foot 48.00 48.00 48.00 48.00 947 12 x 6 mm gas stop cock each 275.00 275.00 275.00 275.00 948 20 x 20 mm gas stop cock each 500.00 500.00 500.00 500.00 C17 TERMITE TREATMENT 949 DURS BAN 20 EC per litre 1,050.00 1,050.00 1,050.00 1,050.00 950 NEOCIDOL-60 per % ml 165.00 165.00 165.00 165.00 951 Kerosene / Diesel per litre 68.00 68.00 68.00 68.00 C18 CONCRETE HOLLOW BLOCKS & PAVING STONE WORKS 952 70 mm non load bearing concrete hollow block each 26.00 26.00 26.00 26.00 953 Transportation 70 mm block each 4.00 4.00 4.00 4.00 954 Mortar mix per litre 290.00 290.00 290.00 290.00 955 90 mm non load bearing concrete hollow block each 40.00 40.00 40.00 40.00 956 Transportation 90 mm block each 3.50 3.50 3.50 3.50 957 AAC block of 600mmx200mmx240mm each 98.00 98.00 98.00 98.00 958 AAC block of 600mmx200mmx200mm each 90.00 90.00 90.00 90.00 959 AAC block of 600mmx200mmx150mm each 82.00 82.00 82.00 82.00 960 Polymer Modified Adhesive Mortar (40 kgs bag) per bag 700.00 700.00 700.00 700.00 961 Hollow block of 390mmx190mmx240mm each 95.00 95.00 95.00 95.00 962 Hollow block of 390mmx190mmx112mm each 40.00 40.00 40.00 40.00 963 Hollow block of 240mmx114mmx70mm 3H each 12.00 12.00 12.00 12.00 964 140 mm non load bearing concrete hollow block each 58.00 58.00 58.00 58.00 965 Transportation 140/190 mm block each 9.00 9.00 9.00 9.00 966 140 mm load bearing concrete hollow block each 60.00 60.00 60.00 60.00 967 190 mm load bearing concrete hollow block each 65.00 65.00 65.00 65.00 968 150 mm concrete ceiling block each 70.00 70.00 70.00 70.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 31 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 969 Transportation 150/200 mm ceiling block each 10.00 10.00 10.00 10.00 970 200 mm concrete ceiling block each 99.00 99.00 99.00 99.00 971 External plaster mix per litre 295.00 295.00 295.00 295.00 972 60 mm grey Uni- block of 222mmx110mmx60mm each 17.50 17.50 17.50 17.50 973 70 mm grey Uni- block of 222mmx110mmx70mm each 19.50 19.50 19.50 19.50 974 70 mm Coloured Uni- block of 222mmx110mmx70mm each 21.00 21.00 21.00 21.00 975 80 mm grey Uni- block of 222mmx110mmx80mm each 25.00 25.00 25.00 25.00 976 80 mm Coloured Uni- block of 222mmx110mmx80mm each 28.00 28.00 28.00 28.00 977 90 mm grey Uni- block of 222mmx110mmx90mm each 26.00 26.00 26.00 26.00 978 90 mm Coloured Uni- block of 222mmx110mmx90mm each 29.00 29.00 29.00 29.00 979 100 mm grey Uni- block of 222mmx110mmx100mm each 32.00 32.00 32.00 32.00 980 100 mm Coloured Uni- block of 222mmx110mmx100mm each 34.00 34.00 34.00 34.00 981 60 mm grey uniblock: 15 N/mm2 each 15.00 15.00 15.00 15.00 982 60 mm coloured Uni- block of 222mmx110mmx60mm each 20.00 20.00 20.00 20.00 983 Transportation 60/80 mm uniblock/Rec-block each 2.20 2.20 2.20 2.20 984 60 mm grey uniblock: 49 N/mm2 each 20.00 20.00 20.00 20.00 985 60 mm coloured uniblock: 49 N/mm2 each 22.00 22.00 22.00 22.00 986 80 mm grey uniblock: 49 N/mm2 each 24.00 24.00 24.00 24.00 987 80 mm coloured uniblock: 49 N/mm2 each 30.00 30.00 30.00 30.00 988 Solid block of 240mmx114mmx70mm each 13.00 13.00 13.00 13.00 989 Grey rec- block of 200mmx100mmx100mm each 26.00 26.00 26.00 26.00 990 Coloured rec- block of 200mmx100mmx100mm each 28.00 28.00 28.00 28.00 991 Grey rec- block of 200mmx100mmx80mm each 23.00 23.00 23.00 23.00 992 Coloured rec- block of 200mmx100mmx80mm each 25.00 25.00 25.00 25.00 993 Rectangular grey block (200mmx100mmx60mm) each 16.00 16.00 16.00 16.00 994 Rectangular coloured block (200mmx100mmx60mm) each 20.00 20.00 20.00 20.00 995 250 x 250 mm grey engraved CC tiles per sft 50.00 50.00 50.00 50.00 996 250 x 250 mm coloured engraved CC tiles per sft 60.00 60.00 60.00 60.00 997 Transportation of 250 mm x 250 mm tiles per sft 2.10 2.10 2.10 2.10 998 Roof Engraved Tile per sft 40.00 40.00 40.00 40.00 999 Solid block (215 x 100 x 65) mm each 15.00 15.00 15.00 15.00 1000 Transportation Solid block (215 x 100 x 65) mm each 1.70 1.70 1.70 1.70 1001 200 mm x 92 mm x 37.5 mm grey solid cladding block each 14.00 14.00 14.00 14.00 1002 Transportation solid cladding block each 2.50 2.50 2.50 2.50 1003 200 mm x 92 mm x 37.5 mm coloured solid cladding block each 16.00 16.00 16.00 16.00 1004 400 mm x 92 mm x 50 mm grey split cladding each 18.00 18.00 18.00 18.00 1005 Transportation split cladding each 2.20 2.20 2.20 2.20 1006 400 mm x 92 mm x 50 mm coloured split cladding each 23.00 23.00 23.00 23.00 1007 420 mm x 330 mm x 15 mm coloured facial cladding each 38.00 38.00 38.00 38.00 1008 418 mm x 330 mm x 17 mm red colour roof tiles each 160.00 160.00 160.00 160.00 1009 Transportation roof tiles each 3.80 3.80 3.80 3.80

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 32 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1010 J-hook with nut and washer each 11.50 11.50 11.50 11.50 1011 418 mm x 330 mm x 17 mm oriental colour roof tiles each 45.00 45.00 45.00 45.00 1012 418 mm x 330 mm x 17 mm antique red colour roof tiles each 52.00 52.00 52.00 52.00 1013 418 mm x 330 mm x 17 mm green colour roof tiles each 55.00 65.00 65.00 65.00 1014 500x350x100mm Kerb-stone each 165.00 165.00 165.00 165.00 1015 600 mm x 300 mm x 100/50 mm kerb stone each 160.00 160.00 160.00 160.00 1016 Transportation of kerb stone each 33.00 33.00 33.00 33.00 1017 100 mm non-load bearing concrete hollow block each 32.00 32.00 32.00 32.00 1018 Transportation of 100 mm hollow block each 4.00 4.00 4.00 4.00 1019 250 mm concrete ceiling block each 102.00 102.00 102.00 102.00 1020 Transportation 250 mm ceiling block each 9.50 9.50 9.50 9.50 1021 300 mm concrete ceiling block each 120.00 120.00 120.00 120.00 1022 Transportation of 300 mm ceiling block each 15.00 15.00 15.00 15.00 1023 100 mm concrete ceiling block each 40.00 40.00 40.00 40.00 1024 Transportation of 100 mm ceiling block each 6.00 6.00 6.00 6.00 1025 418 mm x 330 mm x 17 mm brown colour roof tiles each 55.00 55.00 55.00 55.00 1026 418 mm x 330 mm x 17 mm Navy blue roof tiles each 55.00 55.00 55.00 55.00 1027 418 mm x 330 mm x 17 mm Mahogany colour roof tiles each 60.00 60.00 60.00 60.00 1028 418 mm x 330 mm x 17 mm Rust Gold colour roof tiles each 60.00 60.00 60.00 60.00 1029 All type concrete ridge: red colour each 160.00 160.00 160.00 160.00 1030 60 mm gray trihex each 22.00 22.00 22.00 22.00 1031 60 mm colour trihex each 31.00 31.00 31.00 31.00 1032 390 mm x190 mm x112 mm sand cement Hollow Block (SCHB) each 30.00 30.00 30.00 30.00 1033 250 mm x 115 mm x 115 mm sand cement solid block each 12.00 12.00 12.00 12.00 1034 300 mm x 115 m x 115 mm size thermal block each 27.00 27.00 27.00 27.00 1035 240 mm x 115 mm x 70 mm size compressed stabilized earth block (CSEB) each 7.50 7.50 7.50 7.50 1036 300 mm x 115 mm x 70 mm size sand cement solid block (SCSB) each 12.00 12.00 12.00 12.00 C19 SANITARY AND WATER SUPPLY WORK I. Misc. items 1037 Water sealed heavy type 18" / 450 mm dia C.I. M.H. cover having locking arrangement each 910.00 910.00 910.00 910.00 1038 Water sealed heavy type 24" / 600 mm dia C.I. M.H. cover having locking arrangement each 1,400.00 1,400.00 1,400.00 1,400.00 1039 Commode Seat cover each 1,250.00 1,250.00 1,250.00 1,250.00 1040 RCC tees each 450.00 450.00 450.00 450.00 1041 CI brackets per pair 150.00 150.00 150.00 150.00 1042 Heavy type CI brackets per pair 180.00 180.00 180.00 180.00 1043 Nuts with washer each 30.00 30.00 30.00 30.00 1044 Clamp each 40.00 40.00 40.00 40.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 33 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1045 50 mm screw & rowel plug each 9.00 9.00 9.00 9.00 1046 75 mm Screw, Rowel plug & Washer each 14.00 14.00 14.00 14.00 1047 Plastic clip each 11.00 11.00 11.00 11.00 1048 Solvent cement per ml 0.85 0.85 0.85 0.85 1049 Hem per sqm 32.00 32.00 32.00 32.00 1050 Scaffolding per foot 3.50 3.50 3.50 3.50 1051 Teflon per pcs 17.00 17.00 17.00 17.00 1052 Nipples with jum-nuts each 60.00 60.00 60.00 60.00 1053 PVC connection pipe each 45.00 45.00 45.00 45.00 1054 32 mm dia PVC waste pipe for W-Basin connection each 360.00 360.00 360.00 360.00 1055 CP chain with rubber plug each 80.00 80.00 80.00 80.00 1056 Grating with brass coupling each 300.00 300.00 300.00 300.00 II. Fixtures & Accessories Combi-closet (Country Made) 1057 Approx. 670~690 X 360~ 362 mm size, minimum 27.5 kg of weight; Equivalent to Stella:Victoria /Stella: Imola / RAK: Karla or similar brand each 6,075.00 6,075.00 6,075.00 6,075.00 1058 Approx. 665~ 704 X 360~ 390 mm size, minimum 31.00 kg of weight : Equivalent to CHARU :CM18/ CHARU: CM15 / Stella :Marcela / RAK :Tampa or similar brand each 7,300.00 7,300.00 7,300.00 7,300.00 1059 Approx. 639~670 X 370 ~399 mm size, minimum 32.5 kg of weight, Equivalent to RAK :Orient delux / RAK orient Standard /Stella: Verso or similar brand each 8,100.00 8,100.00 8,100.00 8,100.00 1060 Approx. 670~670 X 350~390 mm size, minimum 25.2 kg of weight, Equivalent to COTTO: C13960 / RAK Series 600 or similar brand each 9,580.00 9,580.00 9,580.00 9,580.00 1061 Approx. 668~750 x 356 ~430 mm size, minimum 37 .0 kg of weight, Equivalent to Stella:Isabella /RAK: Washington / RAK: Jumairah or similar brand each 11,703.00 11,703.00 11,703.00 11,703.00 1062 Approx. 700~725 X 360~ 380 mm size, minimum 34.1 kg of weight; Equivalent to COTTO - C1470 / RAK: Venic or similar brand each 13,300.00 13,300.00 13,300.00 13,300.00 1063 Approx. 702~ 750x 380~412 mm size, minimum 40.0 kg of weight, Equivalent to COTTO: C118 / RAK: Shino or similar brand each 16,771.00 16,771.00 16,771.00 16,771.00 1064 Approx. 730~ 735x 430~440 mm size, minimum 42.0 kg of weight, Equivalent to COTTO: 109 / COTTO: 129 or similar brand each 19,000.00 19,000.00 19,000.00 19,000.00 1065 Approx. 695~719 X 340~395 mm size, minimum 39.5 kg of weight; Equivalent to RAK :Metropolitan / Stella: Vivana or similar brand each 13,100.00 13,100.00 13,100.00 13,100.00 1066 Approx. 685~729 X 360~406 mm size, minimum 36.0 kg of weight; Equivalent RAK: Oasis/Stella: Evana/ Stella: Marlina or equivalent model each 16,500.00 16,500.00 16,500.00 16,500.00 1067 Approx. 715~735 X 280~480 mm size, minimum 39.5 kg of weight; Equivalent to COTTO - C1053 / COTTO: 1141 / CHARU: CM 950 / RAK: Galaxy or similar brand each 20,000.00 20,000.00 20,000.00 20,000.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 34 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1068 Approx. 760~735 X 430~490 mm size, minimum 40 kg of weight, Equivalent to Stella: Viola / COTTO: C1026 or similar brand each 25,000.00 25,000.00 25,000.00 25,000.00 1069 Approx. 540 X 360 mm size, minimum 16.00 kg of weight each 17,200.00 17,200.00 17,200.00 17,200.00 1070 Approx. 570 X 375 mm size, minimum 22.00 kg of weight each 23,400.00 23,400.00 23,400.00 23,400.00 1071 Approx. 560 X 360 mm size, minimum 26 kg of weight each 31,000.00 31,000.00 31,000.00 31,000.00 1072 approx. 380 mm x 710 mm x 800 mm size, 28.00 kg of weight (flush valve) each 20,700.00 20,700.00 20,700.00 20,700.00 Country made urinal 1073 Approx. 330 X 355 X 445 mm size, minimum 10.0 kg of weight each 1,705.00 1,705.00 1,705.00 1,705.00 1074 Approx. 300 X 370 X 510 mm size, minimum 11.0 kg of weight. each 2,360.00 2,360.00 2,360.00 2,360.00 1075 Approx. 315 X 330 X 600 mm size, minimum 17.0 kg of weight. each 4,700.00 4,700.00 4,700.00 4,700.00 1076 Approx. 300 X 350 X 690 mm size, minimum 18.0 kg of weight each 9,630.00 9,630.00 9,630.00 9,630.00 1077 approx. 510 mm x 380 mm x 85 mm in size, minimum 9.5 kg of weight (flat urinal) each 2,050.00 2,050.00 2,050.00 2,050.00 Long Pan 1078 Approx. 520 X 406.4 X 223.52 mm size, minimum 10.0 kg of weight each 860.00 860.00 860.00 860.00 1079 Approx. 530 X 400 X 230 mm size, minimum 11.0 kg of weight each 1,015.00 1,015.00 1,015.00 1,015.00 1080 Approx. 554 X 439 X 249 mm size, minimum 12.5 kg of weight each 1,390.00 1,390.00 1,390.00 1,390.00 1081 Approx. 540 X 460 X 290 mm size, minimum 13.5 kg of weight each 1,420.00 1,420.00 1,420.00 1,420.00 1082 Approx. 540 X 470 X 290 mm size, minimum 16 kg of weight each 1,520.00 1,520.00 1,520.00 1,520.00 Low-down 1083 Porcelain: approx. 365 X 185 X 325 mm size, minimum 10.00 kg of weight, CHARU CM-10 or equivalent each 2,025.00 2,025.00 2,025.00 2,025.00 1084 Porcelain: approx. 490 X 190 X 345 mm size, minimum 11.00 kg of weight, CHARU CM-15 or equivalent brand each 2,358.00 2,358.00 2,358.00 2,358.00 1085 Porcelain: approx. 490 X 190 X 350 mm size, minimum 14 kg of weight, RAK or equivalent brand each 2,400.00 2,400.00 2,400.00 2,400.00 1086 Plastic low down complete Per set including internal fittings each 900.00 900.00 900.00 900.00 1087 Internal and external fittings for plastic low down each 550.00 550.00 550.00 550.00 Flush valve 1088 Flush valve (local) each 11,475.00 11,475.00 11,475.00 11,475.00 1089 Flush Valve (foreign) each 19,500.00 19,500.00 19,500.00 19,500.00 1090 Flush valve for urinal each 4,200.00 4,200.00 4,200.00 4,200.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 35 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur Wash basin excluding pedestal 1091 Over Counter: Approx. 400X200 mm, minimum weight 6.0 kg each 1,300.00 1,300.00 1,300.00 1,300.00 1092 Over Counter: Approx. 445X345 mm, minimum weight 7.0 kg each 1,530.00 1,530.00 1,530.00 1,530.00 1093 Over Counter:Approx. 535X 435 mm, minimum weight 7.5 kg each 1,970.00 1,970.00 1,970.00 1,970.00 1094 Over Counter: Approx. 560 X475 mm size, minimum weight 10.0 kg each 2,050.00 2,050.00 2,050.00 2,050.00 1095 Under Counter: Approx. 570 X420 mm size, minimum weight 7.5 kg each 1,905.00 1,905.00 1,905.00 1,905.00 1096 Under Counter: Approx. 515 X365 mm size, minimum weight 9.5 kg each 3,225.00 3,225.00 3,225.00 3,225.00 1097 Table Top: Approx. 400X400mm size, minimum weight 6.0kg each 2,920.00 2,920.00 2,920.00 2,920.00 1098 Table Top: Approx. 450X450 mm size, minimum weight 10.0kg each 3,760.00 3,760.00 3,760.00 3,760.00 1099 Table Top: Approx. 480X 370 mm size, minimum weight 10.0kg each 3,940.00 3,940.00 3,940.00 3,940.00 1100 Table Top: Approx. 485X 380 mm size, minimum weight 11.0kg each 4,850.00 4,850.00 4,850.00 4,850.00 1101 Corner Basin: Approx. 540X 400 mm size, minimum weight 7.5 kg each 1,350.00 1,350.00 1,350.00 1,350.00 1102 Corner Basin: Approx. 460X 390 mm size, minimum weight 15.0 kg each 2,110.00 2,110.00 2,110.00 2,110.00 Wash basin including pedestal 1103 Approx. 436 x 343 mm, minimum weight 14.8 kg each 1,784.00 1,784.00 1,784.00 1,784.00 1104 Approx. 457 x 406 mm, minimum weight 15.3 kg each 1,985.00 1,985.00 1,985.00 1,985.00 1105 Approx. 521 x 419 mm, minimum weight 17.7 kg each 2,080.00 2,080.00 2,080.00 2,080.00 1106 Approx. 508 x 394 mm, minimum weight 17.3 kg each 2,100.00 2,100.00 2,100.00 2,100.00 1107 Approx. 540 x 450 mm, minimum weight 20.1 kg each 2,140.00 2,140.00 2,140.00 2,140.00 1108 Approx. 495 x 394 mm, minimum weight 17.3 kg each 2,250.00 2,250.00 2,250.00 2,250.00 1109 Approx. 513 x 432 mm, minimum weight 17.8 kg each 2,350.00 2,350.00 2,350.00 2,350.00 1110 Approx. 564 x 419 mm, minimum weight 18.8 kg each 2,450.00 2,450.00 2,450.00 2,450.00 1111 Approx. 584 x 437 mm, minimum weight 20.0 kg each 2,600.00 2,600.00 2,600.00 2,600.00 1112 Approx. 560 x 450 mm, minimum weight 22.8 kg each 2,655.00 2,655.00 2,655.00 2,655.00 1113 Approx. 572 x 437 mm, minimum weight 20.3 kg each 2,745.00 2,745.00 2,745.00 2,745.00 1114 Approx. 648 x 488 mm, minimum weight 20.0 kg each 2,975.00 2,975.00 2,975.00 2,975.00 1115 Approx. 605 x 485 mm, minimum weight 22.5 kg each 3,040.00 3,040.00 3,040.00 3,040.00 1116 Approx. 630 x 520 mm, minimum weight 28.0 kg each 3,250.00 3,250.00 3,250.00 3,250.00 1117 Approx. 559 x 483 mm, minimum weight 24.5 kg each 3,450.00 3,450.00 3,450.00 3,450.00 1118 Approx. 656 x 510 mm, minimum weight 26.0 kg each 4,410.00 4,410.00 4,410.00 4,410.00 1119 Approx. 500 x 450 mm, minimum weight 25.6 kg each 4,490.00 4,490.00 4,490.00 4,490.00 1120 Approx. 520 x 425 mm, minimum weight 26.2 kg each 4,770.00 4,770.00 4,770.00 4,770.00 1121 Approx. 665 x 490 mm, minimum weight 29.5 kg each 4,875.00 4,875.00 4,875.00 4,875.00 1122 Approx. 660 x 525 mm, minimum weight 31.5 kg each 5,035.00 5,035.00 5,035.00 5,035.00 1123 Approx. 600 x 440 mm, minimum weight 26.0 kg each 5,100.00 5,100.00 5,100.00 5,100.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 36 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1124 Approx. 525 x 415 mm, minimum weight 27.4 kg each 5,540.00 5,540.00 5,540.00 5,540.00 1125 Approx. 650 x 510 mm, minimum weight 25.0 kg each 5,600.00 5,600.00 5,600.00 5,600.00 1126 Approx. 550 x 470 mm, minimum weight 34.0 kg each 7,100.00 7,100.00 7,100.00 7,100.00 Wash basin (including half-pedestal) 1127 Approx. 510X 400 mm size, minimum weight 15.0 kg each 2,060.00 2,060.00 2,060.00 2,060.00 1128 Approx. 550X 440 mm size, minimum weight 17.0 kg each 3,880.00 3,880.00 3,880.00 3,880.00 1129 Approx. 600X 500 mm size, minimum weight 18.5 kg each 4,550.00 4,550.00 4,550.00 4,550.00 1130 Approx. 550 X 460 mm size, minimum weigh 20.0 kg each 4,690.00 4,690.00 4,690.00 4,690.00 Pedestal 1131 approx. size of 670 mm x 186 mm x 170 mm each 1,800.00 1,800.00 1,800.00 1,800.00 Bathroom and kitchen accessories 1132 Porcelain sink: 635 mm x 480 mm x195 mm size, 19.5 kg of weight each 1,920.00 1,920.00 1,920.00 1,920.00 Single bowl stainless steel sink: each 1133 Approx. 508 X 406 mm size single bowl without sink tray each 1,705.50 1,705.50 1,705.50 1,705.50 1134 Approx. 508 X 457 mm size single bowl without sink tray each 1,795.50 1,795.50 1,795.50 1,795.50 1135 Approx. 610 X 457 mm size single bowl without sink tray each 2,115.00 2,115.00 2,115.00 2,115.00 1136 Approx. 762 X 457 mm size single bowl with sink tray each 3,100.00 3,100.00 3,100.00 3,100.00 1137 Approx. 914 X 457 mm size single bowl with sink tray each 3,200.00 3,200.00 3,200.00 3,200.00 1138 Approx. 1016 X 508 mm size single bowl with sink tray each 3,991.50 3,991.50 3,991.50 3,991.50 Double bowl stainless steel sink: 1139 Approx. 1160 x 500 mm size double bowl with sink tray (Standard) each 5,000.00 5,000.00 5,000.00 5,000.00 1140 Approx. 1160 x 500 mm size double bowl with sink tray (Super) each 8,000.00 8,000.00 8,000.00 8,000.00 1141 Approx. 1160 x 500 mm size double bowl with sink tray (Special) each 12,500.00 12,500.00 12,500.00 12,500.00 1142 Local Mirror, 5 mm thickness sqm 1,055.00 1,055.00 1,055.00 1,055.00 1143 Belgium Mirror, 5 mm thickness sqm 1,120.00 1,120.00 1,120.00 1,120.00 1144 600 x 125 x 5 mm size coloured glass shelf with fancy brackets each 1,250.00 1,250.00 1,250.00 1,250.00 1145 600 x 125 x 5 mm size white glass shelf with fancy brackets each 600.00 600.00 600.00 600.00 1146 C.P. towel ring/ 450 mm long single towel rail each 500.00 500.00 500.00 500.00 1147 600 mm long C.P. single towel rail each 500.00 500.00 500.00 500.00 1148 600 mm long C.P. double towel rail each 945.00 945.00 945.00 945.00 1149 600 mm long C.P. towel shelf each 1,256.00 1,256.00 1,256.00 1,256.00 Country made Toilet paper holder/soap tray 1150 PVC toilet paper holder each 180.00 180.00 180.00 180.00 1151 C.P iron bracket toilet paper holder each 245.00 245.00 245.00 245.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 37 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1152 Porcelain toilet paper holder (any color) each 600.00 600.00 600.00 600.00 1153 Stainless steel toilet paper holder each 400.00 400.00 400.00 400.00 1154 PVC soap tray each 60.00 60.00 60.00 60.00 1155 C.P. soap tray each 130.00 130.00 130.00 130.00 1156 Porcelain soap tray (any color) each 280.00 280.00 280.00 280.00 1157 Stainless steel soap tray each 450.00 450.00 450.00 450.00 1158 Automatic liquid soap dispenser (local); standard quality each 928.00 928.00 928.00 928.00 1159 Automatic liquid soap dispenser (local): super quality each 2,723.00 2,723.00 2,723.00 2,723.00 1160 Automatic liquid soap dispenser (foreign): special quality each 5,950.00 5,950.00 5,950.00 5,950.00 1161 Push-Up type liquid soap dispenser (local): standard quality each 695.00 695.00 695.00 695.00 1162 Push-Up type liquid soap dispenser (local): super quality each 1,270.00 1,270.00 1,270.00 1,270.00 1163 Push-Up type liquid soap dispenser (foreign):superior quality each 4,550.00 4,550.00 4,550.00 4,550.00 1164 Push-Up type liquid soap dispenser (foreign): special quality each 6,790.00 6,790.00 6,790.00 6,790.00 Floor grating 1165 Approx. 50~75 mm dia stainless steel floor grating net each 85.00 85.00 85.00 85.00 1166 Approx. 100~125 mm dia stainless steel floor grating net each 200.00 200.00 200.00 200.00 1167 Approx. 50 mm x 50 mm stainless steel floor grating net each 85.00 85.00 85.00 85.00 1168 Approx. 100 mm x 100 mm stainless steel floor grating net each 105.00 105.00 105.00 105.00 1169 Approx. 125 mm x 125 mm stainless steel floor grating net each 740.00 740.00 740.00 740.00 1170 125 mm dia convex cast iron grating on rain water down pipe (roof top) each 400.00 400.00 400.00 400.00 1171 100 mm floor drain with vertical outlet each 1,050.00 1,050.00 1,050.00 1,050.00 FAUCETS 1172 Round headed CP Conceal Bib Cock short body (Essco/ coaster/ star/ diamond/ delux/ deco/ orbed/ delin/ triple/ master/ classic headed or similar head) each 850.00 850.00 850.00 850.00 1173 Lever CP Conceal Bib Cock long body with aerator (Oliver/ spoon/ delta/ decent lever or similar) each 850.00 850.00 850.00 850.00 1174 12 mm CP open Bib Cock each 695.00 695.00 695.00 695.00 1175 12 mm CP Two in One Bib Cock each 1,400.00 1,400.00 1,400.00 1,400.00 1176 Elbow action CP Bib Cock each 2,560.00 2,560.00 2,560.00 2,560.00 1177 CP Push Cock each 720.00 720.00 720.00 720.00 1178 CP Leaf Cock each 560.00 560.00 560.00 560.00 1179 12 mm dia CP Concealed Stop Cock each 835.00 835.00 835.00 835.00 1180 20 mm dia CP Concealed Stop Cock each 875.00 875.00 875.00 875.00 1181 25 mm dia CP Concealed Stop Cock each 1,000.00 1,000.00 1,000.00 1,000.00 1182 CP angle stop cock each 700.00 700.00 700.00 700.00 1183 CP Two in One angle stop cock each 925.00 925.00 925.00 925.00 1184 CP Round headed fixed Pillar cock each 1,150.00 1,150.00 1,150.00 1,150.00 1185 CP Single lever pillar cock each 1,150.00 1,150.00 1,150.00 1,150.00 1186 CP Single lever pillar cock (High top 8") each 2,396.00 2,396.00 2,396.00 2,396.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 38 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1187 CP Single lever pillar cock (High top 12") each 3,196.00 3,196.00 3,196.00 3,196.00 1188 CP Single lever moving pillar cock each 1,436.00 1,436.00 1,436.00 1,436.00 1189 CP Elbow action Pillar cock each 2,560.00 2,560.00 2,560.00 2,560.00 1190 CP One way Swan Cock each 4,720.00 4,720.00 4,720.00 4,720.00 1191 CP Two way Swan Cock each 5,520.00 5,520.00 5,520.00 5,520.00 1192 CP Tree way Swan Cock each 6,560.00 6,560.00 6,560.00 6,560.00 1193 Sensor Type self closing pillar cock each 7,360.00 7,360.00 7,360.00 7,360.00 1194 Push Type Self closing pillar cock each 956.00 956.00 956.00 956.00 1195 12 mm CP concealed fixed sink cock each 875.00 875.00 875.00 875.00 1196 12 mm CP concealed super quality moving sink cock each 1,268.00 1,268.00 1,268.00 1,268.00 1197 12 mm CP concealed special moving sink cock each 1,436.00 1,436.00 1,436.00 1,436.00 1198 Single handle/ lever basin mixer each 2,395.00 2,395.00 2,395.00 2,395.00 1199 Fixed basin mixer each 2,550.00 2,550.00 2,550.00 2,550.00 1200 Moving basin mixer each 2,600.00 2,600.00 2,600.00 2,600.00 1201 Moving sink mixer each 1,436.00 1,436.00 1,436.00 1,436.00 1202 CP shower mixture including shower head only each 4,592.00 4,592.00 4,592.00 4,592.00 1203 CP shower mixture including shower head and faucet each 5,700.00 5,700.00 5,700.00 5,700.00 1204 Bathtub mixer without hand shower each 3,595.00 3,595.00 3,595.00 3,595.00 1205 Bathtub mixer including hand shower each 3,960.00 3,960.00 3,960.00 3,960.00 1206 Single lever angle stop mixer each 1,756.00 1,756.00 1,756.00 1,756.00 1207 Moving type 100 mm CP shower head each 915.00 915.00 915.00 915.00 1208 Moving type 150 mm CP shower head each 1,750.00 1,750.00 1,750.00 1,750.00 1209 Moving type 200 mm CP shower head each 1,960.00 1,960.00 1,960.00 1,960.00 1210 Moving type 250 mm CP shower head each 2,200.00 2,200.00 2,200.00 2,200.00 1211 Moving type hand shower each 10,802.00 10,802.00 10,802.00 10,802.00 1212 Moving type push shower each 750.00 750.00 750.00 750.00 III. Pipes & Accessories (a) HDPE Pipe 1213 110 mm dia HDPE pipe per foot 221.00 221.00 221.00 221.00 1214 110 mm HDPE plain tee/T-Y each 1,650.00 1,650.00 1,650.00 1,650.00 1215 110 mm HDPE plain bend each 1,155.00 1,155.00 1,155.00 1,155.00 1216 160 mm dia HDPE pipe per foot 405.00 405.00 405.00 405.00 1217 160 mm HDPE plain tee/T-Y each 2,520.00 2,520.00 2,520.00 2,520.00 1218 160 mm HDPE plain bend each 1,790.00 1,790.00 1,790.00 1,790.00 1219 200 mm dia HDPE pipe per foot 732.00 732.00 732.00 732.00 1220 200 mm HDPE plain tee/T-Y each 2,960.00 2,960.00 2,960.00 2,960.00 1221 200 mm HDPE plain bend each 3,255.00 3,255.00 3,255.00 3,255.00 1222 250 mm dia HDPE pipe per foot 1,031.00 1,031.00 1,031.00 1,031.00 1223 250 mm HDPE plain tee/T-Y each 7,610.00 7,610.00 7,610.00 7,610.00 1224 250 mm HDPE plain bend each 5,005.00 5,005.00 5,005.00 5,005.00 1225 Electro fusion welding joint(up to 110 mm) each 475.00 475.00 475.00 475.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 39 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1226 Electro fusion welding joint(over 110 mm) each 590.00 590.00 590.00 590.00 1227 110 mm dia HDPE pipe for under-ground per foot 224.00 224.00 224.00 224.00 1228 110 mm HDPE plain Tee/T-Y for under-ground each 835.00 835.00 835.00 835.00 1229 110 mm HDPE plain Bend for under-ground each 651.00 651.00 651.00 651.00 1230 160 mm dia HDPE pipe for under-ground per foot 405.00 405.00 405.00 405.00 1231 160 mm HDPE plain Tee/T-Y for under-ground each 1,195.00 1,195.00 1,195.00 1,195.00 1232 160 mm HDPE plain bend for under-ground each 1,052.00 1,052.00 1,052.00 1,052.00 1233 200 mm dia HDPE pipe for under-ground per foot 732.00 732.00 732.00 732.00 1234 200 mm HDPE plain tee/T-Y for under-ground each 2,960.00 2,960.00 2,960.00 2,960.00 1235 200 mm HDPE plain bend for under-ground each 1,980.00 1,980.00 1,980.00 1,980.00 1236 250 mm dia HDPE pipe for under-ground per foot 1,031.00 1,031.00 1,031.00 1,031.00 1237 250 mm HDPE plain tee/T-Y for under-ground each 5,440.00 5,440.00 5,440.00 5,440.00 1238 250 mm HDPE plain bend for under-ground each 3,660.00 3,660.00 3,660.00 3,660.00 1239 280 mm dia HDPE pipe for under-ground per foot 1,427.00 1,427.00 1,427.00 1,427.00 1240 280 mm HDPE plain tee/T-Y for under-ground each 7,110.00 7,110.00 7,110.00 7,110.00 1241 280 mm HDPE plain bend for under-ground each 5,140.00 5,140.00 5,140.00 5,140.00 1242 315 mm dia HDPE pipe for under-ground per foot 1,792.00 1,792.00 1,792.00 1,792.00 1243 315 mm HDPE plain tee/T-Y for under-ground each 9,512.00 9,512.00 9,512.00 9,512.00 1244 315 mm HDPE plain bend for under-ground each 7,015.00 7,015.00 7,015.00 7,015.00 1245 400 mm dia HDPE pipe for under-ground per foot 2,903.00 2,903.00 2,903.00 2,903.00 1246 400 mm HDPE plain tee/T-Y for under-ground each 18,250.00 18,250.00 18,250.00 18,250.00 1247 400 mm HDPE plain bend for under-ground each 14,010.00 14,010.00 14,010.00 14,010.00 1248 630 mm dia HDPE pipe for under-ground per foot 6,800.00 6,800.00 6,800.00 6,800.00 1249 630 mm HDPE plain tee/T-Y for under-ground each 51,000.00 51,000.00 51,000.00 51,000.00 1250 630 mm HDPE plain bend for under-ground each 40,100.00 40,100.00 40,100.00 40,100.00 1251 710 mm dia HDPE pipe for under-ground per foot 8,950.00 8,950.00 8,950.00 8,950.00 1252 710 mm HDPE plain tee/T-Y for under-ground each 60,100.00 60,100.00 60,100.00 60,100.00 1253 710 mm HDPE plain bend for under-ground each 51,055.00 51,055.00 51,055.00 51,055.00 1254 900 mm dia HDPE pipe for under-ground per foot 13,100.00 13,100.00 13,100.00 13,100.00 1255 900 mm HDPE plain Tee/T-Y for under-ground each 108,000.00 108,000.00 108,000.00 108,000.00 1256 900 mm HDPE plain bend for under-ground each 85,000.00 85,000.00 85,000.00 85,000.00 Butt Welding Joint 1257 Butt fusion welding joint(75-355 mm dia HDPE pipe) each 430.00 430.00 430.00 430.00 1258 Butt fusion welding joint(400-560 mm dia HDPE pipe) each 540.00 540.00 540.00 540.00 1259 Butt fusion welding joint(630-1000 mm dia HDPE pipe) each 710.00 710.00 710.00 710.00 (b) uPVC 1260 12 mm dia uPVC pipe per foot 12.75 12.75 12.75 12.75 1261 12 mm dia uPVC plain Tee each 10.00 10.00 10.00 10.00 1262 12 mm dia uPVC plain elbow each 8.00 8.00 8.00 8.00 1263 12 mm dia uPVC faucet elbow each 10.00 10.00 10.00 10.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 40 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1264 12 mm dia uPVC plain socket each 7.50 7.50 7.50 7.50 1265 12 mm dia uPVC thread plug each 5.20 5.20 5.20 5.20 1266 19 mm dia uPVC pipe per foot 17.00 17.00 17.00 17.00 1267 19 mm dia uPVC plain tee each 13.20 13.20 13.20 13.20 1268 19 mm dia uPVC plain elbow each 12.50 12.50 12.50 12.50 1269 19 mm dia uPVC plain socket each 8.00 8.00 8.00 8.00 1270 19mm x 12 mm dia uPVC reduced tee each 30.00 30.00 30.00 30.00 1271 19mm x 12 mm dia uPVC reduced elbow each 30.00 30.00 30.00 30.00 1272 25 mm dia uPVC pipe per foot 27.20 27.20 27.20 27.20 1273 25 mm x 19 mm dia reduced tee each 35.00 35.00 35.00 35.00 1274 32 mm dia uPVC pipe per foot 34.80 34.80 34.80 34.80 1275 32 mm dia uPVC tee each 34.00 34.00 34.00 34.00 1276 32 mm dia uPVC socket each 45.00 45.00 45.00 45.00 1277 32 mm dia elbow each 28.00 28.00 28.00 28.00 1278 32 mm plain bend 900 each 28.00 28.00 28.00 28.00 1279 37 mm dia uPVC pipe per foot 40.50 40.50 40.50 40.50 1280 37 mm dia uPVC tee each 29.00 29.00 29.00 29.00 1281 37 mm dia uPVC socket each 37.50 37.50 37.50 37.50 1282 37 mm dia uPVC elbow each 26.50 26.50 26.50 26.50 1283 50 mm dia uPVC pipe: 20 foot (6m) long per foot 46.75 46.75 46.75 46.75 1284 50 mm dia uPVC bend/offset each 35.00 35.00 35.00 35.00 1285 50 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) each 125.00 125.00 125.00 125.00 1286 60 mm dia uPVC pipe per foot 72.00 72.00 72.00 72.00 1287 60 mm tee each 170.00 170.00 170.00 170.00 1288 60 mm socket each 85.00 85.00 85.00 85.00 1289 60 mm elbow each 120.00 120.00 120.00 120.00 1290 75 mm dia uPVC pipe per foot 80.00 80.00 80.00 80.00 1291 75 mm dia tee each 210.00 210.00 210.00 210.00 1292 75 mm dia socket each 90.00 90.00 90.00 90.00 1293 75 mm dia elbow each 180.00 180.00 180.00 180.00 1294 88 mm dia uPVC pipe per foot 94.00 94.00 94.00 94.00 1295 88 mm dia tee each 225.00 225.00 225.00 225.00 1296 88 mm dia socket each 135.00 135.00 135.00 135.00 1297 88 mm dia elbow each 192.00 192.00 192.00 192.00 1298 114 mm dia uPVC pipe per foot 125.00 125.00 125.00 125.00 1299 114 mm dia tee each 320.00 320.00 320.00 320.00 1300 114 mm dia socket each 160.00 160.00 160.00 160.00 1301 114 mm dia elbow each 202.00 202.00 202.00 202.00 1302 100 mm dia uPVC Pipe: 20 foot (6m) long per foot 124.00 124.00 124.00 124.00 1303 100 mm dia uPVC bend/offset each 195.00 195.00 195.00 195.00 1304 100 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) each 230.00 230.00 230.00 230.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 41 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1305 110 mm dia uPVC pipe per foot 88.00 88.00 88.00 88.00 1306 110 mm dia door tee (Back) each 220.00 220.00 220.00 220.00 1307 110 mm dia uPVC plain bend 90 each 130.00 130.00 130.00 130.00 1308 110 mm dia uPVC long trap each 290.00 290.00 290.00 290.00 1309 110 mm dia round grating each 403.00 403.00 403.00 403.00 1310 110 mm dia uPVC vent cowl each 40.00 40.00 40.00 40.00 1311 150 mm dia uPVC Pipe: 20 foot (6m) long per foot 263.00 263.00 263.00 263.00 1312 150 mm dia uPVC bend/offset/cowl each 375.00 375.00 375.00 375.00 1313 150 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) each 403.00 403.00 403.00 403.00 1314 150 mm dia uPVC for under-ground per foot 170.00 170.00 170.00 170.00 1315 200 mm dia uPVC pipe for under-ground per foot 402.00 402.00 402.00 402.00 1316 250 mm dia uPVC pipe for under-ground per foot 646.00 646.00 646.00 646.00 1317 280 mm dia uPVC pipe for under-ground per foot 723.00 723.00 723.00 723.00 1318 315 mm dia uPVC pipe for under-ground per foot 944.00 944.00 944.00 944.00 (c) G.I. Pipe & fittings 1319 12 mm dia GI pipe per foot 68.00 68.00 68.00 68.00 1320 12 mm dia elbow each 28.00 28.00 28.00 28.00 1321 12 mm dia tee each 35.00 35.00 35.00 35.00 1322 12 mm dia nipple each 23.00 23.00 23.00 23.00 1323 12 mm dia plug each 12.00 12.00 12.00 12.00 1324 12 mm dia socket each 18.50 18.50 18.50 18.50 1325 20 mm dia GI pipe per foot 89.00 89.00 89.00 89.00 1326 20 mm dia elbow each 45.00 45.00 45.00 45.00 1327 20 mm dia tee each 55.00 55.00 55.00 55.00 1328 20 mm dia nipple each 30.00 30.00 30.00 30.00 1329 20 mm dia plug each 15.00 15.00 15.00 15.00 1330 20 mm dia reducer each 40.00 40.00 40.00 40.00 1331 20 mm dia socket each 32.00 32.00 32.00 32.00 1332 25 mm dia GI pipe per foot 121.00 121.00 121.00 121.00 1333 25 mm dia elbow each 65.00 65.00 65.00 65.00 1334 25 mm dia tee each 70.00 70.00 70.00 70.00 1335 25 mm dia nipple each 45.00 45.00 45.00 45.00 1336 25 mm dia plug each 25.00 25.00 25.00 25.00 1337 25 mm dia reducer each 45.00 45.00 45.00 45.00 1338 25 mm dia socket each 40.00 40.00 40.00 40.00 1339 32 mm dia GI pipe per foot 155.00 155.00 155.00 155.00 1340 32 mm dia elbow each 85.00 85.00 85.00 85.00 1341 32 mm dia tee each 102.00 102.00 102.00 102.00 1342 32 mm dia nipple each 57.00 57.00 57.00 57.00 1343 32 mm dia plug each 30.00 30.00 30.00 30.00 1344 32 mm dia reducer each 65.00 65.00 65.00 65.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 42 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1345 32 mm dia socket each 60.00 60.00 60.00 60.00 1346 40 mm dia GI pipe per foot 198.00 198.00 198.00 198.00 1347 40 mm dia elbow each 105.00 105.00 105.00 105.00 1348 40 mm dia tee each 107.00 107.00 107.00 107.00 1349 40 mm dia nipple each 85.00 85.00 85.00 85.00 1350 40 mm dia plug each 45.00 45.00 45.00 45.00 1351 40 mm dia reducer each 85.00 85.00 85.00 85.00 1352 40 mm dia socket each 75.00 75.00 75.00 75.00 1353 50 mm dia GI pipe per foot 250.00 250.00 250.00 250.00 1354 50 mm dia Elbow each 150.00 150.00 150.00 150.00 1355 50 mm dia tee each 130.00 130.00 130.00 130.00 1356 50 mm dia nipple each 98.00 98.00 98.00 98.00 1357 50 mm dia plug each 60.00 60.00 60.00 60.00 1358 50 mm dia reducer each 108.00 108.00 108.00 108.00 1359 50 mm dia socket each 100.00 100.00 100.00 100.00 1360 62 mm dia GI pipe per foot 396.00 396.00 396.00 396.00 1361 62 mm dia elbow each 250.00 250.00 250.00 250.00 1362 62 mm dia tee each 350.00 350.00 350.00 350.00 1363 62 mm dia nipple each 200.00 200.00 200.00 200.00 1364 62 mm dia plug each 80.00 80.00 80.00 80.00 1365 62 mm dia reducer each 170.00 170.00 170.00 170.00 1366 62 mm dia socket each 220.00 220.00 220.00 220.00 1367 75 mm dia GI pipe per foot 416.00 416.00 416.00 416.00 1368 75 mm dia elbow each 450.00 450.00 450.00 450.00 1369 75 mm dia tee each 400.00 400.00 400.00 400.00 1370 75 mm dia nipple each 220.00 220.00 220.00 220.00 1371 75 mm dia plug each 170.00 170.00 170.00 170.00 1372 75 mm dia reducer each 190.00 190.00 190.00 190.00 1373 75 mm dia socket each 280.00 280.00 280.00 280.00 1374 100 mm dia G.I. pipe per foot 603.00 603.00 603.00 603.00 1375 100 mm dia elbow each 650.00 650.00 650.00 650.00 1376 100 mm dia tee each 820.00 820.00 820.00 820.00 1377 100 mm dia nipple each 420.00 420.00 420.00 420.00 1378 100 mm dia plug each 275.00 275.00 275.00 275.00 1379 100 mm dia reducer each 390.00 390.00 390.00 390.00 1380 100 mm dia socket each 400.00 400.00 400.00 400.00 (d) SS Pipe & fittings 1381 62 mm dia stainless steel (2 mm thick) pipe per foot 285.00 285.00 285.00 285.00 1382 50 mm dia stainless steel (2 mm thick) pipe per foot 225.00 225.00 225.00 225.00 1383 40 mm dia stainless steel (2 mm thick) pipe-(grade A304) per foot 280.00 280.00 280.00 280.00 1384 40 mm dia stainless steel (2 mm thick) pipe-(grade A201) per foot 170.00 170.00 170.00 170.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 43 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1385 37 mm dia stainless steel (1.5 mm thick) pipe-(grade A304) per foot 183.00 183.00 183.00 183.00 1386 37 mm dia stainless steel (1.5 mm thick) pipe-(grade A201) per foot 138.00 138.00 138.00 138.00 1387 32 mm dia stainless steel (1.2 mm thick) pipe per foot 140.00 140.00 140.00 140.00 1388 25 mm dia stainless steel (2 mm thick) pipe-(grade A304) per foot 180.00 180.00 180.00 180.00 1389 25 mm dia stainless steel (2 mm thick) pipe-(grade A201) per foot 109.00 109.00 109.00 109.00 1390 25 mm dia stainless steel (1.2 mm thick) pipe per foot 100.00 100.00 100.00 100.00 1391 20 mm dia stainless steel (2 mm thick) pipe per foot 76.00 76.00 76.00 76.00 1392 20 mm dia stainless steel (1 mm thick) pipe per foot 70.00 70.00 70.00 70.00 1393 12 mm dia stainless steel (2 mm thick) pipe per foot 41.00 41.00 41.00 41.00 1394 6 mm dia stainless steel (1.5 mm thick) pipe per foot 24.00 24.00 24.00 24.00 1395 12 mm x 12 mm SS hollow (1.5 mm thick) bar per foot 48.00 48.00 48.00 48.00 1396 25 mm x 25 mm SS square solid bar per foot 170.00 170.00 170.00 170.00 1397 SS hollow round pipe 1.5mm thickness per kg 300.00 300.00 300.00 300.00 1398 Top cap for 40 mm dia SS pipe each 94.00 94.00 94.00 94.00 1399 Bottom cap for 40 mm dia SS pipe each 73.00 73.00 73.00 73.00 1400 65 mm x 55 mm x 6 mm SS plate each 173.00 173.00 173.00 173.00 1401 75 mm x 75 mm x 2 mm SS box (grade A304) per foot 988.00 988.00 988.00 988.00 1402 75 mm x 75 mm x 2 mm SS box (grade A201) per foot 741.00 741.00 741.00 741.00 1403 62 mm x 25 mm x 2 mm SS Box for hand-rail per foot 260.00 260.00 260.00 260.00 1404 50 mm x 50 mm x 1.5 mm SS box (grade A304) per foot 510.00 510.00 510.00 510.00 1405 50 mm x 50 mm x 1.5 mm SS box (grade A201) per foot 300.00 300.00 300.00 300.00 1406 50 mm x 38 mm, 1.5 mm thick SS box per foot 285.00 285.00 285.00 285.00 1407 50mm x 25mm, 2 mm thick S.S. Box per foot 225.00 225.00 225.00 225.00 1408 50 mm x 12 mm, 1.5 mm thick SS box per foot 175.00 175.00 175.00 175.00 1409 50 mm x 18 mm, 2 mm thick SS Box per foot 215.00 215.00 215.00 215.00 1410 38 mm x 38 mm, 1.5 mm thick SS box (grade A304) per foot 220.00 220.00 220.00 220.00 1411 38 mm x 38 mm, 1.5 mm thick SS box (grade A201) per foot 180.00 180.00 180.00 180.00 1412 38 mm x 12 mm, 1.5 mm thick SS box (grade A304) per foot 167.00 167.00 167.00 167.00 1413 38 mm x 12 mm, 1.5 mm thick SS box (grade A201) per foot 126.00 126.00 126.00 126.00 1414 25 mm x 25 mm, 1.5mm thick SS square box (grade A304) per foot 150.00 150.00 150.00 150.00 1415 25 mm x 25 mm, 1.5mm thick SS square box (grade A201 ) per foot 115.00 115.00 115.00 115.00 1416 50 mm x 25 mm x 2 mm SS box: per foot 72.00 72.00 72.00 72.00 1417 50 mm x 25 mm x 1.5 mm SS box:(grade A304) per foot 388.00 388.00 388.00 388.00 1418 50 mm x 25 mm x 1.5 mm SS box:(grade A201 ) per foot 291.00 291.00 291.00 291.00 1419 19 mm x 19 mm x 3 mm SS angle (grade A304) per foot 98.00 98.00 98.00 98.00 1420 19 mm x 19 mm x 3 mm SS angle (grade A201) per foot 74.00 74.00 74.00 74.00 1421 19 mm x 19 mm x 1.5 mm SS angle (grade A304) per foot 187.00 187.00 187.00 187.00 1422 19 mm x 19 mm x 1.5 mm SS angle (grade A201) per foot 141.00 141.00 141.00 141.00 1423 25 mm x 25 mm x 3 mm SS angle (grade A304) per foot 123.00 123.00 123.00 123.00 1424 25 mm x 25 mm x 3 mm SS angle (grade A201) per foot 93.00 93.00 93.00 93.00 1425 25 mm x 25 mm x 6 mm SS angle per foot 225.00 225.00 225.00 225.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 44 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1426 30 mm x 30 mm x 6 mm SS angle per foot 240.00 240.00 240.00 240.00 1427 38 mm x 38 mm x 3 mm SS angle per foot 205.00 205.00 205.00 205.00 1428 38 mm x 38 mm x 6 mm Angle (grade A304 ) per kg 400.00 400.00 400.00 400.00 1429 38 mm x 38 mm x 6 mm SS angle (grade A201 ) per foot 310.00 310.00 310.00 310.00 1430 50 mm x 50 mm x 3 mm SS angle per foot 253.00 253.00 253.00 253.00 1431 50 mm x 50 mm x 5 mm SS angle per foot 272.00 272.00 272.00 272.00 1432 50 mm x 50 mm x 6 mm SS angle per foot 397.00 397.00 397.00 397.00 1433 SS galvanized barbed wire (dia 2.5 mm) per kg 800.00 800.00 800.00 800.00 1434 SS rod (grade A304 ) per kg 400.00 400.00 400.00 400.00 1435 SS rod (grade A201 ) per kg 300.00 300.00 300.00 300.00 1436 4mm thick SS base plate per kg 250.00 250.00 250.00 250.00 1437 100 mm x 100 mm x 6 mm SS base plate each 200.00 200.00 200.00 200.00 1438 65mm x 55mm, 6 mm thick SS Plate each 173.00 173.00 173.00 173.00 1439 Solid SS royal bolt with cap each 40.00 40.00 40.00 40.00 1440 75mm dia SS Wheel each 1,800.00 1,800.00 1,800.00 1,800.00 1441 19 mm x 3 mm SS flat bar (grade A304) per foot 51.50 51.50 51.50 51.50 1442 19 mm x 3 mm SS flat bar (grade A201) per foot 39.00 39.00 39.00 39.00 1443 25 mm x 3 mm SS flat bar (grade A304) per foot 68.80 68.80 68.80 68.80 1444 25 mm x 3 mm SS flat bar (grade A201) per foot 51.00 51.00 51.00 51.00 1445 38 mm x 3 mm SS flat bar per foot 103.00 103.00 103.00 103.00 1446 50 mm x 3 mm SS flat bar per foot 127.00 127.00 127.00 127.00 1447 50 mm x 5 mm SS flat bar per foot 167.00 167.00 167.00 167.00 1448 50 mm x 6 mm SS flat bar (grade A304) per foot 230.00 230.00 230.00 230.00 1449 50 mm x 6 mm SS flat bar (grade A201) per foot 174.00 174.00 174.00 174.00 1450 SS 12mm dia Royal Bolt cap each 30.00 30.00 30.00 30.00 1451 SS 62mm dia end cap each 70.00 70.00 70.00 70.00 1452 SS 20mm dia end cap each 40.00 40.00 40.00 40.00 1453 25 mm dia SS knob each 100.00 100.00 100.00 100.00 1454 75mm x 75 mm, 3mm thick SS vertical Post each 2,250.00 2,250.00 2,250.00 2,250.00 1455 75mm x 75 mm, 2mm thick SS vertical Post each 2,000.00 2,000.00 2,000.00 2,000.00 1456 50mm dia 2mm thick SS vertical Post each 1,800.00 1,800.00 1,800.00 1,800.00 1457 50mm dia 3mm thick SS vertical Post each 2,000.00 2,000.00 2,000.00 2,000.00 1458 50mm dia x 25mm dia, 2mm thick SS post each 2,200.00 2,200.00 2,200.00 2,200.00 1459 MS Glass Holder each 125.00 125.00 125.00 125.00 1460 SS Glass Holder each 225.00 225.00 225.00 225.00 1461 6" x 6" x 1/4" thick S.S. plate each 250.00 250.00 250.00 250.00 1462 6" x 4" x 1/4" thick S.S. plate each 225.00 225.00 225.00 225.00 1463 4" x 4" x 1/4" thick S.S. plate each 200.00 200.00 200.00 200.00 1464 6"/8" Glass clamp with 4" x 4" S.S. plate each 1,200.00 1,200.00 1,200.00 1,200.00 1465 62mm dia 2mm thick SS post with 4 Nos SS Glass holder & 1 nos railing holder per rft 2,000.00 2,000.00 2,000.00 2,000.00 1466 50mm dia x 25mm, 2mm thick SS newel post per rft 1,400.00 1,400.00 1,400.00 1,400.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 45 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1467 50mm x 6mm SS double plate newel post with SS knob per rft 2,500.00 2,500.00 2,500.00 2,500.00 1468 SS pipe post with glass holder per foot 345.00 345.00 345.00 345.00 1469 SS base cup 38 mm each 230.00 230.00 230.00 230.00 1470 50 x 62 x 2 mm SS pipe post with glass holder each 345.00 345.00 345.00 345.00 1471 SS welding rod per pcs 7.25 7.25 7.25 7.25 1472 Cutting charge of MS angle each 10.00 10.00 10.00 10.00 1473 Cutting charge of SS angle each 7.30 7.30 7.30 7.30 1474 62 mm dia SS bend each 73.00 73.00 73.00 73.00 1475 62 mm dia end socket each 36.00 36.00 36.00 36.00 1476 50 mm dia SS bend each 62.00 62.00 62.00 62.00 1477 50 mm dia end socket each 23.00 23.00 23.00 23.00 1478 40 mm dia end socket each 18.00 18.00 18.00 18.00 1479 20 mm dia end socket each 13.00 13.00 13.00 13.00 1480 25 mm dia socket each 15.00 15.00 15.00 15.00 1481 20 mm dia pipe holder each 125.00 125.00 125.00 125.00 1482 SS hole cutting each 10.00 10.00 10.00 10.00 1483 Royal bolt each 57.00 57.00 57.00 57.00 1484 Glass hole each 31.00 31.00 31.00 31.00 1485 Spider knob each 85.00 85.00 85.00 85.00 (e) CPVC 1486 12 mm dia CPVC pipe per foot 27.00 27.00 27.00 27.00 1487 12 mm dia CPVC plain tee each 36.00 36.00 36.00 36.00 1488 12 mm dia CPVC plain elbow each 28.00 28.00 28.00 28.00 1489 12 mm dia CPVC faucet elbow each 26.00 26.00 26.00 26.00 1490 12 mm dia CPVC plain socket each 20.00 20.00 20.00 20.00 1491 12 mm dia CPVC thread plug each 6.00 6.00 6.00 6.00 1492 19 mm dia CPVC pipe per foot 42.00 42.00 42.00 42.00 1493 19 mm dia CPVC plain tee each 58.00 58.00 58.00 58.00 1494 19 mm dia CPVC plain elbow each 55.00 55.00 55.00 55.00 1495 19 mm dia CPVC plain socket each 18.00 18.00 18.00 18.00 1496 19mm x 12 mm dia CPVC reduced tee each 80.00 80.00 80.00 80.00 1497 19mm x 12 mm dia CPVC reduced elbow each 58.00 58.00 58.00 58.00 1498 25 mm dia CPVC pipe per foot 60.00 60.00 60.00 60.00 1499 25 mm x 19 mm dia reduced Tee each 141.00 141.00 141.00 141.00 1500 32 mm dia CPVC pipe per foot 89.00 89.00 89.00 89.00 1501 32 mm dia CPVC tee each 210.00 210.00 210.00 210.00 1502 32 mm dia CPVC socket each 65.00 65.00 65.00 65.00 1503 32 mm dia elbow each 135.00 135.00 135.00 135.00 1504 37 mm dia CPVC pipe per foot 138.00 138.00 138.00 138.00 1505 37 mm dia CPVC tee each 310.00 310.00 310.00 310.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 46 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1506 37 mm dia CPVC socket each 102.00 102.00 102.00 102.00 1507 37 mm dia CPVC elbow each 260.00 260.00 260.00 260.00 1508 50 mm dia CPVC pipe per foot 210.00 210.00 210.00 210.00 1509 50 mm dia CPVC tee each 650.00 650.00 650.00 650.00 1510 50 mm dia CPVC socket each 365.00 365.00 365.00 365.00 1511 50 mm dia CPVC elbow each 490.00 490.00 490.00 490.00 (f) PP-R Pipe 1512 1/2" PP-R pipe (minimum wall thickness 2.8 mm) per foot 15.00 15.00 15.00 15.00 1513 3/4" PP-R pipe (minimum wall thickness 3.5 mm) per foot 23.75 23.75 23.75 23.75 1514 1" PP-R pipe (minimum wall thickness 4.4 mm) per foot 37.05 37.05 37.05 37.05 1515 1.25" PP-R pipe (minimum wall thickness 5.5 mm) per foot 57.00 57.00 57.00 57.00 1516 1.5" PP-R pipe (minimum wall thickness 6.59 mm) per foot 80.00 80.00 80.00 80.00 1517 2" PP-R pipe (minimum wall thickness 8.6 mm) per foot 126.00 126.00 126.00 126.00 PP-R Fittings 1518 1/2" PP-R elbow each 7.60 8.50 8.50 8.50 1519 1/2" PP-R tee each 9.75 11.90 11.90 11.90 1520 1/2" PP-R end cap each 7.12 7.50 7.50 7.50 1521 1/2" PP-R plug each 6.65 7.65 7.65 7.65 1522 1/2" PP-R reducer each 20.00 22.00 22.00 22.00 1523 1/2" PP-R socket each 7.50 7.65 7.65 7.65 1524 3/4" PP-R elbow each 11.40 11.90 11.90 11.90 1525 3/4" PP-R tee each 15.00 17.00 17.00 17.00 1526 3/4" PP-R end cap each 11.50 7.65 7.65 7.65 1527 3/4" PP-R plug each 8.55 10.20 10.20 10.20 1528 3/4" PP-R reducer each 29.00 18.70 18.70 18.70 1529 3/4" PP-R socket each 8.50 8.50 8.50 8.50 1530 1" PP-R elbow each 18.00 19.55 19.55 19.55 1531 1" PP-R tee each 22.00 24.65 24.65 24.65 1532 1" PP-R end cap each 16.50 10.20 10.20 10.20 1533 1" PP-R plug each 14.50 11.05 11.05 11.05 1534 1" PP-R reducer each 31.00 32.30 32.30 32.30 1535 1" PP-R socket each 19.00 14.45 14.45 14.45 1536 1.25" PP-R elbow each 60.00 52.70 52.70 52.70 1537 1.25" PP-R tee each 62.00 52.70 52.70 52.70 1538 1.25" PP-R end cap each 38.00 39.10 39.10 39.10 1539 1.25" PP-R plug each 37.00 14.45 14.45 14.45 1540 1.25" PP-R reducer each 67.50 54.40 54.40 54.40 1541 1.25" PP-R socket each 24.00 24.65 24.65 24.65 1542 1.5" PP-R elbow each 78.00 56.10 56.10 56.10 1543 1.5" PP-R tee each 90.00 57.80 57.80 57.80

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 47 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1544 1.5" PP-R end cap each 95.00 39.10 39.10 39.10 1545 1.5" PP-R plug each 22.00 17.00 17.00 17.00 1546 1.5" PP-R reducer each 105.00 69.70 69.70 69.70 1547 1.5" PP-R socket each 45.00 29.75 29.75 29.75 1548 2" PP-R elbow each 140.00 133.45 133.45 133.45 1549 2" PP-R tee each 150.00 164.90 164.90 164.90 1550 2" PP-R end cap each 145.00 95.20 95.20 95.20 1551 2" PP-R plug each 22.00 18.70 18.70 18.70 1552 2" PP-R reducer each 132.00 66.30 66.30 66.30 1553 2" PP-R socket each 62.00 65.45 65.45 65.45 PP-R Union (plain) 1554 1/2" PP-R union each 135.00 88.40 88.40 88.40 1555 3/4" PP-R union each 160.00 95.20 95.20 95.20 1556 1" PP-R union each 178.00 139.40 139.40 139.40 1557 1.25" PP-R union each 340.00 238.85 238.85 238.85 1558 1.5" PP-R union each 596.00 351.05 351.05 351.05 1559 2" PP-R union each 732.00 447.95 447.95 447.95 PP-R Gate-Valve 1560 1/2" PP-R Gate-valve each 205.00 268.60 268.60 268.60 1561 3/4" PP-R Gate-valve each 310.00 387.60 387.60 387.60 1562 1" PP-R Gate-valve each 350.00 461.55 461.55 461.55 1563 1.25" PP-R Gate-valve each 650.00 544.00 544.00 544.00 1564 1.5" PP-R Gate-valve each 700.00 629.00 629.00 629.00 1565 2" PP-R Gate-valve each 900.00 986.00 986.00 986.00 (g) RCC Pipes 1566 150 mm dia RCC pipe (stone-chips, 40 mm thickness. 6'-0" long) Each (6'-0") 1,160.00 1,160.00 1,160.00 1,160.00 1567 225 mm dia RCC pipe (stone-chips, 40 mm thickness. 6'-0" long) Each (6'-0") 1,825.00 1,825.00 1,825.00 1,825.00 1568 300 mm dia RCC pipe (stone-chips, 50 mm thickness. 6'-0" long) Each (6'-0") 3,210.00 3,210.00 3,210.00 3,210.00 1569 375 mm dia RCC pipe (stone-chips, 50 mm thickness. 6'-0" long) Each (6'-0") 4,150.00 4,150.00 4,150.00 4,150.00 1570 900 mm dia RCC pipe (stone-chips, 100 mm thickness. 6'-0" long) Each (6'-0") 15,510.00 15,510.00 15,510.00 15,510.00 1571 900mm dia. RCC Socket each 400.00 400.00 400.00 400.00 iv) G.I. Union 1572 12 mm dia union each 45.00 45.00 45.00 45.00 1573 20 mm dia union each 70.00 70.00 70.00 70.00 1574 25 mm dia union each 85.00 85.00 85.00 85.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 48 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1575 32 mm dia union each 115.00 115.00 115.00 115.00 1576 40 mm dia union each 155.00 155.00 155.00 155.00 1577 50 mm dia union each 190.00 190.00 190.00 190.00 1578 62 mm dia union each 420.00 420.00 420.00 420.00 1579 75 mm dia union each 605.00 605.00 605.00 605.00 1580 100 mm dia union each 890.00 890.00 890.00 890.00 v) G.I. Gate-Valve (brass) 1581 12 mm dia gate-valve each 275.00 275.00 275.00 275.00 1582 20 mm dia gate-valve each 400.00 400.00 400.00 400.00 1583 25 mm dia gate-valve each 470.00 470.00 470.00 470.00 1584 32 mm dia gate-valve each 680.00 680.00 680.00 680.00 1585 40 mm dia gate-valve each 750.00 750.00 750.00 750.00 1586 50 mm dia gate-valve each 1,290.00 1,290.00 1,290.00 1,290.00 1587 62 mm dia gate-valve each 2,800.00 2,800.00 2,800.00 2,800.00 1588 75 mm dia gate-valve each 3,850.00 3,850.00 3,850.00 3,850.00 1589 100 mm dia gate-valve each 6,200.00 6,200.00 6,200.00 6,200.00 vi) G.I. Globe-Valve 1590 12 mm dia globe-valve each 315.00 315.00 315.00 315.00 1591 20 mm dia globe-valve each 365.00 365.00 365.00 365.00 1592 25 mm dia globe-valve each 555.00 555.00 555.00 555.00 1593 32 mm dia globe-valve each 780.00 780.00 780.00 780.00 1594 40 mm dia globe-valve each 895.00 895.00 895.00 895.00 1595 50 mm dia globe-valve each 1,500.00 1,500.00 1,500.00 1,500.00 1596 62 mm dia globe-valve each 3,350.00 3,350.00 3,350.00 3,350.00 1597 75 mm dia globe-valve each 4,280.00 4,280.00 4,280.00 4,280.00 1598 100 mm dia globe-valve each 6,900.00 6,900.00 6,900.00 6,900.00 vii) G.I. Check-Valve 1599 12 mm dia check-valve each 280.00 280.00 280.00 280.00 1600 20 mm dia check-valve each 340.00 340.00 340.00 340.00 1601 25 mm dia check-valve each 480.00 480.00 480.00 480.00 1602 32 mm dia check-valve each 650.00 650.00 650.00 650.00 1603 40 mm dia check-valve each 790.00 790.00 790.00 790.00 1604 50 mm dia check-valve each 1,275.00 1,275.00 1,275.00 1,275.00 1605 62 mm dia check-valve each 2,310.00 2,310.00 2,310.00 2,310.00 1606 75 mm dia check-valve each 3,190.00 3,190.00 3,190.00 3,190.00 1607 100 mm dia check-valve each 5,400.00 5,400.00 5,400.00 5,400.00 viii) Float-Valve 1608 12 mm dia float-valve each 250.00 250.00 250.00 250.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 49 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1609 20 mm dia float-valve each 350.00 350.00 350.00 350.00 1610 25 mm dia float-valve each 385.00 385.00 385.00 385.00 1611 32 mm dia float-valve each 680.00 680.00 680.00 680.00 1612 40 mm dia float-valve each 850.00 850.00 850.00 850.00 ix) Drainage Pipe Fittings: 1613 50 mm plastic Y or T-Y cleanout each 180.00 180.00 180.00 180.00 1614 50 mm plastic "P" or "S" trap each 390.00 390.00 390.00 390.00 1615 100 mm "Y" or "T-Y" plastic cleanout each 350.00 350.00 350.00 350.00 1616 100 mm plastic P or S trap each 250.00 250.00 250.00 250.00 Water pressure reducing valve 1617 12 mm dia water pressure reducing valve (MS) each 1,950.00 1,950.00 1,950.00 1,950.00 1618 19 mm dia water pressure reducing valve (MS) each 2,620.00 2,620.00 2,620.00 2,620.00 1619 25 mm dia water pressure reducing valve (MS) each 3,300.00 3,300.00 3,300.00 3,300.00 1620 32 mm dia water pressure reducing valve (MS) each 5,000.00 5,000.00 5,000.00 5,000.00 1621 38 mm dia water pressure reducing valve (MS) each 6,200.00 6,200.00 6,200.00 6,200.00 1622 50 mm dia water pressure reducing valve (MS) each 9,200.00 9,200.00 9,200.00 9,200.00 1623 62 mm dia water pressure reducing valve (MS) each 16,000.00 16,000.00 16,000.00 16,000.00 1624 75 mm dia water pressure reducing valve (MS) each 23,000.00 23,000.00 23,000.00 23,000.00 1625 19 mm dia water pressure reducing valve (Brass double net) each 3,176.00 3,176.00 3,176.00 3,176.00 1626 25 mm dia water pressure reducing valve (Brass double net) each 4,118.00 4,118.00 4,118.00 4,118.00 1627 38 mm dia water pressure reducing valve (Brass double net) each 7,647.00 7,647.00 7,647.00 7,647.00 1628 50 mm dia water pressure reducing valve (Brass double net) each 10,588.00 10,588.00 10,588.00 10,588.00 Food graded plastic overhead water reservoir 1629 1000 liter capacity each 7,300.00 7,300.00 7,300.00 7,300.00 1630 1500 liter capacity each 10,950.00 10,950.00 10,950.00 10,950.00 1631 2000 liter capacity each 14,600.00 14,600.00 14,600.00 14,600.00 1632 3000 liter capacity each 21,900.00 21,900.00 21,900.00 21,900.00 1633 5000 liter capacity each 36,500.00 36,500.00 36,500.00 36,500.00 Food-graded plastic internal mini water tank (loft tank) 1634 150 liter capacity each 2,250.00 2,250.00 2,250.00 2,250.00 1635 300 liter capacity each 3,500.00 3,500.00 3,500.00 3,500.00 1636 500 liter capacity each 3,650.00 3,650.00 3,650.00 3,650.00 Food graded ferro-cement water tank (HBRI) 1637 400 gallon capacity each 7,200.00 7,200.00 7,200.00 7,200.00 1638 450 mm long plastic flexible lead (connection) pipe each 50.00 50.00 50.00 50.00 1639 600 mm long plastic flexible lead (connection) pipe each 60.00 60.00 60.00 60.00 1640 450 mm long metal cover connection pipe each 112.00 112.00 112.00 112.00 1641 600 mm long metal cover connection pipe each 140.00 140.00 140.00 140.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 50 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1642 12 mm or 19 mm dia ball cock for water tank each 180.00 180.00 180.00 180.00 1643 19 mm dia overflow pipe with jam-nut for plastic water tank each 90.00 90.00 90.00 90.00 Water Purifier 1644 Water purification capacity: 10 L/hr, storage 6 litre; RO+MF each 14,500.00 14,500.00 14,500.00 14,500.00 1645 Water purification capacity: 10~12 L/hr, digital display, storage minimum 9 litre, 7 stage purification; Ro+UV+MF each 25,500.00 25,500.00 25,500.00 25,500.00 1646 Water purification capacity: 15 L/hr; storage 8 litre, RO+UF each 17,500.00 17,500.00 17,500.00 17,500.00 1647 Water purification capacity: 20 L/hr, minimum storage 8 litre, 6 stage purification; RO+UV+MF each 23,000.00 23,000.00 23,000.00 23,000.00 1648 Water purification capacity: 60 L/hr, at least 5 stage filtration RO purifier ; each 75,000.00 75,000.00 75,000.00 75,000.00 1649 Water dispenser each 3,500.00 3,500.00 3,500.00 3,500.00 Automatic pressure and flow controller 1650 Maximum flow rate-80 Liter/min each 8,600.00 8,600.00 8,600.00 8,600.00 1651 Maximum flow rate-200 Liter/min each 13,500.00 13,500.00 13,500.00 13,500.00 Hand drier 1652 Automatic Hand drier Local (Standard quality) each 4,500.00 4,500.00 4,500.00 4,500.00 1653 Automatic Hand drier Local (Super quality) each 5,500.00 5,500.00 5,500.00 5,500.00 1654 Automatic Hand drier Local (Superior quality) each 7,000.00 7,000.00 7,000.00 7,000.00 1655 Automatic Hand drier (Special quality) each 11,200.00 11,200.00 11,200.00 11,200.00 C20 ARBORICULTURE WORK 1656 Alluvial loamy silty soil per % cft 1,800.00 1,800.00 1,800.00 1,800.00 1657 Well decomposed cow dung per % cft 2,500.00 2,500.00 2,500.00 2,500.00 1658 Possible cost/royalty of lawn grass per % sft 50.00 50.00 50.00 50.00 1659 16'-0" long muli bamboo (for split) each 140.00 140.00 140.00 140.00 1660 25'-0" long muli bamboo (full size) each 240.00 240.00 240.00 240.00 1661 Borrak bamboo (for post) per foot 13.50 13.50 13.50 13.50 1662 Borrak bamboo (full size) each 405.00 405.00 405.00 405.00 1663 200 mm size earthen tub each 42.00 42.00 42.00 42.00 1664 250 mm size earthen tub each 50.00 50.00 50.00 50.00 1665 300 mm size earthen tub each 70.00 70.00 70.00 70.00 1666 350 mm size earthen tub each 95.00 95.00 95.00 95.00 1667 400 mm size earthen tub each 165.00 165.00 165.00 165.00 1668 300 mm size earthen plate each 30.00 30.00 30.00 30.00 1669 Mustard oil cake per kg 46.00 46.00 46.00 46.00 1670 Bone mele per kg 45.00 45.00 45.00 45.00 1671 Urea fertilizer per kg 25.00 25.00 25.00 25.00 1672 Murate of potash per kg 22.00 22.00 22.00 22.00 1673 Triple super phosphate (TSP) per kg 30.00 30.00 30.00 30.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 51 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1674 Spade (kodal) each 450.00 450.00 450.00 450.00 1675 Spray machine (plaotic), 5ltr capacity each 1,800.00 1,800.00 1,800.00 1,800.00 1676 Steel funna, 450 mm size wirth wooden handle each 370.00 370.00 370.00 370.00 1677 Hand hoe, 250 mm size each 100.00 100.00 100.00 100.00 1678 Standard Steel hand trolly each 6,200.00 6,200.00 6,200.00 6,200.00 1679 Hedge scissors each 1,200.00 1,200.00 1,200.00 1,200.00 1680 10" size Secature each 650.00 650.00 650.00 650.00 1681 22 BWG G.I. water can (2.5 gallon) each 350.00 350.00 350.00 350.00 1682 300 mm size G.I. bucket each 280.00 280.00 280.00 280.00 1683 19 mm dia plastic hose pipe per foot 18.00 18.00 18.00 18.00 1684 400 mm blade Hand Lawn Mower, Model no 1403 – 16 (USA) each 12,500.00 12,500.00 12,500.00 12,500.00 1685 4.5 h.p., 550 mm blade power lawn mower machine each 44,500.00 44,500.00 44,500.00 44,500.00 1686 6.5 h.p., 550 mm blade power lawn mower machine each 58,400.00 58,400.00 58,400.00 58,400.00 1687 22 h.p. 1150 mm cutting blade power riding lawn mower machine each 480,000.00 480,000.00 480,000.00 480,000.00 1688 perfekthion 1-100ml ,bottle each 245.00 245.00 245.00 245.00 1689 Redomil gold, 500gm packet each 825.00 825.00 825.00 825.00 1690 Ripcord 1-100 ml bottle each 220.00 220.00 220.00 220.00 1691 Proclaim,1 box (10gm-10 pack) each 635.00 635.00 635.00 635.00 1692 Vertimec,1-50ml bottle each 120.00 120.00 120.00 120.00 C21 DEEP TUBE-WELL I. For Test boring & design 1693 Mobilization of equipment for drilling 38 mm dia test and observation well LS 6,400.00 6,400.00 6,400.00 6,400.00 1694 Boring by using 100 mm dia cutter (0 m to 50 m) meter 160.00 160.00 160.00 160.00 1695 Best quality heavy type hand type pump no 6 each 2,600.00 2,600.00 2,600.00 2,600.00 1696 2.91 mm wall thick 38 mm dia G.I. pipe meter 650.00 650.00 650.00 650.00 1697 4 mm wall thick 50 mm dia G.I. pipe meter 930.00 930.00 930.00 930.00 1698 5 mm wall thick 75 mm dia G.I. pipe meter 1,710.00 1,710.00 1,710.00 1,710.00 1699 5 mm wall thick 100 mm dia G.I. pipe meter 2,215.00 2,215.00 2,215.00 2,215.00 1700 38 mm dia water grade PVC pipe (D-Class or eqv.) including carriage meter 130.00 130.00 130.00 130.00 1701 38 mm dia water grade PVC Strainer (D-Class or eqv.) including carriage meter 160.00 160.00 160.00 160.00 1702 38 mm dia socket adopter each 80.00 80.00 80.00 80.00 1703 Best quality 38 mm dia PVC Cap. each 60.00 60.00 60.00 60.00 1704 Complete development of the tube-well (test boring) up to 200 m depth. LS 7,200.00 7,200.00 7,200.00 7,200.00 1705 Design of production well upto 200 m LS 9,300.00 9,300.00 9,300.00 9,300.00 1706 Design of production well beyond 200m LS 15,100.00 15,100.00 15,100.00 15,100.00 1707 Disinfections of tube-well using bleaching powder LS 370.00 370.00 370.00 370.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 52 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1708 Maintaining and filling and sealing test bore each bore 3,600.00 3,600.00 3,600.00 3,600.00 II. For Production well 1709 Mobilization of drilling rig for shrouded production wells of depth up to 100 m LS 39,100.00 39,100.00 39,100.00 39,100.00 1710 325 mm dia boring: up to 50 m depth. meter 780.00 780.00 780.00 780.00 1711 350 mm dia boring: up to 50 m depth. meter 850.00 850.00 850.00 850.00 1712 400 mm dia boring: up to 50 m depth. meter 890.00 890.00 890.00 890.00 1713 600 mm dia boring: up to 50 m depth. meter 1,120.00 1,120.00 1,120.00 1,120.00 1714 800 mm dia boring: up to 50 m depth. meter 1,260.00 1,260.00 1,260.00 1,260.00 1715 50 mm dia Class C PVC pipe meter 146.00 146.00 146.00 146.00 1716 50 mm dia Class D PVC pipe meter 178.00 178.00 178.00 178.00 1717 50 mm dia Class E PVC pipe meter 233.00 233.00 233.00 233.00 1718 50 mm dia Class D PVC strainer meter 196.61 196.61 196.61 196.61 1719 50 mm dia Class E PVC strainer meter 251.18 251.18 251.18 251.18 1720 75 mm dia Class C PVC pipe meter 281.00 281.00 281.00 281.00 1721 75 mm dia Class D PVC pipe meter 382.00 382.00 382.00 382.00 1722 75 mm dia Class E PVC pipe meter 493.00 493.00 493.00 493.00 1723 75 mm dia Class D PVC strainer meter 418.07 418.07 418.07 418.07 1724 75 mm dia Class E PVC strainer meter 529.01 529.01 529.01 529.01 1725 100 mm dia Class C PVC pipe meter 421.00 421.00 421.00 421.00 1726 100 mm dia Class D PVC pipe meter 531.00 531.00 531.00 531.00 1727 100 mm dia Class E PVC pipe meter 791.00 791.00 791.00 791.00 1728 100 mm dia Class D PVC strainer meter 692.65 692.65 692.65 692.65 1729 100 mm dia Class E PVC strainer meter 858.62 858.62 858.62 858.62 1730 150 mm dia Class C PVC pipe meter 1,051.00 1,051.00 1,051.00 1,051.00 1731 150 mm dia Class D PVC pipe meter 1,436.00 1,436.00 1,436.00 1,436.00 1732 150 mm dia Class E PVC pipe meter 1,759.00 1,759.00 1,759.00 1,759.00 1733 150 mm dia Class D PVC strainer meter 1,544.67 1,544.67 1,544.67 1,544.67 1734 150 mm dia Class E PVC strainer meter 1,873.50 1,873.50 1,873.50 1,873.50 1735 50 mm dia PVC cap each 100.00 100.00 100.00 100.00 1736 100 mm dia PVC cap each 400.00 400.00 400.00 400.00 1737 150 mm dia PVC cap each 888.00 888.00 888.00 888.00 1738 125 mm x 50 mm PVC reducer each 849.00 849.00 849.00 849.00 1739 150 mm x 75 mm PVC reducer each 1,236.00 1,236.00 1,236.00 1,236.00 1740 200 mm x 100 mm PVC reducer each 1,850.00 1,850.00 1,850.00 1,850.00 1741 200 mm x 150 mm PVC reducer each 2,008.00 2,008.00 2,008.00 2,008.00 1742 250 mm x 150 mm PVC reducer each 3,000.00 3,000.00 3,000.00 3,000.00 1743 125 mm dia PVC housing pipe Class C meter 812.00 812.00 812.00 812.00 1744 125 mm dia PVC housing pipe Class D meter 1,002.00 1,002.00 1,002.00 1,002.00 1745 125 mm dia PVC housing pipe Class E meter 1,192.00 1,192.00 1,192.00 1,192.00 1746 150 mm dia PVC housing pipe Class C meter 1,191.00 1,191.00 1,191.00 1,191.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 53 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1747 150 mm dia PVC housing pipe Class D meter 1,679.00 1,679.00 1,679.00 1,679.00 1748 150 mm dia PVC housing pipe Class E meter 2,055.00 2,055.00 2,055.00 2,055.00 1749 200 mm dia PVC housing pipe Class C meter 1,882.00 1,882.00 1,882.00 1,882.00 1750 200 mm dia PVC housing pipe Class D meter 2,548.00 2,548.00 2,548.00 2,548.00 1751 200 mm dia PVC housing pipe Class E meter 3,074.00 3,074.00 3,074.00 3,074.00 1752 250 mm dia PVC housing pipe Class C meter 2,500.00 2,500.00 2,500.00 2,500.00 1753 250 mm dia PVC housing pipe Class D meter 3,550.00 3,550.00 3,550.00 3,550.00 1754 250 mm dia PVC housing pipe Class E meter 4,740.00 4,740.00 4,740.00 4,740.00 1755 PVC Tape each 105.00 105.00 105.00 105.00 1756 PVC Solution / gum no 660.68 660.68 660.68 660.68 1757 Petrol litre 89.00 89.00 89.00 89.00 1758 Diesel litre 68.00 68.00 68.00 68.00 1759 M.S split centralizer meter 470.00 470.00 470.00 470.00 1760 S.S split centralizer meter 1,510.00 1,510.00 1,510.00 1,510.00 1761 Complete development of the tube-well up to 200 m depth (50 mm x 150 mm tube-well). LS 25,500.00 25,500.00 25,500.00 25,500.00 1762 Complete development of the tube-well up to 200 m depth. (75 mm x 150 mm tube-well) LS 33,800.00 33,800.00 33,800.00 33,800.00 1763 Complete development of the tube-well up to 200 m depth. (100 mm x 200 mm tube-well) LS 41,500.00 41,500.00 41,500.00 41,500.00 1764 Complete development of the tube-well up to 200 m depth. (150 mm x 200 mm tube-well) LS 49,600.00 49,600.00 49,600.00 49,600.00 1765 Complete development of the tube-well up to 200 m depth. (400 mm x 200 mm tube-well) LS 47,100.00 47,100.00 47,100.00 47,100.00 1766 Hire charge of pump including spare and maintenance hour 320.00 320.00 320.00 320.00 1767 Disinfections of tube-well using bleaching powder (for 50 mm x 125 mm tube-well) LS 1,340.00 1,340.00 1,340.00 1,340.00 1768 150 mm dia and 4 mm thick M.S. pipe meter 2,550.00 2,550.00 2,550.00 2,550.00 1769 200 mm dia and 6 mm thick M.S. pipe welded meter 3,600.00 3,600.00 3,600.00 3,600.00 1770 200 mm dia and 6 mm thick M.S. pipe seamless meter 4,010.00 4,010.00 4,010.00 4,010.00 1771 4 mm thick 200 mm dia plate each 1,240.00 1,240.00 1,240.00 1,240.00 1772 5 mm thick 250 mm dia plate each 1,400.00 1,400.00 1,400.00 1,400.00 1773 6 mm thick 150 mm dia M.S. Cap each 1,220.00 1,220.00 1,220.00 1,220.00 1774 6 mm thick 200 mm dia M.S. Cap each 1,560.00 1,560.00 1,560.00 1,560.00 1775 150 mm dia 4.85 mm thick G.I. pipe meter 2,950.00 2,950.00 2,950.00 2,950.00 1776 200 mm dia 6 mm thick G.I. pipe meter 6,200.00 6,200.00 6,200.00 6,200.00 1777 150 mm dia stainless steel strainer of continuous slot meter 14,600.00 14,600.00 14,600.00 14,600.00 1778 150 mm dia 2.5 mm thick stainless steel bridge type strainer meter 11,005.00 11,005.00 11,005.00 11,005.00 1779 200 mm dia 2.5 mm thick stainless steel strainer of continuous slot meter 17,500.00 17,500.00 17,500.00 17,500.00 1780 200 mm dia 2.5 mm thick stainless steel bridge type strainer meter 11,500.00 11,500.00 11,500.00 11,500.00 1781 75 mm dia 2.5 mm thick stainless steel strainer of continuous slot 7,733.70 7,733.70 7,733.70 7,733.70

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 54 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1782 75 mm dia 2.5 mm thick stainless steel bridge type strainer meter 6,500.00 6,500.00 6,500.00 6,500.00 1783 100 mm dia 2.5 mm thick stainless steel strainer of continuous slot 8,737.00 8,737.00 8,737.00 8,737.00 1784 100 mm dia 2.5 mm thick stainless steel bridge type strainer meter 6,580.00 6,580.00 6,580.00 6,580.00 1785 50 mm dia 2.5 mm thick stainless steel strainer of continuous slot 6,863.40 6,863.40 6,863.40 6,863.40 1786 50 mm dia 2.5 mm thick stainless steel bridge type strainer meter 5,660.00 5,660.00 5,660.00 5,660.00 1787 75 mm dia 2.5 mm thick stainless steel bridge type strainer meter 7,680.00 7,680.00 7,680.00 7,680.00 1788 200 mm x 400 mm dia 6 mm thick M.S. reducer each 2,530.00 2,530.00 2,530.00 2,530.00 1789 150 mm x 300 mm dia 6 mm thick M.S. reducer each 2,420.00 2,420.00 2,420.00 2,420.00 1790 200 mm x 300 mm dia 6 mm thick M.S. reducer each 2,420.00 2,420.00 2,420.00 2,420.00 1791 50 mm x 150 mm dia M.S. reducer each 825.00 825.00 825.00 825.00 1792 75 mm x 150 mm dia M.S. reducer each 825.00 825.00 825.00 825.00 1793 100 mm x 200 mm dia M.S. reducer each 1,100.00 1,100.00 1,100.00 1,100.00 1794 (i) 300 mm dia 6 mm thick M.S. housing pipe welded meter 5,994.00 5,994.00 5,994.00 5,994.00 1795 (ii) 300 mm dia 6 mm thick M.S. housing pipe seamless meter 8,250.00 8,250.00 8,250.00 8,250.00 1796 (iii) 400 mm dia 6 mm thick M.S. housing pipe welded meter 9,422.00 9,422.00 9,422.00 9,422.00 1797 (iv) 400 mm dia 6 mm thick M.S. housing pipe seamless meter 11,550.00 11,550.00 11,550.00 11,550.00 1798 150 mm dia 6 mm thick M.S.housing pipe welded meter 4,400.00 4,400.00 4,400.00 4,400.00 1799 150 mm dia 6 mm thick M.S. housing pipe seamless meter 3,850.00 3,850.00 3,850.00 3,850.00 1800 350 mm dia 6 mm thick M.S. cap each 2,200.00 2,200.00 2,200.00 2,200.00 1801 450 mm dia 6 mm thick M.S. cap each 1,950.00 1,950.00 1,950.00 1,950.00 1802 40 mm dia "D" grade pipe foot 40.00 40.00 40.00 40.00 1803 50 mm dia C-Class water- grade pipe foot 90.00 90.00 90.00 90.00 1804 3 m long 40 mm dia PVC strainer each 400.00 400.00 400.00 400.00 1805 EPI / RFL (medium) brand no 6 Pump with necessary fittings etc. each 3,000.00 3,000.00 3,000.00 3,000.00 1806 50 mm x 40 mm socket (reducer) each 80.00 80.00 80.00 80.00 1807 40 mm dia pipe nipple each 123.00 123.00 123.00 123.00 1808 4'-0" long cylinder each 205.00 205.00 205.00 205.00 1809 Tie foot ball Pair 40.00 40.00 40.00 40.00 1810 Tie plunger each 80.00 80.00 80.00 80.00 1811 3/8" dia socket each 20.00 20.00 20.00 20.00 1812 3/8" dia nut each 18.00 18.00 18.00 18.00 1813 Solution big size each 500.00 500.00 500.00 500.00 1814 Tape each 24.00 24.00 24.00 24.00 III. Testing of water including arsenic, collected from the test bore in BUET Laboratory 1815 pH/Hydrogen Ion density per test 500.00 500.00 500.00 500.00 1816 Colour (filtered) per test 500.00 500.00 500.00 500.00 1817 Carbon dioxide (CO2) per test 500.00 500.00 500.00 500.00 1818 Chlorine (Cl) per test 800.00 800.00 800.00 800.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 55 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1819 Fluorine (Fl) per test 700.00 700.00 700.00 700.00 1820 Iron (Fe) per test 2,500.00 2,500.00 2,500.00 2,500.00 1821 Manganese (Mn) per test 1,800.00 1,800.00 1,800.00 1,800.00 1822 Nitrate-Nitrogen (NO3-N) per test 900.00 900.00 900.00 900.00 1823 Total Alkalinity per test 600.00 600.00 600.00 600.00 1824 Total hardness per test 1,100.00 1,100.00 1,100.00 1,100.00 1825 Total dissolved solids (TDS) per test 1,100.00 1,100.00 1,100.00 1,100.00 1826 Arsenic (As) per test 1,800.00 1,800.00 1,800.00 1,800.00 1827 Turbidity per test 500.00 500.00 500.00 500.00 1828 Sieve analysis for sand from different layer per test 3,800.00 3,800.00 3,800.00 3,800.00 C22 SUB-SOIL INVESTIGATION WORK I. Operational cost 1829 Truck fare within 20 km including loading & un-loading per trip 1,850.00 1,850.00 1,850.00 1,850.00 1830 Temporary camp at site for soil investigation work per site 1,250.00 1,250.00 1,250.00 1,250.00 1831 Field Engineer including site allowances: 1-3yrs Exp, Membership with IEB per day 1,900.00 1,900.00 1,900.00 1,900.00 1832 Foundation Engineer: 5-10yrs exp , Membership with IEB per day 3,000.00 3,000.00 3,000.00 3,000.00 1833 Foreman including site allowances per day 910.00 910.00 860.00 860.00 1834 Rig operators including site allowances per day 750.00 750.00 700.00 700.00 1835 Helper to rig operator/c site allowances per day 640.00 620.00 590.00 590.00 1836 Unskilled labour including site allowances per day 590.00 580.00 540.00 540.00 1837 Asstt laboratory technician per day 850.00 850.00 800.00 800.00 1838 Laboratory technician per day 1,400.00 1,400.00 1,400.00 1,400.00 1839 Laboratory engineer per day 1,800.00 1,800.00 1,800.00 1,800.00 1840 Conveyance within 25 km per day 120.00 120.00 120.00 120.00 1841 Wooden plank (mango) per cft 700.00 700.00 700.00 700.00 1842 Rope per kg 55.00 55.00 55.00 55.00 1843 Small boat per day 850.00 850.00 850.00 850.00 1844 Drum (defects free) each 1,200.00 1,200.00 1,200.00 1,200.00 1845 Hire charge of boring rig per day 3,200.00 3,200.00 3,200.00 3,200.00 II Laboratory Charge for Sub-Soil Investigation Work 1846 Sp. gr. test per test 235.00 235.00 235.00 235.00 1847 Hydrometer, sieve analysis & sp. gr.,& Classification according to ASTM per test 1,370.00 1,370.00 1,370.00 1,370.00 1848 Linear shrinkage per test 810.00 810.00 810.00 810.00 1849 Shrinkage limit per test 570.00 570.00 570.00 570.00 1850 Liquid limit per test 350.00 350.00 350.00 350.00 1851 Plastic limit per test 350.00 350.00 350.00 350.00 1852 Unit weight (wet & dry) per test 290.00 290.00 290.00 290.00 1853 Void ratio per test 1,160.00 1,160.00 1,160.00 1,160.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 56 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1854 Moisture content per test 240.00 240.00 240.00 240.00 1855 Organic matter content per test 1,390.00 1,390.00 1,390.00 1,390.00 1856 Consolidated quick test (direct shear test) per test 1,390.00 1,390.00 1,390.00 1,390.00 1857 Unconfined compression per test 1,730.00 1,730.00 1,730.00 1,730.00 1858 Ground water level location per site 580.00 580.00 580.00 580.00 1859 Visual Inspection & Classification of soil for engineering purposes per test 180.00 180.00 180.00 180.00 C23 FITTINGS I. Fittings for Wooden Door-windows/ Hard wares/ Glass/ CI sheet 1860 250 mm long iron tower bolt each 60.00 60.00 60.00 60.00 1861 250 mm long brass tower bolt each 400.00 400.00 400.00 400.00 1862 200 mm long brass tower bolt each 350.00 350.00 350.00 350.00 1863 150 mm long brass tower bolt each 400.00 400.00 400.00 400.00 1864 250 mm long SS tower bolt each 150.00 150.00 150.00 150.00 1865 200 mm socket bolt each 50.00 50.00 50.00 50.00 1866 200 mm long brass socket bolt each 300.00 300.00 300.00 300.00 1867 200 mm long SS socket bolt each 220.00 220.00 220.00 220.00 1868 150 mm long SS socket bolt each 200.00 200.00 200.00 200.00 1869 Hatch bolt each 350.00 350.00 350.00 350.00 1870 100 mm long hinges nickel plated each 70.00 70.00 70.00 70.00 1871 100 mm longs brass hinge each 150.00 150.00 150.00 150.00 1872 75 mm longs brass hinge each 110.00 110.00 110.00 110.00 1873 100 mm longs SS hinge each 100.00 100.00 100.00 100.00 1874 75 mm longs SS hinge each 70.00 70.00 70.00 70.00 1875 Nickel plated handle each 80.00 80.00 80.00 80.00 1876 150 mm Brass handle each 100.00 100.00 100.00 100.00 1877 100 mm Brass handle each 200.00 200.00 200.00 200.00 1878 150 mm SS handle each 70.00 70.00 70.00 70.00 1879 100 mm SS handle each 100.00 100.00 100.00 100.00 1880 1'-6'' Long 25 mm SS Handle each 450.00 450.00 450.00 450.00 1881 3mm thick 2'' x 2'' plate Nos for locking arrangement each 130.00 130.00 130.00 130.00 1882 Iron screws per dzn 18.00 18.00 18.00 18.00 1883 Hinged cleats. each 20.00 20.00 20.00 20.00 1884 SS Hinged cleats. each 50.00 50.00 50.00 50.00 1885 Screws for Hinged cleats. each 10.00 10.00 10.00 10.00 1886 Hinged cleats and buffer block set 62.00 62.00 62.00 62.00 1887 plastic / rubber buffer block each 8.00 8.00 8.00 8.00 1888 Country made door viewer each 160.00 160.00 160.00 160.00 1889 Foreign made door viewer each 250.00 250.00 250.00 250.00 1890 Knob catchment each 40.00 40.00 40.00 40.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 57 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1891 Best quality round lock/ rim lock each 650.00 650.00 650.00 650.00 1892 Best quality security lock each 950.00 950.00 950.00 950.00 1893 62 mm dia iron rings each 18.00 18.00 18.00 18.00 1894 250 mm long & 12 mm dia tower bolt each 60.00 60.00 60.00 60.00 1895 150 mm Socket bolt each 45.00 45.00 45.00 45.00 1896 75 mm long Iron hinges each 12.00 12.00 12.00 12.00 1897 225 mm long catch hook each 17.00 17.00 17.00 17.00 1898 150 mm long brass tower & socket bolt each 250.00 250.00 250.00 250.00 1899 75 mm long brass hinges each 120.00 120.00 120.00 120.00 1900 150 mm long catch hooks each 15.00 15.00 15.00 15.00 1901 Heavy type nickel plated handle each 80.00 80.00 80.00 80.00 1902 SS Screws per doz. 30.00 30.00 30.00 30.00 1903 Brass screw/38 mm screw per doz. 25.00 25.00 25.00 25.00 1904 Magnetic catch each 50.00 50.00 50.00 50.00 1905 Magnetic Door Holder each 180.00 180.00 180.00 180.00 1906 Magnetic Door Holder (Hettich model no- 9228707, Yale model no- YDH 010-AB ) each 550.00 550.00 550.00 550.00 1907 SS screw per dozen 30.00 30.00 30.00 30.00 1908 SS Magnetic Door Holder each 550.00 550.00 550.00 550.00 1909 Door closer (Hettich model no- 9228767, Hafele model no- 499.30.003, Yale model no- Yale 7712) each 3,500.00 3,500.00 3,500.00 3,500.00 1910 Hettich mortice door lock with lever handle model no- 9250321 , thumbturn cylinder and mortise or equivalent each 3,850.00 3,850.00 3,850.00 3,850.00 1911 Mortise lock with Tubular handle withYale handle model no- YTL060, Hafele handle model no- 903.92.556, Dorset model no- ML SL OR ASS 19 or equivalent each 5,000.00 5,000.00 5,000.00 5,000.00 1912 Mortise lock with Satin Stainless Steel Solid lever handle (Yale handle model no- YSL804, Dorset model no- PR 10 (SS) / Hafele model no- 903.92.636 solid lever handle or equivalent) each 6,000.00 6,000.00 6,000.00 6,000.00 1913 Knob lock with Satin Stainless Steel finish knob (Hettich model no- 9228341, Yale model no- VCA5147 US32D 60BS, Hafele model no- 489.10.250 or equivalent) each 1,400.00 1,400.00 1,400.00 1,400.00 1914 Knob lock with Antique Brass finish (Yale model no- VCN5127 US5 60BS, Hettich model no- 9228345 or equivalent) each 1,550.00 1,550.00 1,550.00 1,550.00 1915 5 mm thick clear glass per sft 71.00 71.00 71.00 71.00 1916 5 mm thick reflected glass per sft 102.00 102.00 102.00 102.00 1917 6 mm thick clear glass per sft 90.00 90.00 90.00 90.00 1918 8 mm thick clear glass per sft 130.00 130.00 130.00 130.00 1919 10 mm thick clear glass per sft 142.00 142.00 142.00 142.00 1920 5 mm thick ambush / frosted glass per sft 70.00 70.00 70.00 70.00 1921 5 mm thick tinted glass per sft 90.00 90.00 90.00 90.00 1922 6 mm thick reflected glass per sft 115.00 115.00 115.00 115.00 1923 3 mm thick clear glass per sft 50.00 50.00 50.00 50.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 58 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1924 1.5 mm thick corrugated fiber glass per sft 85.00 85.00 85.00 85.00 1925 1.5 mm thick fiber glass sheet ridging per foot 155.00 155.00 155.00 155.00 Glass Door 1926 10 mm thick tempered glass per sft 390.00 390.00 390.00 390.00 1927 10 mm thick non- tempered glass per sft 165.00 165.00 165.00 165.00 1928 Auto closer set per set 6,200.00 6,200.00 6,200.00 6,200.00 1929 Top and bottom clamping device per set 1,202.00 1,202.00 1,202.00 1,202.00 1930 Locking device per set 2,800.00 2,800.00 2,800.00 2,800.00 1931 Top hinge per set 1,250.00 1,250.00 1,250.00 1,250.00 1932 Handle per set 2,800.00 2,800.00 2,800.00 2,800.00 I. Hardware for steel door-window 1933 Stopper handle each 22.00 22.00 22.00 22.00 1934 300 mm long iron cleats each 34.00 34.00 34.00 34.00 1935 50 mm long pin hinges each 26.00 26.00 26.00 26.00 1936 100 mm long iron hinges each 57.00 57.00 57.00 57.00 1937 Hand lock each 53.00 53.00 53.00 53.00 1938 150 mm long clamp each 37.00 37.00 37.00 37.00 C24 MISCELLENEOUS ITEMS 1939 Nails and wires per kg 70.00 70.00 70.00 70.00 1940 G.I. wire per kg 120.00 120.00 120.00 120.00 1941 Chalk powder per kg 30.00 30.00 30.00 30.00 1942 38 mm x 38 mm x 6 mm brass per foot 320.00 320.00 320.00 320.00 1943 Polythene sheet per % sft 260.00 260.00 260.00 260.00 1944 EPS sheet (62mm thick) density 15 kg per cum per cft 100.00 100.00 100.00 100.00 1945 Ready made commercial wooden shutter: minimum 36 mm thick & 400 kg/cum per sft 514.50 514.50 514.50 514.50 1946 Ready made Myanmar(Burma) teak wooden shutter: minimum 36 mm thick & 400 kg/cum per sft 2,205.00 2,205.00 2,205.00 2,205.00 1947 Ready made mahogany wooden shutter: minimum 36 mm thick & 400 kg/cum per sft 666.75 666.75 666.75 666.75 1948 Ready made beech wood shutter: minimum 36 mm thick & 400 kg/cum per sft 1,323.00 1,323.00 1,323.00 1,323.00 1949 Wood plastic composite (WPC) door shutter & door frame (Door size: 6'9" x 2'6") per set 14,111.00 14,111.00 14,111.00 14,111.00 1950 Wood plastic composite (WPC) door shutter & door frame (Door size: 6'9" x 3'0") per set 17,059.00 17,059.00 17,059.00 17,059.00 1951 Wood plastic composite (WPC) door shutter & door frame (Door size: 6'9" x 3'4") per set 18,485.00 18,485.00 18,485.00 18,485.00 1952 perforated aluminium board per sft 110.00 110.00 110.00 110.00 1953 Lubricants per litre 220.00 220.00 220.00 220.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 59 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1954 Glass Fiber Mesh (10mm X 10mm grid and weight 110 gm/sqm) per sft 7.50 7.50 7.50 7.50 1955 Water proof, damp proof, dry & breathable cement STN-EN - 1015-11 , compressive strength 34 MPa), Max depth of water penetration into hardened plaster is < 1 mm (25 kg bag) (Only for plaster work) per bag 1,800.00 1,800.00 1,800.00 1,800.00 1956 Fire rated door complying standard specification per sft 3,435.00 3,435.00 3,435.00 3,435.00 1957 Installation charge of fire rated door per sft 240.00 240.00 240.00 240.00 1958 Nut-bolts, J-hooks etc. per kg 160.00 160.00 160.00 160.00 1959 Empty gunny bags/ Polymer bag to fill sand for load test each 20.00 20.00 20.00 20.00 1960 Salballah for driving per foot 130.00 130.00 130.00 130.00 1961 Counter-sunk rivets for shoe-plate each 55.00 55.00 55.00 55.00 1962 20 mesh 24 BWG wire mesh per sft 25.00 25.00 25.00 25.00 1963 18 BWG galvanized wire mesh (2 mesh per 25mm) per sft 20.00 20.00 20.00 20.00 1964 225 mm dia RCC pipe per foot 270.00 270.00 270.00 270.00 1965 300 mm dia RCC pipe per foot 460.00 460.00 460.00 460.00 1966 12 BWG barbed wire per M. ton 120,000.00 120,000.00 120,000.00 120,000.00 1967 Rivet, washer, wire nails etc. per kg 90.00 90.00 90.00 90.00 1968 38 mm dia M.S. wheel for collapsible gate each 32.00 32.00 32.00 32.00 1969 75 mm - 150 mm M.S. clamp each 32.00 32.00 32.00 32.00 1970 Electrodes including electricity each 10.00 10.00 10.00 10.00 1971 Grease/lubricant etc. per Ib 65.00 65.00 65.00 65.00 1972 38 mm dia iron ring each 20.00 20.00 20.00 20.00 1973 38 mm dia heavy type gate wheel each 160.00 160.00 160.00 160.00 1974 Clamp with huskel dumney each 145.00 145.00 145.00 145.00 1975 Heavy duty gate locking arrangement each 280.00 280.00 280.00 280.00 1976 MS box holder each 175.00 175.00 175.00 175.00 1977 125 mm M.S. hinges each 70.00 70.00 70.00 70.00 1978 High performance elastomeric cementitious waterproof coating per kg 225.00 225.00 225.00 225.00 1979 Acrylic based fiber reinforced elastomeric liquid per liter 628.00 628.00 628.00 628.00 1980 15.62 mm socket bolt each 62.00 62.00 62.00 62.00 1981 China made spring for rolling shutter per foot 55.00 55.00 55.00 55.00 1982 Spring box for rolling shutter each 80.00 80.00 80.00 80.00 1983 12 mm dia nut-bolt each 12.00 12.00 12.00 12.00 1984 Coal-tar per kg 70.00 70.00 70.00 70.00 1985 150 mm long brass tower & socket bolt each 250.00 250.00 250.00 250.00 1986 75 mm long brass hinges each 120.00 120.00 120.00 120.00 1987 150mmx 38mm ss hinges each 2,500.00 2,500.00 2,500.00 2,500.00 1988 900 mm Long 40 Long 40mm x 40 mm (1.5mm thick) box SS Handle each 150.00 150.00 150.00 150.00 1989 150 mm long catch hooks each 15.00 15.00 15.00 15.00 1990 Screws per doz. 12.00 12.00 12.00 12.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 60 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 1991 24 BWG wire-net per sft 22.00 22.00 22.00 22.00 1992 Color Hardener for stamped concrete per lb 77.50 77.50 77.50 77.50 1993 Release Agent for stamped concrete per lb 680.00 680.00 680.00 680.00 1994 Solvent-Borne Acrylic Sealer for stamped concrete per liter 1,800.00 1,800.00 1,800.00 1,800.00 1995 Gum per kg 200.00 200.00 200.00 200.00 1996 Blue per kg 200.00 200.00 200.00 200.00 1997 Pigment for colour washing per kg 200.00 200.00 200.00 200.00 1998 300 mm long brass hasp bolt each 380.00 380.00 380.00 380.00 1999 14" long 20mm dia solid SS hasp bolt each 500.00 500.00 500.00 500.00 2000 lock each 200.00 200.00 200.00 200.00 2001 Hydraulic door closer each 2,000.00 2,000.00 2,000.00 2,000.00 2002 Mortice door lock each 700.00 700.00 700.00 700.00 2003 Rim (round) door lock each 550.00 550.00 550.00 550.00 2004 SS Pad lock each 500.00 500.00 500.00 500.00 2005 Magnetic door-shock absorber each 100.00 100.00 100.00 100.00 2006 Used and empty Bitumen drum each 250.00 250.00 250.00 250.00 2007 Fire-wood per mound 220.00 220.00 220.00 220.00 2008 Detergent powder per kg 120.00 120.00 120.00 120.00 2009 Bleaching powder per kg 100.00 100.00 100.00 100.00 2010 Fly proof wire-net per sqm 100.00 100.00 100.00 100.00 2011 25 mm expanded metal net per sqm 120.00 120.00 120.00 120.00 2012 Bamboo darma per sqm 43.00 43.00 43.00 43.00 2013 Single layer double bamboo tarja per sqm 140.00 140.00 140.00 140.00 2014 Premix cement plaster per kg 45.00 45.00 45.00 45.00 2015 Skim coat per kg 2,000.00 2,000.00 2,000.00 2,000.00 2016 Cementetious pinhole filler per kg 100.00 100.00 100.00 100.00 2017 Bentonite per kg 36.00 36.00 36.00 36.00 2018 16 gauge thick 50 mm x 50 mm ss hollow box per ft 320.00 320.00 320.00 320.00 2019 16 gauge thick 50 mm x 38 mm ss hollow box per ft 270.00 270.00 270.00 270.00 2020 18 gauge thick 50 mm x 12 mm ss hollow box per ft 190.00 190.00 190.00 190.00 2021 2 ply petroleum asphalt (Chinese) per sft 10.00 10.00 10.00 10.00 2022 Coal per kg 7.00 7.00 7.00 7.00 2023 2.44 m x 1.22 m size hard board per piece 600.00 600.00 600.00 600.00 2024 PVC water stopper (with non-centre bulb) per foot 160.00 160.00 160.00 160.00 2025 PVC water stopper (with centre bulb) per foot 180.00 180.00 180.00 180.00 2026 Sign board including material, painting, lettering etc all complete sft 250.00 250.00 250.00 250.00 2027 Autocad operator per day 1,200.00 1,200.00 1,200.00 1,200.00 2028 printing of drawing sft 20.00 20.00 20.00 20.00 2029 A2 size printing each 150.00 150.00 150.00 150.00 2030 As built work survey & report per day 1,800.00 1,800.00 1,800.00 1,800.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 61 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 2031 Providing expertised Architect 5years exp with registration in respective professional body per month 80,000.00 80,000.00 80,000.00 80,000.00 2032 Providing junior/ project Architect with registration in respective professional body per month 50,000.00 50,000.00 50,000.00 50,000.00 2033 Providing expertised engineer 10 years exp with registration in respective professional body per month 120,000.00 120,000.00 120,000.00 120,000.00 2034 Providing junior/ project engineer with registration in respective professional body per month 50,000.00 50,000.00 50,000.00 50,000.00 2035 Providing pick up (double Cabined) per month 70,000.00 70,000.00 70,000.00 70,000.00 2036 photographer per day 1,200.00 1,200.00 1,200.00 1,200.00 2037 Drone rent per day 15,000.00 15,000.00 15,000.00 15,000.00 2038 photo print , post card size each 8.50 8.50 8.50 8.50 2039 Engineer, Expertise in microsoft MS Project /Primavera and experience by min 5yrs per month 150,000.00 150,000.00 150,000.00 150,000.00 2040 Engineer, min graduate in relevant field per day 1,900.00 1,900.00 1,900.00 1,900.00 2041 Diploma Engineer, min 5yrs Exp per day 1,400.00 1,400.00 1,400.00 1,400.00 2042 Diploma Engineer, min 1yrs Exp per day 1,100.00 1,100.00 1,100.00 1,100.00 2043 Trained operator for tower crane per month 17,610.00 17,610.00 17,610.00 17,610.00 2044 Helper for tower crane per month 10,000.00 10,000.00 10,000.00 10,000.00 2045 Maintenance & Electricity bill for tower crane per month 4,000.00 4,000.00 4,000.00 4,000.00 2046 Generator/ Power consumption per kwh per kwh 11.00 11.00 11.00 11.00 2047 Royalty of Earth per thousand cft 2,200.00 2,200.00 2,200.00 2,200.00 2048 Royalty of Dredge material in the water body per thousand cft 1,400.00 1,400.00 1,400.00 1,400.00 2049 Calibration of pressure gauge per set 5,400.00 5,400.00 5,400.00 5,400.00 2050 Calibration of hydraulic jack & pressure gauge combined per set 33,100.00 33,100.00 33,100.00 33,100.00 2051 Arc welding at workshop / factory per foot 27.00 27.00 25.70 25.70 2052 Cutting by oxy-ace of 12 mm M.S plate, top & bott plate per foot 37.00 37.00 36.00 36.00 2053 12 mm MS Plate Grinding to V bevel top & bott per foot 52.50 52.50 51.00 51.00 2054 25 mm dia Hole in 12 mm M.S plate per nos 52.50 52.50 51.00 51.00 2055 Cutting by shearing granding and hole for steel jacket, 6 mm plate on 2U x ( top & bott) - C or U form per foot 15.00 15.00 15.00 15.00 2056 6 mm MS Plate Grinding to V bevel on faces of U legs for top & bott per foot 80.00 80.00 80.00 80.00 2057 Charge to bend 6 mm MS Plates per foot 34.00 34.00 37.50 37.50 2058 50 mm dia Hole in 6 mm M.S plate p/nos 125.00 125.00 125.00 125.00 2059 38 mm G.I/ MS pipe for dowel bar per foot 215.00 215.00 225.00 215.00 2060 Fabrication: bending of 20 mm bar in U per M.Ton 6,700.00 6,700.00 6,700.00 6,700.00 2061 Data logging engineer at hydraulic pile driver per day 1,900.00 1,900.00 1,900.00 1,900.00 2062 Chief Mechanic, at hydraulic pile driver per day 1,400.00 1,400.00 1,400.00 1,400.00 2063 Helper to mechanic, at hydraulic pile driver per day 600.00 600.00 600.00 600.00 2064 Foreman, at hydraulic pile driver per day 850.00 850.00 850.00 850.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 62 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 2065 Crane Operator, at hydraulic pile driver per day 850.00 850.00 850.00 850.00 2066 Asst. Crane Operator, at hydraulic pile driver per day 650.00 650.00 650.00 650.00 2067 Machine Operator, at hydraulic pile driver per day 650.00 650.00 650.00 650.00 2068 Asst machine operator, at hydraulic pile driver per day 650.00 650.00 650.00 650.00 2069 Helper to crane operator, at hydraulic pile driver per day 600.00 600.00 600.00 600.00 2070 Helper to machine operator, at hydraulic pile driver per day 600.00 600.00 600.00 600.00 2071 Generator Operator, at hydraulic pile driver per day 650.00 650.00 650.00 650.00 2072 Surveyor to pile layout , at hydraulic pile driver per day 1,200.00 1,200.00 1,200.00 1,200.00 2073 Helper to surveyor, at hydraulic pile driver per day 850.00 850.00 850.00 850.00 2074 Skilled Labor, at hydraulic pile driver per day 600.00 600.00 600.00 600.00 2075 ordinary labor, at hydraulic pile driver per day 550.00 550.00 550.00 550.00 2076 Compilation of driving report, pile capacity log & submission to PE on signing it on hydraulic pile driver per day 12,000.00 12,000.00 12,000.00 12,000.00 2077 PIT : mobilization, demobilization, accommodation +12pile PIT per 100km within Dhaka 28,000.00 28,000.00 28,000.00 28,000.00 2078 Pile Integrity Test (PIT) per pile after 1st 12 pile 1,200.00 1,200.00 1,200.00 1,200.00 2079 PIT expert engineer graduated in civil engr. and in geotech. engineer by profession, 10 yrs experience per month 250,000.00 250,000.00 250,000.00 250,000.00 2080 Asst to PIT expert engineer: civil engr / geotech engineer by profession, 5yrs experience per month 150,000.00 150,000.00 150,000.00 150,000.00 2081 Mobilization and demobilization of equipment, hammer, guide frame and a 40 Ton capacity crane for PDA test per trip 29,000.00 29,000.00 29,000.00 29,000.00 2082 One 40 Ton Capacity Crane including operator, assistant and fuel for PDA test per day 40,000.00 40,000.00 40,000.00 40,000.00 2083 Supply of data aquising unit complete with sensors, guide frame, hammer and accessories and acquiring data from pile for PDA test per set 25,000.00 25,000.00 25,000.00 25,000.00 2084 Report preparation for PDA test per set 6,000.00 6,000.00 6,000.00 6,000.00 GLASS: Float / Anealed 2085 Float / annealed glass thickness :2.5mm sft 38.00 38.00 38.00 38.00 2086 Float / annealed glass thickness :3.0mm sft 38.00 38.00 38.00 38.00 2087 Float / annealed glass thickness :3.5mm sft 45.00 45.00 45.00 45.00 2088 Float / annealed glass thickness :4.0mm sft 52.00 52.00 52.00 52.00 2089 Float / annealed glass thickness :5.0mm sft 76.00 76.00 76.00 76.00 2090 Float / annealed glass thickness :6.0mm sft 90.00 90.00 90.00 90.00 2091 Float / annealed glass thickness :8.0mm sft 135.00 135.00 135.00 135.00 2092 Float / annealed glass thickness :10.0mm sft 142.00 142.00 142.00 142.00 2093 Float / annealed glass thickness :12.0mm sft 195.00 195.00 195.00 195.00 GLASS: Tempered Glass 2094 Tempered glass thickness 5.0mm sft 162.00 162.00 162.00 162.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 63 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 2095 Tempered glass thickness 6.0mm sft 190.00 190.00 190.00 190.00 2096 Tempered glass thickness 8.0mm sft 255.00 255.00 255.00 255.00 2097 Tempered glass thickness 10.0mm sft 280.00 280.00 280.00 280.00 2098 Tempered glass thickness 12.0mm sft 400.00 400.00 400.00 400.00 2099 Tempered glass thickness 15.0mm sft 1,010.00 1,010.00 1,010.00 1,010.00 2100 Tempered glass thickness 19.0mm sft 1,520.00 1,520.00 1,520.00 1,520.00 2101 12 mm two in one bib cock each 1,200.00 1,200.00 1,200.00 1,200.00 2102 Fibre mesh per kg 1,250.00 1,250.00 1,250.00 1,250.00 2103 3 mm thick frosted glass sft 55.00 55.00 55.00 55.00 2104 Synthetic fly proof net. sqm 160.00 160.00 160.00 160.00 2105 100 mm x 38 mm x 6 mm size clamp each 16.00 16.00 16.00 16.00 2106 Stone lime kg 20.00 20.00 20.00 20.00 2107 Surki cum 1,600.00 1,600.00 1,600.00 1,600.00 2108 25 mm mesh expanded metal for using under patent stone sft 17.00 17.00 17.00 17.00 2109 25 mm iron screw dz 9.00 9.00 9.00 9.00 2110 50 mm iron screw dz 16.00 16.00 16.00 16.00 2111 25 mm brass screw dz 16.00 16.00 16.00 16.00 2112 38 mm iron hinge each 5.00 5.00 5.00 5.00 2113 38 mm brass hinge each 7.00 7.00 7.00 7.00 2114 75 mm long catch hook each 5.00 5.00 5.00 5.00 2115 100 mm long catch hook each 7.00 7.00 7.00 7.00 2116 150 mm long catch hook each 9.00 9.00 9.00 9.00 2117 200 mm long catch hook each 11.00 11.00 11.00 11.00 2118 225 mm long catch hook each 17.00 17.00 17.00 17.00 2119 50 mm dia 100 mm long socket bolt each 9.00 9.00 9.00 9.00 2120 50 mm dia 100 mm long socket bolt (SS) each 38.00 38.00 38.00 38.00 2121 50 mm dia 150 mm long socket bolt each 12.50 12.50 12.50 12.50 2122 50 mm dia 150 mm long socket bolt (SS) each 60.00 60.00 60.00 60.00 2123 50 mm dia 200 mm long socket bolt each 22.00 22.00 22.00 22.00 2124 50mm dia 200 mm long socket bolt (SS) each 76.00 76.00 76.00 76.00 2125 50 mm dia 150 mm long brass socket bolt each 120.00 120.00 120.00 120.00 2126 50 mm dia 200 mm long brass socket bolt each 155.00 155.00 155.00 155.00 2127 50 mm dia 250 mm long brass socket bolt each 190.00 190.00 190.00 190.00 2128 75 mm long hinge each 27.00 27.00 27.00 27.00 2129 100 mm long hinge each 50.00 50.00 50.00 50.00 2130 75 mm long brass hinge each 115.00 115.00 115.00 115.00 2131 100 mm long brass hinge each 155.00 155.00 155.00 155.00 2132 50 mm dia iron ring each 15.00 15.00 15.00 15.00 2133 50 mm dia brass ring each 42.00 42.00 42.00 42.00 2134 Digital print name plate sft 250.00 250.00 250.00 250.00 2135 Acrylic transparent sheet for name plate each 1,000.00 1,000.00 1,000.00 1,000.00 2136 Colouring materials kg 190.00 190.00 190.00 190.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 64 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 2137 Lacquer spray polishing litre 580.00 580.00 580.00 580.00 2138 Materials for french polishing: 3 coats on new surface % sft 820.00 820.00 820.00 820.00 2139 Earthoil kg 55.00 55.00 55.00 55.00 2140 40 mm dia G.I. Socket each 110.00 110.00 110.00 110.00 2141 3 gal capacity C. I. Cistern (Not available in market) each 1,300.00 1,300.00 1,300.00 1,300.00 2142 300 long clamp: Iron each 25.00 25.00 25.00 25.00 2143 150 long clamp: Iron each 13.00 13.00 13.00 13.00 2144 Aluminium paint gallon (U.K.) 1,475.00 1,475.00 1,475.00 1,475.00 2145 36 " dia RCC ring for latrine and soak well each 300.00 300.00 300.00 300.00 2146 36" dia RCC Slab for soak well cover each 300.00 300.00 300.00 300.00 2147 36" dia RCC Slab with ceramic long pan and sanitary seal each 950.00 950.00 950.00 950.00 2148 3" dia RCC post 12'-0" long each 950.00 950.00 950.00 950.00 2149 0.45 mm couragated sheet walling & roofing per sft 30.00 30.00 30.00 30.00 2150 Waste bin made of plastic material each 1,250.00 1,250.00 1,250.00 1,250.00 2151 Plastic low-down cistern each 950.00 950.00 950.00 950.00 2152 Siphon set for plastic low-down set 438.00 438.00 438.00 438.00 2153 Jarul per cft 1,800.00 1,800.00 1,800.00 1,800.00 2154 Loha/ Pyiankado per cft 2,700.00 2,700.00 2,700.00 2,700.00 2155 25mm dia G.I. Pipe for structural work foot 80.00 80.00 80.00 80.00 2156 China made spring for rolling shutter foot 18.00 18.00 18.00 18.00 2157 Spring box for rolling shutter each 130.00 130.00 130.00 130.00 2158 Scaffolding including safety provision per sft 12.00 12.00 12.00 12.00 2159 Hygienic Gown each 120.00 120.00 120.00 120.00 2160 Thermometer each 80.00 80.00 80.00 80.00 2161 Infra- red Thermometer each 1,650.00 1,650.00 1,650.00 1,650.00 2162 Adhesive dressings pack each 150.00 150.00 150.00 150.00 2163 Antiseptic Solution 100ml bottle each 125.00 125.00 125.00 125.00 2164 Bandages pack each 250.00 250.00 250.00 250.00 2165 Cotton balls or Swabs each 50.00 50.00 50.00 50.00 2166 Emergency blanket each 600.00 600.00 600.00 600.00 2167 Gloves (powdered) each 550.00 550.00 550.00 550.00 2168 Hand Sanitizer 250 ml each 250.00 250.00 250.00 250.00 2169 Hand Sanitizer 100 ml each 150.00 150.00 150.00 150.00 2170 Ice bag each 300.00 300.00 300.00 300.00 2171 Saline box each 100.00 100.00 100.00 100.00 2172 Hand Wash liquid soap each 150.00 150.00 150.00 150.00 2173 Basin with soap with necessary water supply facility each 5,000.00 5,000.00 5,000.00 5,000.00 2174 Safety Helmet each 200.00 200.00 200.00 200.00 2175 Safety Belt each 400.00 400.00 400.00 400.00 2176 Safety Shoe each 600.00 600.00 600.00 600.00 2177 Apron each 120.00 120.00 120.00 120.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 65 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 2178 Gumboot each 250.00 250.00 250.00 250.00 2179 Goggles each 80.00 80.00 80.00 80.00 2180 Hiring of complete Surveillance facility for monitoring construction work 1 job 40,000.00 40,000.00 40,000.00 40,000.00 2181 0.45 mm thick foreign made celluloid paper rft 10.00 10.00 10.00 10.00 2182 Adhesive glue for fixing celluloid paper to fair face shutter liter 160.00 160.00 160.00 160.00 2183 Tar boiler per day 1,120.00 1,120.00 1,120.00 1,120.00 2184 Vibrating roller Pedestrain (0.5 - 1 ton) per day 3,500.00 3,500.00 3,500.00 3,500.00 2185 Cart fare within 5 km per trip 600.00 600.00 600.00 600.00 2186 2 mm geo-textile per sft 11.33 11.33 11.33 11.33 C25 CARRIAGE OF MATERIALS 2187 Carriage of materials except bricks and bats by motor trucks bullock carts or any other means, including loading, unloading at both ends and stacking properly at site as per direction of the Engineer. (a) Up to 1.5 kilometer per M. ton 226.00 226.00 226.00 226.00 (b) Up to 3.0 kilometer per M. ton 310.00 310.00 310.00 310.00 (c) Up to 5.0 kilometer per M. ton 405.00 405.00 405.00 405.00 (d) For each additional km beyond 5.0 kilometer and up to 30.0 kilometer per M. ton 21.00 21.00 21.00 21.00 (e) For each additional km beyond 30.0 kilometer and up to 80.0 kilometer per M. ton 15.00 15.00 15.00 15.00 (f) Beyond 80.0 kilometer per M. ton 10.50 10.50 10.50 10.50 2188 Weighing at both ends for items of steel materials only per M. ton 124.00 124.00 124.00 124.00 2189 Carriage of bricks or bats by motor truck, bullock carts or any other means including loading, unloading at both ends and stacking properly at site as per direction of the Engineer. (a) Up to 1.5 kilometer per % 0 nos 355.00 355.00 355.00 355.00 (b) Up to 3.0 kilometer per % 0 nos 475.00 475.00 475.00 475.00 (c) Up to 5.0 kilometer per % 0 nos 632.00 632.00 632.00 632.00 (d) For each additional km beyond 5.0 kilometer and up to 30.0 kilometer per % 0 nos 34.00 34.00 34.00 34.00 (e) For each additional km beyond 30.0 kilometer and up to 80.0 kilometer per % 0 nos 22.00 22.00 22.00 22.00 (f) Beyond 80.0 kilometer per % 0 nos 7.00 7.00 7.00 7.00 C26 BATCHING AND READY MIX CONCRETE 2190 Hire and operational cost for batching mixture plant per cum (excluding fuel) per cum 273.00 273.00 273.00 273.00 2191 Hire and operational cost for pay loader per cum (excluding fuel) per cum 131.00 131.00 131.00 131.00 2192 Hire and operational cost of pump machine (excluding fuel) per cum 206.00 206.00 206.00 206.00

RATES OF MAN, MATERIAL AND MARK-UPS PWD SoR 2022 (2nd REVISED) for Civil Works 66 SL Items Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 2193 Hire and operational cost of transit mixture (excluding fuel) per cum 143.00 143.00 143.00 143.00 2194 Production cost of Ready Mix Concrete (excluding material cost) including carrying and pumping at site per cum 410.00 410.00 410.00 410.00 2195 Water reducing high range chemical (for batching/RMC) admixture Type G per kg 140.00 140.00 140.00 140.00 2196 Micro Silica (for high strength concrete) per kg 80.00 80.00 80.00 80.00

GENERAL, SITE FACILITIES AND SAFETY PWD SoR 2022 (2nd REVISED) for Civil Works 67 CHAPTER 01: GENERAL, SITE FACILITIES AND SAFETY Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 01.1 Erection and maintenance of semi-permanent site office and removal of the same after completion of work in accordance with the conditions of contract. In addition to the office required for own use, the contractor shall provide and maintain furnished site office for the use of Engineer-in- charge and his staff. The site office must have tiles floor, adequate foundation, brick walls, false ceiling of gypsum board and all windows are to be glazed, shuttered and provided with steel grill. Outside and inside wall surface are to be painted on plaster acceptable to the Engineer-in- charge. The site office shall be maintained in a secure condition by the contractor until the completion of the contract and shall be provided with electricity, water supply, wash rooms and sewerage facilities. All doors shall be fitted with approved locks and windows shall be provided with curtain/blinds. Before construction the contractor shall submit plans and drawings showing proposed details and location for the site office, including foundations, access roads, shades, layout of electrical and water supply and hard standings there for the approval of Engineer-in-charge. The Engineer-in-charge may require revision of the plans prior to giving approval for construction. The contractor shall also submit detailed proposed furniture, fittings and other items of equipment and plant to the Engineer-in-charge for approval. These items shall be of the standard quality suitable for site. The office, complete with furnishings, fittings, access roads and hard standings shall be ready for occupation by the Engineer-in-charge within 28 days from the date of taking over site by the contractor. The contractor shall provide day and night guards and an attendant for the field office. At the end of the contract all materials, equipment and plant, furniture, fittings recovered from dismantling the office and removing access road will be the property of the contractor. No interim payment shall be certified unless engineer’s office with required facilities are constructed and accepted by the Engineer-in-charge. (This is a time related item; proportionate payment for this item shall be made distributing in each bill on the basis of percentage progress of the whole works under contract) 01.1.1 Engineer's site office of minimum 10 sqm plinth area with providing necessary facilities including office furniture, consumables, stationeries etc. job 51,706.00 51,706.00 51,706.00 51,706.00 01.1.2 Engineer's site office of minimum 15 sqm plinth area with providing necessary facilities including office furniture, consumables, stationeries, water purifier etc. job 82,603.00 82,603.00 82,603.00 82,603.00 01.1.3 Engineer's site office of minimum 38 sqm plinth area with providing necessary facilities including office furniture, 24000 BTU air cooler, umbrella, crookeries, water purifier, job 500,661.00 500,661.00 500,661.00 500,661.00

GENERAL, SITE FACILITIES AND SAFETY PWD SoR 2022 (2nd REVISED) for Civil Works 68 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur PC with monitor, uninterruptible power supply (UPS), laser jet printer (minimum 20 ppm), LED flood light fittings (Halogen) for sight security etc. 01.1.4.1 Providing necessary facilities in construction site for maintaining site safety of 30 nos construction worker including safety helmet, safety belt, apron, gumboot, goggles etc. set 39,725.00 39,725.00 39,725.00 39,725.00 01.1.4.2 Providing necessary facilities in construction site for maintaining site safety of 10 nos construction inspection team member including safety helmet, safety goggles, safety shoe etc. set 11,098.00 11,098.00 11,098.00 11,098.00 01.1.4.3 Supplying and providing of first aid box with necessary materials/medicine (hygienic gown, thermometer, adhesive dressings, antiseptic solutions, bandages, cotton balls or swaps, emergency blanket, gloves, hand sanitizer, ice pack, saline etc.) all complete as per direction of Engineer-in- charge. each 16,666.00 16,666.00 16,666.00 16,666.00 01.1.5 Hiring, installation, testing & commissioning of CCTV/Surveillance facilities for monitoring construction site including supply, fixing of 5.0 megapixel IR fixed bullet network IP camera including lens, bracket, housing with outdoor night vision facilities, full HD 1080 pixel, real time video, network video recorder (NVR) , 2 TB HDD for NVR , 4/8/16/32 port PoE switch, 32"/42" Full HD CCTV monitor, cable & accessories, internet connection with operation & maintenance cost throughout contract completion period, re- fitting & re-fixing with progress of construction all complete as per direction of Engineer-in-charge. job 50,444.00 50,444.00 50,444.00 50,444.00 01.1.6 Providing and maintenance one project profile signboards to be placed at a suitable place of the site including submission of proposals for the materials of the signboards and text layout containing 3D picture, safety instructions, project information with security light etc. to the Engineer-in-charge for approval which will be positioned as directed by the Engineer-in-charge and removing the same on completion of the works or as instructed by the Engineer- in-charge. sqm 3,392.00 3,367.00 3,329.00 3,329.00 01.2.1 Providing 3 sets as-built drawings subject to Engineer’s approval produced in AutoCAD software in 584.5 mm x 413.5 mm (A-2 size) standard drawing paper, and operating and maintenance manual of the equipment and plant incorporated in the works, if any, in original by the date stated in the particular conditions of contract (PCC). If the contractor does not supply the as-built drawings and operating & maintenance manuals by the date stated in the particular conditions of contract (PCC), or they do not receive the Engineer- in-charge’s approval, the Engineer-in-charge shall per tender 29,041.00 29,041.00 29,041.00 29,041.00

GENERAL, SITE FACILITIES AND SAFETY PWD SoR 2022 (2nd REVISED) for Civil Works 69 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur withhold the amount stated in the PCC from the payments due to the contractor. The as-built drawings must show the permanent works as actually constructed and reflect the revision of drawings supplied to the contractor during the Contract as well as revisions of drawings supplied to the contractor during the contract. (One set of as-built drawings shall be considered for measurement and payment) 01.2.2 Providing additional copy of as-built drawing produced in AutoCAD software in 584.5 mm x 413.5 mm (A-2) standard drawing paper accepted by the Engineer-in-charge. sqm of drawing sheet 340.00 340.00 340.00 340.00 01.3.1 Providing coloured progress picture & video of works, CCTV monitoring system operation and related data processing, regular data updating & all other relevant works regarding online monitoring system etc. per month 33,401.00 33,401.00 33,401.00 33,401.00 01.4.1 Preparation & submission of work programme / schedule to the Engineer-in-charge for approval prior ground breaking showing the events (works) and successive sub-events of works including all the management & control parameters like Earliest Start Time (EST), Earliest Finish Time (EFT), float events on critical path, etc. with description of general method of works, in orderly manner all in the form of network diagram prepared in computer software like MS project/ Primavera and presenting in displayable hard and soft copy minimum 3 (three) sets. per tender 32,967.00 32,967.00 32,967.00 32,967.00 01.4.2 Updating the work programme and submission to the Engineer-in-charge at intervals no longer than 28 days showing actual physical and financial progress achieved on each activity and the effect of the progress on the timing of the remaining work, including any changes to the sequence of the activities. However, Engineer’s approval of the programme shall not alter the contractor’s obligations. The contractor may revise the programme and submit it to the Engineer-in-charge again at any time. A revised programme shall show the variations and events related to change of contract price. Month wise documentation shall be the basis of payments on this item. per revision 9,763.00 9,763.00 9,763.00 9,763.00 01.5 Providing all necessary logistic support to frame ‘monthly progress meeting’ between contractor/contractor’s representatives and employer / employer’s representatives at the Engineer-in-charge's office at site. Month wise documentation shall be the basis of payments on this item. per month 2,493.00 2,447.00 2,266.00 2,266.00 01.6 Providing layout and carry over PWD/ temporary bench- mark (BM) at site from nearby BM pillar, property lines, existing ground level (EGL), formation ground level (FGL), highest flood levels (HFL), plinth levels (PL), setting and marking all pillars, marker, pegs etc. showing and sqm 34.00 33.00 31.00 31.00

GENERAL, SITE FACILITIES AND SAFETY PWD SoR 2022 (2nd REVISED) for Civil Works 70 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur maintaining reduced levels (RL’s) including locating, establishing, protecting all public utilities within the premise of work and finally all to be presented in black and white. 01.7 Mobilization and cleaning site before commencing actual physical work and during contract period and demobilization after completion of the works under contract to be accepted by the Engineer-in-charge. This work shall also cover cleaning and clearing, cutting or filling, dressing the project area on and in the ground to an extent that all the events of works of the project can be executed smoothly in a working environment with a particular attention on safety and security in all respects, and to stockpile the end outcome to a place for disposal agreed by the Engineer-in-charge, where, payments are to be based on ground area determined by the Engineer-in-charge and be proportionate to the percentage progress of work under contract as a whole in all respects and approved by the Engineer-in-charge. sqm 224.00 220.00 204.00 204.00 01.8 Providing expertise architect having minimum qualification Bachelor of Architecture and relevant experience(s) more than 5 years with registration in respective professional body for detail documentation of architectural themes, drawings, working out shop drawings, communication with theme architect & getting approval, specifying architectural needs according to approved master architectural themes & plan, certifying as built drawing for the approval etc. and any relevant jobs assigned by the HOPE or his official at site. (max. man month not greater than 1/4 of initial contract duration or contract completion time whichever is less & payment for the item subject to submission of CV & approved by HOPE or his authorized officer). per month 80,000.00 80,000.00 80,000.00 80,000.00 01.9 Providing expertise engineer having minimum qualification B.Sc. in Civil Engineering and relevant experience(s) more than 10 years with registration in respective professional body for project documentation, progress study & adjustment, preparation of project material schedule and testing schedule for approval etc. & jobs assigned by the HOPE or his official, at site. (max. man month not greater than 1/4 of initial contract duration or contract completion time whichever is less & payment for the item subject to submission of CV & approved by HOPE or his authorized officer). per month 120,000.00 120,000.00 120,000.00 120,000.00 01.10 Providing transport facilities for quality control part of project which includes carrying test samples, work samples, report collection & emergency services of project including cost of fuel, driver, maintenance etc. (Total duration is 1/2 of the initial contract duration or contract completion time whichever is less). per month 70,000.00 70,000.00 70,000.00 70,000.00

GENERAL, SITE FACILITIES AND SAFETY PWD SoR 2022 (2nd REVISED) for Civil Works 71 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 01.11 Supplying, fitting, fixing, operating and maintenance of the construction supervision lift (1000Kg capacity) for supervision of building construction work during the entire construction period including all necessary components like, steel frame, car, guide rails. push button, driving motor, gear box, car door, travelling cable, RCC base for steel frame, necessary connections with the building, electric supply & electricity bill and dismantling the same after completion of the building construction etc. all complete complying all safety factors and accepted by the Engineer-in-charge. (The construction supervision lift shall be the contractor property after completion of work). Number of month shall be calculated as 1/2 (half) of the initial contract period or contract completion time whichever is less for new construction and full contract period for vertical extension work. The contractor must submit detail structural drawing of supporting frame with foundation and lift specification prior to supply on site. 01.11.1 6th to 9th floor, hoisting speed 40 m/min per month 18,222.00 18,222.00 18,222.00 18,222.00 01.11.2 10th to 14th floor, hoisting speed 40 m/min per month 22,066.00 22,066.00 22,066.00 22,066.00 01.11.3 15th to 19th floor, hoisting speed 50 m/min per month 25,852.00 25,852.00 25,852.00 25,852.00 01.11.4 20th to 24th floor, hoisting speed 60 m/min per month 29,961.00 29,961.00 29,961.00 29,961.00 01.11.5 25th to 29th floor, hoisting speed 60 m/min per month 33,319.00 33,319.00 33,319.00 33,319.00 ……………………. END OF CHAPTER ONE …………………….

EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING PWD SoR 2022 (2nd REVISED) for Civil Works 72 CHAPTER 02: EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 02.1 Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines, local bench- mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer- in-charge, subject to submit method statement of carrying out excavation work to the Engineer-in-charge for approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations under the contract. 02.1.1 Layout and marking for earthwork in excavation in foundation accepted by the Engineer-in-charge. [Plinth area of the structure shall be considered for measurement] sqm 20.00 19.00 18.00 18.00 02.1.2 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead cum 173.00 169.00 158.00 158.00 02.1.3 Added rate for each additional 0.5 meter depth exceeding 1.5 meter. cum 31.00 30.00 28.00 28.00 02.1.4 Added rate for each 1 m additional lead beyond 10 m. cum 4.00 4.00 4.00 4.00 02.2 Bailing out of trapped water caused by inundation or rain, by pump from foundation trenches. hour 526.00 487.00 471.00 471.00 02.3 Supplying of straight and strong borrak bamboo posts of having minimum 75 mm diameter althrough and driving the same vertically in the ground up to required depth by any means shaping the top of the post, all complete and accepted by the Engineer-in-charge. meter 93.00 92.00 83.00 83.00 02.4 Supplying of wooden ballah having an average diameter not less than 150 mm (without barks) at one third distance from larger end with a minimum end diameter of 100 mm for retaining purpose and driving to a depth as per design and drawing by any method including all arrangement for staging, hoisting, carrying etc. complete and accepted by the Engineer-in-charge. meter 621.00 614.00 587.00 587.00 02.5 Palisading work by supplying of bitumen drum sheet walling tied with 20 BWG G.I. wire fixing the same with already driven borrak bamboo posts with half split borrak bamboo runners @ 450mm c/c horizontally with iron nails, G.I wire etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of bamboo post). sqm 630.00 624.00 599.00 599.00 02.6 Supplying and fitting-fixing horizontal bracing in palisading with half split wooden ballah having an average diameter not less than 150 mm with a minimum end diameter of 100 mm @ 450 mm c/c including supply of iron nails, gazals etc. complete approved and accepted by the Engineer-in-charge. meter 233.00 232.00 224.00 224.00

EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING PWD SoR 2022 (2nd REVISED) for Civil Works 73 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 02.7.1 Shore protection work during excavation in foundation trenches up to 1.5 m depth to protect loss due to damage of property by palisading accepted by the Engineer-in- charge. [The rate is including the cost of vertical post] sqm 731.00 725.00 692.00 692.00 02.7.2 Shore protection work during excavation in foundation trenches beyond 1.5 m depth to protect loss due to damage of property by palisading accepted by the Engineer-in- charge, [The rate is including the cost of vertical post] sqm 1,076.00 1,078.00 1,024.00 1,024.00 02.8 Supply of 2 mm thick best quality geo-textile from approved manufacturer/origin and laying as per manufacturer’s instructions approved and accepted by the Engineer-in- charge. Before commencement of laying of geo-textile, the contractor must submit the method statement for carrying out this work including sample with evidence of origin and compliance certificate from independent testing laboratory for approval. sqm 219.00 218.00 215.00 215.00 02.9 Removing sludge or semi-liquid clay/substances etc. not suitable for pumping out or carrying by head load from the bottom of any marshy land, lake, ditch, pond by mixing fine local sand of minimum F.M. 0.8 to a proportion such that it can be carried to an intermediate point of disposal and cutting the same including stacking and spreading properly on a suitable place to dry in the sun for a certain days and dispose the dried sludge or clay to a safe distance etc. complete and accepted by Engineer-in-charge subject to submit method statement to the engineer in charge for carrying out the works including ultimate disposal of the sludge under this item for approval. However, engineer’s approval shall not relieve the Contractor of his responsibilities and obligations under the contract. cum 1,083.00 1,073.00 996.00 996.00 02.10.1 Sand filling in foundation trenches and plinth with sand having minimum F.M. 0.5 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. cum 1,118.00 1,123.00 1,099.00 1,099.00 02.10.2 Sand filling in foundation trenches and plinth with sand having minimum F.M. 0.8 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. cum 1,199.00 1,201.00 1,145.00 1,145.00 02.10.3 Sand filling in foundation trenches and plinth with sand having min. F.M. 1.2 in 150 mm in layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. cum 1,332.00 1,338.00 1,281.00 1,281.00

EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING PWD SoR 2022 (2nd REVISED) for Civil Works 74 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 02.10.4 Sand filling in foundation trenches and plinth with sand having min. F.M. 2.2 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. cum 3,347.00 3,239.00 3,264.00 3,229.00 02.11 50 mm downgraded picked jhama khoa consolidation in foundation trenches by mixing the same with best quality local sand (F.M. 1.2) in (2:1) (Khoa:Sand) proportion to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) including breaking and screening chips, laying and spreading in 150 mm layers uniformly and compacting etc. all complete and accepted by the Engineer-in-charge. cum 6,223.00 6,207.00 5,947.00 5,947.00 02.12 50 mm downgraded picked jhama khoa consolidation in foundation trenches by mixing in mixer machine with best quality local sand (F.M. 1.2) and cement in (1:6:12) (Cement:Sand:Khoa) proportion to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) including breaking and screening chips, laying and spreading in150 mm layers uniformly and compacting etc. all complete and accepted by Engineer-in-charge. cum 7,211.00 7,200.00 6,960.00 6,960.00 02.13 Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) including carrying watering, leveling, dressing and compacting to a specified percentage each layer up to finished level etc. all complete and accepted by Engineer-in-charge. cum 213.00 208.00 194.00 194.00 02.14 Cleaning and disposing of excavated earth from the construction site by truck or by any other means to a place within 30 km radius of the city or town area including loading & unloading at both ends, leveling and dressing the carried earth etc. complete and accepted by the Engineer-in-charge. cum 779.00 774.00 707.00 707.00 02.15 Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or by any other means including loading and unloading at both ends, leveling, watering and compacting to achieve minimum dry density of 95% with optimum moisture content (modified proctor test) including local carriage each layer up to finished level including cost of water and test (carried from beyond 300 m) etc. all complete and accepted by the Engineer-in- charge. cum 729.00 725.00 657.00 657.00 02.16 Site development/Improvement by carted earth or dredged sand, sandy silt (free from any organic, foreign, environmental hazardous substances) carried by head or truck or any other means including cost of cutting or by dredging of sand, sandy silt, all; including local carrying, placing the earth/sand, sandy silt in the designated area, maintaining slopes, breaking lumps, levelling and dressing in layers up to finished level etc. all complete as per direction and accepted by the Engineer-in-charge.

EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING PWD SoR 2022 (2nd REVISED) for Civil Works 75 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 02.16.1 By other method/means than dredging. cum 781.00 776.00 703.00 703.00 02.16.2 By dredging including necessary systems thereof. cum 524.00 523.00 472.00 472.00 02.17 Mechanical compaction of earth beyond plinth area, required for pre-approved specific engineering purpose in 150 mm layers including levelling, watering and consolidation each layer with chain dozer, grader, roller etc. to achieve minimum dry density of 95% with optimum moisture content (modified proctor test) up to finished level all complete and accepted by the engineer-in-charge subjected to submission of the method statement. cum 255.00 225.00 214.00 214.00 02.18 Earthwork in excavation of pond of any dimension in all kinds of soil including cutting up to required depth including bailing out water and throwing on the embankment, breaking clods, ramming and leveling, dressing in 225 mm layer with maintaining the side slopes and level of both pond and the embankment as per design and accepted by the Engineer- in-charge. 02.18.1 For initial lead of 30 m and lift of 1.5 m cum 266.00 262.00 243.00 243.00 02.18.2 Added for each additional lift of 0.3 m beyond 1.5 m and up to 3 m cum 9.00 9.00 8.00 8.00 02.18.3 Added for each additional lift of 0.3 m beyond 3 m and up to 4.5 m cum 14.00 13.00 12.00 12.00 02.18.4 Added for each additional lift of 0.3 m beyond 4.5 m and up to 6 m cum 19.00 19.00 18.00 18.00 02.18.5 Added for each additional lead of 30 m or part thereof beyond initial lead 30 meter cum 36.00 35.00 32.00 32.00 02.19.1 Bailing out water by 1 cusec diesel operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. all complete and accepted by the Engineer-in-charge. per hour 693.00 686.00 659.00 659.00 02.19.2 Bailing out water by 1 cusec electricity operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. all complete and accepted by the Engineer-in-charge. per hour 575.00 569.00 542.00 542.00 ……………………. END OF CHAPTER TWO …………………….

BRICK SOLING, CC, DPC ETC PWD SoR 2022 (2nd REVISED) for Civil Works 76 CHAPTER 03: BRICK SOLING, CC, DPC ETC. Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 03.1.1 One layer brick flat soling in foundation or in floor with first class/picked jhama bricks (BDS 208) including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge. sqm 654.00 651.00 624.00 624.00 03.1.2 One layer brick flat soling in foundation or in floor with sand cement solid block (SCSB) (240x114x70) mm including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge. sqm 613.00 612.00 607.00 607.00 03.2.1 One layer Herringbone bond (HBB) brick soling in foundation or in floor with first class/picked jhama bricks (BDS 208) including preparation of bed and filling the interstices with local sand, leveling including supply of water, other charges, costs of tools and plants etc. all complete and accepted by the Engineer-in-charge. sqm 1,029.00 1,026.00 984.00 984.00 03.2.2 One layer Herringbone bond (HBB) brick soling in foundation or in floor with sand cement solid block (SCSB) (240x114x70) mm including preparation of bed and filling the interstices with local sand, leveling including supply of water, other charges, costs of tools and plants etc. all complete and accepted by the Engineer-in-charge. sqm 1,027.00 1,024.00 1,016.00 1,016.00 03.3.1 Brick on end edging with 1st class brick (BDS 208) including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge. meter 156.00 155.00 149.00 149.00 03.3.2 Brick on end edging with Automatic machine made 1st class brick (240x114x70) mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge. meter 187.00 186.00 185.00 185.00 03.3.3 Brick on end edging with Sand Cement Solid block (SCSB) (240x114x70) mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge. meter 156.00 155.00 154.00 154.00 03.4 Lean/ blinding concrete (1:3:6) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) 03.4.1 Lean/ blinding concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. 1.2 cum 9,622.00 9,607.00 9,335.00 9,335.00 03.4.2 Lean/ blinding concrete in floor (1:3:6) with cement, brick chips and sand of F.M. 1.2 cum 9,516.00 9,500.00 9,221.00 9,221.00

BRICK SOLING, CC, DPC ETC PWD SoR 2022 (2nd REVISED) for Civil Works 77 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 03.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in- charge. (Cement: CEM-II / B-M) 03.5.1 Mass concrete in foundation (1:2:4) with brick chips and local sand of F.M. 1.2. cum 10,796.00 10,780.00 10,508.00 10,508.00 03.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2. cum 10,749.00 10,734.00 10,457.00 10,457.00 03.6 Damp proof course (DPC) (1:1.5:3) of cement concrete with cement, sand and stone chips including breaking of chips, screening, centering, shuttering, casting, curing and finishing with a coat of bitumen including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M) 03.6.1 75 mm thick damp proof course (1:1.5:3) with cement, Sylhet sand (F.M. 2.2) and stone chips. sqm 1,642.00 1,639.00 1,577.00 1,563.00 03.6.2 150 mm thick damp proof course (1:1.5:3) with cement, Sylhet sand (F.M. 2.2), stone chips and water-proofing admixture/agent approved by Engineer-in-charge. cum 16,994.00 16,991.00 16,473.00 16,284.00 03.7 Supplying and laying of single layer polythene sheet weighing one kilogram per 6.5 square meter in floor or anywhere below cement concrete complete in all respect and accepted by Engineer-in-charge. sqm 48.00 48.00 47.00 47.00 ……………………. END OF CHAPTER THREE …………………….

BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 78 CHAPTER 04: BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 04.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:6) in foundation and plinth, filling the joints/interstices fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer-in-charge.(Cement: CEM-II/B-M) cum 9,394.00 9,366.00 8,987.00 8,987.00 04.2 Brick works of width one brick or one and a half brick length of first class bricks with cement sand (F.M. 1.2) mortar (1:6) in superstructure including raking out joints, filling the interstices with mortar, cleaning and soaking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor cum 10,057.00 10,018.00 9,599.00 9,599.00 04.3 Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) in exterior walls including filling the interstices with mortar, raking out joints, cleaning and socking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete including cost of water, electricity and other charges (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor cum 10,377.00 10,340.00 9,925.00 9,925.00 04.4 Exposed brick works (for exterior wall without outside plaster) with special quality sorted out first class bricks, very carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of joints, true to vertical and horizontal lines including raking out joints, scaffolding, soaking the bricks at least for 24 hours before use, washing and screening of sand, curing at least for 7 days and high class flush pointing with cement sand (F.M. 1.2) mortar (1:1) including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) In ground floor cum 11,323.00 11,284.00 10,827.00 10,827.00 04.5 Exposed brick works (for exterior wall without outside plaster) with automatic machine made first class bricks, very carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of joints, true to vertical and horizontal lines including raking out joints, scaffolding, soaking the bricks at least for 24 hours before use, washing and screening of sand, curing at least for 7 days and high class flush pointing with cement sand (F.M. 1.2) mortar 1:1) including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) In ground floor cum 12,156.00 12,117.00 11,929.00 11,929.00

BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 79 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 04.6 Brick works with 10 holes machine made bricks of approved size (241 mm x 114 mm x 70 mm) having uniform colour carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of joints, true to vertical and horizontal lines including raking out joints, filling the interstices with mortar, cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand, necessary scaffolding, curing at least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including cost of water, electricity and other charges etc. complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor cum 14,067.00 14,027.00 13,839.00 13,839.00 04.7 Brick work with 241 mm x 114 mm x 70 mm size machine made solid klinker facing bricks having uniform colour carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of joints, true to vertical and horizontal lines including raking out joints, filling the interstices with mortar, cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand, necessary scaffolding, curing at least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including cost of water, electricity and other charges etc. complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor cum 11,335.00 11,298.00 11,116.00 11,116.00 04.8 Brick works with 241 mm x 114 mm x 70 mm size 10 hole machine made rock-face or textured klinker facing bricks having uniform colour carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of joints, true to vertical and horizontal lines including raking out joints, filling the interstices with mortar, cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand, necessary scaffolding, curing at least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) In ground floor cum 13,815.00 13,782.00 13,616.00 13,616.00 04.9 Brick works with 241 mm x 114 mm x 70 mm size 3 hole machine made reinforced klinker facing bricks having uniform colour carefully laid in cement sand (F.M.1.2) mortar (1:4) in superstructure with uniform width and depth of joints, true to vertical and horizontal lines including raking out joints, filling the interstices with mortar, cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand, necessary scaffolding, curing at least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor cum 15,840.00 15,797.00 15,637.00 15,634.00 04.10 Added cost for each additional floor above ground floor for brick works (Item No.- 4.2 to 4.9) cum 184.00 180.00 167.00 167.00

BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 80 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 04.11 Added cost for brick work for each additional meter (or part of meter) free height of brick wall beyond 4 m from the respective floor in auditorium, godown, overhead water tank etc. as description of the Item No. 4.2 to 4.9 including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Added cost shall be incorporated in the estimate only when both sides of wall is uninterruptedly free beyond 4.0 meter) cum 233.00 230.00 218.00 218.00 04.12 Providing brick works for 200 mm x 100 mm facing in superstructure with 200 mm x 100 mm x 50 mm machine made klinker hard pressed facing bricks of approved quality with cement sand (F.M. 1.2) mortar (1:4), including racking out joints, cutting the bricks to required size wherever necessary including high class recessed pointing, cleaning and soaking the bricks at least for 24 hours before use and washing and screening of sand, necessary scaffolding, curing at least for 7 days for all floors up to 4th floor including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (100 mm x 200 mm face should be placed for facing). (Cement: CEM-II/B-M) In ground floor sqm 2,089.00 2,082.00 2,037.00 2,037.00 04.13 Providing brick works for 200 mm x 50 mm facing in superstructure with 200 mm x 50 mm x 50 mm machine made hard pressed klinker facing red or maroon strips of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:4), 10 mm thick cement mortar in adjacent sides including racking out joints and cutting the bricks to required sizes wherever necessary with high class recessed pointing, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days for all floors up to 4th floor including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 3,015.00 3,008.00 2,962.00 2,962.00 04.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%) in superstructure with machine made hard pressed klinker facing strips of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3) in adjacent side wall, column, drop wall etc. and racking out joints, cutting to required sizes wherever necessary with high class recessed pointing, cleaning and soaking at least for 24 hours before use washing and screening of sand and necessary scaffoldings, curing at least 7 days including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor. 04.14.1 With 200 mm x 62 mm x 16.51 mm red strip sqm 2,736.00 2,727.00 2,681.00 2,681.00 04.14.2 With 200 mm x 62 mm x 12.7 mm beige strip sqm 2,984.00 2,976.00 2,930.00 2,930.00 04.14.3 With 200 mm x 62 mm x 8.9 mm red strip sqm 2,545.00 2,536.00 2,490.00 2,490.00 04.14.4 With 241 mm x 70 mm x 12.7 mm red strip sqm 3,019.00 3,010.00 2,964.00 2,964.00 04.14.5 With 242 mm x 70 mm x 12.7 mm matt glazed textured strip sqm 3,458.00 3,450.00 3,404.00 3,404.00

BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 81 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 04.15 125 mm brick work with first class bricks with cement sand (F.M. 1.2) mortar (1:6) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 1,411.00 1,405.00 1,345.00 1,345.00 04.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 1,447.00 1,442.00 1,383.00 1,383.00 04.17 Exposed 125 mm thick pointing ornamental brick work with sorted out first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 1,763.00 1,756.00 1,682.00 1,682.00 04.18 Exposed 125 mm thick pointing ornamental brick work with automatic machine made first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 1,820.00 1,813.00 1,776.00 1,776.00 04.19 Providing 125 mm thick brick work in superstructure (partition walls) with cement sand (F.M. 1.2) mortar (1:4) with 10 hole machine made ceramic bricks of approved size having uniform colour, carefully laid in cement mortar of uniform width & depth of joints, true to vertical and horizontal lines including racking out joints, filling the interstices with same mortar, making bond with connected walls, cleaning, soaking brick at least 24 hours and washing of sand, curing 7 days in all floors, including cost of water, electricity and other charges accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 1,979.00 1,973.00 1,942.00 1,942.00 04.20 Fancy screen work with different size hollow machine made design blocks of uniform colour, carefully laid in cement sand (F.M. 1.2) mortar(1:3) in all floors in wall with

BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 82 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur uniform mortar joints, true to vertical and horizontal line including racking out joints, cleaning and soaking the blocks for minimum 24 hours before use including washing and screening of sand, scaffolding, curing etc. complete in all respect including supply of all necessary materials, cost of water, electricity and other charges accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) 04.20.1 With design block size: 114 mm x 114 mm x 114 mm or equivalent volume & design. In ground floor sqm 4,695.00 4,684.00 4,628.00 4,628.00 04.20.2 With design block size: 140 mm x 140 mm x 102 mm or equivalent volume & design. In ground floor sqm 3,361.00 3,350.00 3,297.00 3,297.00 04.20.3 With design block size: 152 mm x 152 mm x 102 mm or 152 mm x 152 mm x 114 mm or equivalent volume and design. In ground floor sqm 3,104.00 3,094.00 3,040.00 3,040.00 04.20.4 With design block size: 203 mm x 203 mm x 108 mm or equivalent volume and design. In ground floor sqm 2,327.00 2,316.00 2,270.00 2,270.00 04.20.5 With design block size: 203 mm x 121 mm x 102 mm or equivalent volume and design. In ground floor sqm 2,555.00 2,544.00 2,498.00 2,498.00 04.20.6 With design block size: 152 mm x 152 mm x 152 mm or equivalent volume and design. In ground floor sqm 3,104.00 3,094.00 3,040.00 3,040.00 04.20.7 With design block size: 241 mm x 114 mm x 70 mm or equivalent volume and design. In ground floor sqm 2,485.00 2,475.00 2,421.00 2,421.00 04.21 Added cost for each additional floor above ground floor for brick and screen block works (Item No.- 4.12 to 4.20) sqm 30.00 29.00 27.00 27.00 04.22 Klinker paving brick works in floor or pavement with machine made pressed bricks of approved quality with cement sand (F.M. 1.2) mortar (1:4) on minimum 12 mm thick cement sand (F.M. 1.2) mortar (1:4) including raking out joints, cutting the bricks to required size, soaking the same for 24 hours before use wherever necessary including high class flush pointing in cement mortar (1:2), cleaning, curing at least for 7 days etc. including washing and screening of sand, cost of water, electricity and other charges complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) 04.22.1 100 mm thick flat brick pavement with 200 mm x 100 mm x 50 mm size klinker facing bricks. sqm 3,260.00 3,247.00 3,200.00 3,200.00 04.22.2 50 mm thick brick on edge pavement with 200 mm x 100 mm x 50 mm klinker paving bricks in 1:4 cement sand mortar having 200 mm x 100 mm face at top. sqm 1,993.00 1,982.00 1,943.00 1,943.00

BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 83 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 04.22.3 50 mm thick brick pavement with 200 mm x 50 mm x 50 mm klinker facing bricks. sqm 2,934.00 2,922.00 2,879.00 2,879.00 04.23 125 mm thick brick pavement or flooring with first class brick on edge with cement sand (F.M. 1.2) mortar (1:4) on minimum 12 mm thick cement sand (F.M. 1.2) mortar (1:4) including cutting the bricks as per requirement, cleaning and racking out joints, finishing with flush pointing with cement sand (F.M. 1.2) mortar (1:2) and curing for at least 7 days etc. including cost of water, washing and screening of sand (F.M. 1.2), electricity and other charges complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) sqm 1,671.00 1,660.00 1,588.00 1,588.00 04.24 125 mm thick brick pavement/flooring with 10 hole machine made ceramic bricks with cement sand (F.M. 1.2) mortar (1:4) on minimum 12 mm thick cement sand (F.M. 1.2) mortar (1:4) including cutting the bricks as per requirement, cleaning and racking out joints, finishing with flush pointing with cement sand (F.M. 1.2) mortar (1:2) and curing for at least 7 days etc. including cost of water, washing and screening of sand (F.M. 1.2), electricity and other charges etc. all complete and accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) sqm 2,140.00 2,129.00 2,090.00 2,090.00 04.25 75 mm thick cement concrete (1:3:6) flooring with cement, best quality coarse sand and 19 mm downgraded picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting, washing and screening of sand (F.M 1.2) and curing at least for 7 days etc. including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) sqm 721.00 721.00 699.00 699.00 04.26 25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well graded brick chips including breaking chips, screening, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 551.00 546.00 525.00 525.00 04.27 38 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well graded brick chips including breaking chips, screening, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 685.00 679.00 656.00 656.00

BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 84 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 04.28 25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 608.00 604.00 577.00 572.00 04.29 38 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. Cement: (CEM-II/B-M) In ground floor sqm 770.00 767.00 735.00 727.00 04.30 25 mm thick artificial patent stone (1:1.5:3) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 630.00 627.00 600.00 595.00 04.31 38 mm thick artificial patent stone (1:1.5:3) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge.(Cement: CEM-II/B-M) In ground floor sqm 804.00 801.00 769.00 761.00 04.32 Added cost for each additional floor above ground floor for patent stone works. sqm 26.00 26.00 24.00 24.00 ……………………. END OF CHAPTER FOUR …………………….

MOSAIC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 85 CHAPTER 05: MOSAIC WORKS Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 05.1 10 mm thick finished and 12.5 mm laying thickness cast in situ mosaic work on floor with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cement / grey cement including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No.120) /cutting with mosaic cutting machine and finishing with minar stone and spreading oxalic acid including breaking of brick chips, screening, washing mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I) 05.1.1 With Indian chips and glass strip using 100% white cement In ground floor sqm 2,255.00 2,240.00 2,176.00 2,176.00 05.1.2 With Indian chips and glass strip using 100% grey cement In ground floor sqm 1,966.00 1,952.00 1,888.00 1,888.00 05.1.3 With Pakistani chips and glass strip using 100% white cement In ground floor sqm 2,289.00 2,274.00 2,210.00 2,210.00 05.1.4 With Pakistani chips without glass strip using 100% grey cement In ground floor sqm 1,710.00 1,696.00 1,642.00 1,642.00 05.1.5 With Indian chips without glass strip using 100% grey cement In ground floor sqm 1,676.00 1,662.00 1,608.00 1,608.00 05.1.6 With Pakistani chips without glass strip using 100% white cement In ground floor sqm 1,999.00 1,985.00 1,930.00 1,930.00 05.2 12 mm thick finished and laying thickness 14.5 mm cast in situ mosaic work on floor with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing 100% white cement including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120)/ cutting with mosaic cutting machine and finishing with minar stone including breaking of brick chips, screening, spreading oxalic acid, washing of mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I) 05.2.1 With Indian chips and glass strip In ground floor sqm 2,347.00 2,332.00 2,268.00 2,268.00

MOSAIC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 86 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 05.2.2 With Pakistani chips and glass strip In ground floor sqm 2,385.00 2,370.00 2,306.00 2,306.00 05.2.3 With Indian chips without glass strip In ground floor sqm 2,056.00 2,043.00 1,988.00 1,988.00 05.2.4 With Pakistani chips without glass strip In ground floor sqm 2,094.00 2,081.00 2,026.00 2,026.00 05.3 10 mm thick finished and laying thickness 12.5 mm silver grey cast in situ mosaic work on floor with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120) and finishing with minar stone including breaking of brick chips, screening, washing of mosaic chips and supply of all necessary materials including water, electricity and other charges in all respect and accepted by the Engineer- in-charge. (Cement: CEM-I) 05.3.1 With Indian chips and glass strip In ground floor sqm 2,111.00 2,096.00 2,032.00 2,032.00 05.3.2 With Pakistani chips and glass strip In ground floor sqm 2,145.00 2,130.00 2,066.00 2,066.00 05.3.3 With Indian chips without glass strip In ground floor sqm 1,821.00 1,807.00 1,752.00 1,752.00 05.3.4 With Pakistani chips without glass strip In ground floor sqm 1,855.00 1,841.00 1,786.00 1,786.00 05.4 12 mm thick finished and laying thickness 14.5 mm silver grey cast in situ mosaic work on floor with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panels, compacting, curing at least for 7 days, cutting with pumice stone (No. 40. No. 80, No. 120) and finishing with minar stone including breaking of brick chips, screening, washing of mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in- charge. (Cement: CEM-I) 05.4.1 With Indian chips and glass strip In ground floor sqm 2,185.00 2,170.00 2,106.00 2,106.00 05.4.2 With Pakistani chips and glass strip In ground floor sqm 2,223.00 2,208.00 2,144.00 2,144.00

MOSAIC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 87 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 05.4.3 With Indian chips without glass strip In ground floor sqm 1,895.00 1,881.00 1,826.00 1,826.00 05.4.4 With Pakistani chips without glass strip In ground floor sqm 1,933.00 1,919.00 1,864.00 1,864.00 05.5 10 mm thick finished and laying thickness 12.5 mm cast in situ mosaic work in wall with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing 100% white cement including preparation of mix and laying the same on 12 mm thick cement plaster (1:4) to wall including compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120), finishing the corners and edges and also finishing with minar stone and supplying all necessary materials including water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I) 05.5.1 With Indian chips In ground floor sqm 2,279.00 2,245.00 2,167.00 2,167.00 05.5.2 With Pakistani chips In ground floor sqm 2,313.00 2,279.00 2,201.00 2,201.00 05.6 10 mm thick finished and laying thickness 12.5 mm silver grey cast in situ mosaic work in wall with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix. and laying the same on 12 mm thick cement plaster (1:4) to wall including compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No 120) including finishing the corners and edges and also finishing with minar stone and supplying all necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I) 05.6.1 With Indian chips In ground floor sqm 2,135.00 2,101.00 2,023.00 2,023.00 05.6.2 With Pakistani chips In ground floor sqm 2,169.00 2,135.00 2,057.00 2,057.00 05.6.3 With Indian chips using 100% grey cement In ground floor sqm 1,991.00 1,957.00 1,879.00 1,879.00 05.7 10 mm thick finished laying in 12.5 mm thickness coloured cast in situ mosaic work in floor with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white and grey cement in proportion (9:1) and necessary quantity of approved colouring materials including preparation of mix and laying the same over min 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days, cutting

MOSAIC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 88 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur with pumice stone (No. 40, No. 80, No. 120) and finishing with Minar stone including breaking of brick chips, screening, washing of mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I) 05.7.1 With Indian chips and glass strip In ground floor sqm 2,342.00 2,327.00 2,263.00 2,263.00 05.7.2 With Pakistani chips and glass strip In ground floor sqm 2,376.00 2,361.00 2,297.00 2,297.00 05.7.3 With Indian chips without glass strip In ground floor sqm 1,763.00 1,749.00 1,695.00 1,695.00 05.7.4 With Pakistani chips without glass strip In ground floor sqm 1,941.00 1,928.00 1,873.00 1,873.00 05.8 12 mm thick finished and laying thickness 14 mm coloured cast in situ mosaic work on floor with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) and necessary quantity of approved colouring materials including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120) and finishing with minar stone including breaking of brick chips, screening, washing of mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in- charge. (Cement: CEM-I) 05.8.1 With Indian chips and glass strip In ground floor sqm 2,433.00 2,419.00 2,355.00 2,355.00 05.8.2 With Pakistani chips and glass strip In ground floor sqm 2,471.00 2,457.00 2,393.00 2,393.00 05.8.3 With Indian chips without glass strip In ground floor sqm 2,143.00 2,129.00 2,075.00 2,075.00 05.8.4 With Pakistani chips without glass strip In ground floor sqm 2,181.00 2,167.00 2,113.00 2,113.00 05.9 10 mm thick finished and laying thickness 12.5 mm coloured cast in situ mosaic work in walls with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) and necessary quantity of approved colouring materials including preparation of mix and laying the same on 12 mm thick cement sand (F.M. 1.2) plaster (1:4) to walls including pressing, curing at least for 7 days, cutting with pumice

MOSAIC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 89 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur Stone (No. 40, No. 80, No. 120) including finishing the corners and edges and also finishing with minar stone and supply of all necessary materials etc. and water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I) 05.9.1 With Indian chips In ground floor sqm 2,366.00 2,332.00 2,254.00 2,254.00 05.9.2 With Pakistani chips In ground floor sqm 2,400.00 2,366.00 2,288.00 2,288.00 05.10 200 mm x 200 mm x 20 mm mosaic terrazzo tiles flooring having 10 mm thick finished mosaic top with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in 9:1 proportion pressed on 12 mm thick cement sand (F.M. 1.2 and 2.5 by 50% each) mortar (1:2) base including preparing the base; finally, setting the tiles on 40 mm thick cement sand (F.M.1.2 and 2.5 by 50% each) mortar (1:3) including compacting, cutting with pumice stone (No. 40, No. 80, No. 120) and finishing the corners and edges and also finishing with minar stone including screening, washing mosaic chips and supply of all necessary materials etc. and water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I) 05.10.1 200 mm x 200 mm x 20 mm (finished) mosaic terrazzo tiles flooring with Indian chips In ground floor sqm 2,063.00 2,053.00 2,012.00 2,011.00 05.10.2 200 mm x 200 mm x 20 mm (finished) mosaic terrazzo tiles flooring with Pakistani chips In ground floor sqm 2,096.00 2,086.00 2,045.00 2,044.00 05.11 Added cost for mosaic and terrazzo tiles work above ground floor (Item no.: 5.1 to 5.10). sqm 19.00 18.00 17.00 17.00 ……………………. END OF CHAPTER FIVE …………………….

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 90 CHAPTER 06: TILES, MARBLE AND GRANITE STONE WORKS Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 06.1 Supplying, fitting and fixing country made GP (Gress Porcellanto) - glazed or unglazed homogeneous floor tiles complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.1.1 GP (homogeneous) 300 mm x 300 mm floor tiles sqm 1,385.00 1,377.00 1,350.00 1,350.00 06.1.2 GP (homogeneous) 400 mm x 400 mm floor tiles sqm 1,527.00 1,520.00 1,493.00 1,493.00 06.1.3 GP (homogeneous) 300 mm x 600 mm floor tiles sqm 1,655.00 1,648.00 1,621.00 1,621.00 06.1.4 GP (homogeneous) 600 mm x 600 mm floor tiles sqm 1,698.00 1,691.00 1,664.00 1,664.00 06.1.5 GP (homogeneous) 600 mm x 1200 mm floor tiles sqm 3,152.00 3,145.00 3,118.00 3,118.00 06.1.6 GP (homogeneous) 305 mm x 305 mm high traffic floor tiles sqm 1,484.00 1,477.00 1,450.00 1,450.00 06.2 Supplying, fitting and fixing country made mirror polished homogeneous floor tiles complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor 06.2.1 GP (mirror polished) 400 mm x 400 mm floor tiles sqm 1,698.00 1,691.00 1,664.00 1,664.00 06.2.2 GP (mirror polished) 500 mm x 500 mm floor tiles sqm 1,841.00 1,833.00 1,807.00 1,807.00 06.2.3 GP (mirror polished) 600 mm x 600 mm floor tiles sqm 2,026.00 2,019.00 1,992.00 1,992.00 06.2.4 GP (mirror polished) 800 mm x 800 mm floor tiles sqm 2,169.00 2,161.00 2,134.00 2,134.00 06.2.5 GP (mirror polished) 600 mm x 900 mm floor tiles sqm 2,439.00 2,432.00 2,405.00 2,405.00 06.2.6 GP (mirror polished) 600 mm x 1200 mm floor tiles sqm 2,881.00 2,874.00 2,847.00 2,847.00 06.2.7 GP Mirror Polished (Double Charge) 600 mm x 600 mm floor tiles sqm 2,254.00 2,247.00 2,220.00 2,220.00 06.2.8 GP Mirror Polished (Double Charge) 800 mm x 800 mm floor tiles sqm 2,753.00 2,746.00 2,719.00 2,719.00 06.3 Supplying, fitting and fixing country made homogeneous matt finished/ rustic floor tiles complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 91 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor 06.3.1 Matt or rustic floor tiles of size 400 mm x 400 mm and below sqm 1,769.00 1,762.00 1,735.00 1,735.00 06.3.2 Matt or rustic floor tiles of size 600 mm x 600 mm and below sqm 1,997.00 1,990.00 1,963.00 1,963.00 06.3.3 Matt or rustic floor tiles of size 800 mm x 800 mm and below sqm 2,454.00 2,446.00 2,419.00 2,419.00 06.4 Supplying, fitting and fixing foreign made polished porcelain/ mirror polished homogeneous floor tiles complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 35 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor 06.4.1 Polish porcelain/ mirror polished 600 mm x 600 mm floor tiles sqm 2,667.00 2,660.00 2,633.00 2,633.00 06.4.2 Polished porcelain/ mirror polished 800 mm x 800 mm floor tiles sqm 2,952.00 2,945.00 2,918.00 2,918.00 06.4.3 Polished porcelain/ mirror polished 600 mm x 1200 mm floor tiles sqm 4,805.00 4,798.00 4,771.00 4,771.00 06.4.4 Polished porcelain/ mirror polished 1000 mm x 1000 mm floor tiles sqm 6,231.00 6,223.00 6,197.00 6,197.00 06.4.5 Polished porcelain/ mirror polished 1200 mm x 1200 mm floor tiles sqm 7,656.00 7,649.00 7,622.00 7,622.00 06.5 Supplying, fitting and fixing foreign made homogeneous matt finished/ rustic floor tiles complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor 06.5.1 Matt or rustic floor tiles of size 600 mm x 600 mm sqm 3,095.00 3,088.00 3,061.00 3,061.00 06.5.2 Matt or rustic floor tiles of size 600 mm x 900 mm sqm 5,090.00 5,083.00 5,056.00 5,056.00 06.6 Supplying, fitting and fixing country made glazed wall tiles complying BDS ISO 13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2)

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 92 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including cost of water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.6.1 Wall tiles less than, equal or equivalent to 250 mm x 330 mm in sizes sqm 1,394.00 1,385.00 1,348.00 1,348.00 06.6.2 Wall tiles more than 250 mm x 330 mm & less than or equal to 250 mm x 400 mm in sizes sqm 1,636.00 1,627.00 1,590.00 1,590.00 06.6.3 Wall tiles more than 250 mm x 400 mm & less than or equal to 300 mm x 600 mm in sizes sqm 1,921.00 1,912.00 1,875.00 1,875.00 06.6.4 Wall tiles less than, equal or equivalent to 250 mm x 750 mm in sizes sqm 2,007.00 1,998.00 1,960.00 1,960.00 06.6.5 Decor wall tiles of any size sqm 2,178.00 2,169.00 2,131.00 2,131.00 06.6.6 Border wall tiles of any size sqm 4,558.00 4,549.00 4,512.00 4,512.00 06.7 Supplying, fitting and fixing country made rustic or matt finished wall tiles complying BDS ISO 13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.7.1 Matt or rustic wall tiles less than or equal to 300 mm x 600 mm size sqm 2,021.00 2,012.00 1,975.00 1,975.00 06.8 Supplying, fitting and fixing foreign made glazed wall tiles complying BDS ISO 13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.8.1 Glazed wall tiles 300 mm x 600 mm in sizes along with matching floor tiles, decor and border (if any) sqm 2,990.00 2,981.00 2,944.00 2,944.00 06.9 Supplying, fitting and fixing foreign made rustic or matt finished wall tiles complying BDS ISO 13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 93 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 06.9.1 Matt or rustic wall tiles 300 mm x 600 mm in sizes along with matching floor tiles, decor and border titles (if any) sqm 2,990.00 2,981.00 2,944.00 2,944.00 06.10 Supplying, fitting and fixing country made GP homogeneous stair tiles having non skidding offsets, complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor 06.10.1 Glazed stair tiles having size of width 250 mm to 300 mm and length 300 mm sqm 1,499.00 1,491.00 1,464.00 1,464.00 06.10.2 Glazed stair tiles having size of width 250 mm to 300 mm and length 325 mm to 600 mm sqm 1,912.00 1,905.00 1,878.00 1,878.00 06.10.3 Glazed stair tiles (Double Charge) having size of width 300 mm and length 600 mm sqm 2,468.00 2,461.00 2,434.00 2,434.00 06.11 Supplying, fitting and fixing country made rustic or matt finished stair tiles having non-skidding offsets complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.11.1 Rustic stair tiles of size 300 mm x 600 mm sqm 1,812.00 1,805.00 1,778.00 1,778.00 06.12 Supplying, fitting and fixing foreign made GP homogeneous stair tiles having non skidding offsets, complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor 06.12.1 Glazed stair tiles of size 300 mm x 600 mm sqm 2,097.00 2,090.00 2,063.00 2,063.00 06.13 Supplying, fitting and fixing foreign made rustic or matt finished stair tiles having non-skidding offsets complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc.

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 94 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.13.1 Rustic stair tiles of size 300 mm x 600 mm sqm 1,883.00 1,876.00 1,849.00 1,849.00 06.14 Supplying, fitting and fixing country made floor tiles complying BDS ISO 13006: 2015, water absorption ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with adhesives in full thickness of tiles, filler/tiles grout including cutting, shaping, placing in proper level etc. all complete and accepted by the Engineer in charge. In ground floor 06.14.1 GP glazed/ unglazed homogenous floor tiles (400 mm x 400 mm) sqm 1,633.00 1,627.00 1,596.00 1,596.00 06.14.2 GP glazed/ unglazed homogenous floor tiles (300 mm x 300 mm) sqm 1,491.00 1,484.00 1,453.00 1,453.00 06.14.3 GP Mirror Polished floor tiles (300 mm x 300 mm) sqm 1,562.00 1,556.00 1,524.00 1,524.00 06.14.4 GP Mirror Polished floor tiles (400 mm x 400 mm) sqm 1,804.00 1,798.00 1,767.00 1,767.00 06.14.5 GP Mirror Polished floor tiles (600 mm x 600 mm) sqm 2,132.00 2,126.00 2,094.00 2,094.00 06.14.6 GP Mirror Polished floor tiles (800 mm x 800 mm) sqm 2,275.00 2,268.00 2,237.00 2,237.00 06.14.7 GP Mirror Polished floor tiles (600 mm x 900 mm) sqm 2,545.00 2,539.00 2,508.00 2,508.00 06.14.8 GP Mirror Polished floor tiles (600 mm x 1200 mm) sqm 2,987.00 2,981.00 2,950.00 2,950.00 06.14.9 GP Mirror Polished (Double Charge) 600 mm x 600 mm floor tiles sqm 2,360.00 2,354.00 2,322.00 2,322.00 06.14.10 GP Mirror Polished (Double Charge) 800 mm x 800 mm floor tiles sqm 2,859.00 2,853.00 2,821.00 2,821.00 06.15 Supplying, fitting and fixing 20 mm to 25 mm thick machine made cement pavement tiles having minimum compressive strength of 27 MPa, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and making the joints carefully in true straight line including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.15.1 Pavement tiles of size 300 mm x 300 mm sqm 1,242.00 1,235.00 1,208.00 1,208.00 06.16 Supplying, fitting and fixing machine made clay roof tiles with ridge tiles on RCC inclined slab, irrespective of color &/or design, water absorption capacity <6% with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and making the joints carefully in true straight line including cutting, laying

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 95 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur and hire charge of machine and finishing with care etc. including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor 06.16.1 Roof tiles of size 100 mm x 200 mm or equivalent (red colour) sqm 3,067.00 3,056.00 3,005.00 3,005.00 06.16.2 Roof tiles of size 125 mm x 170 mm to 200 mm x 200 mm or equivalent (red colour) sqm 3,478.00 3,467.00 3,416.00 3,416.00 06.16.3 Roof tiles of size 160 mm x 268 mm or equivalent (red colour) sqm 3,196.00 3,186.00 3,135.00 3,135.00 06.16.4 Roof tiles of size 225 mm x 300 mm or larger (red colour) sqm 3,282.00 3,271.00 3,220.00 3,220.00 06.16.5 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (red colour) sqm 4,168.00 4,158.00 4,107.00 4,107.00 06.16.6 Roof tiles of size 100 mm x 200 mm or equivalent (beige colour) sqm 3,039.00 3,029.00 2,978.00 2,978.00 06.16.7 Roof tiles of size 125 mm x170 mm to 200 mm x 200 mm or equivalent (beige colour) sqm 3,610.00 3,599.00 3,548.00 3,548.00 06.16.8 Roof tiles of size 225 mm x 300 mm or larger (beige colour) sqm 3,538.00 3,528.00 3,477.00 3,477.00 06.16.9 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (beige colour) sqm 4,336.00 4,326.00 4,275.00 4,275.00 06.16.10 Roof tiles of size 125 mm x 170 mm to 200 mm x 200 mm or equivalent (grey or black colour) sqm 3,610.00 3,599.00 3,548.00 3,548.00 06.16.11 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (grey or black colour) sqm 4,707.00 4,696.00 4,646.00 4,646.00 06.17 Marble stone flooring with Indian standard quality (Bansowara/ Indian grey/ Indian pink or equivalent) marble stone of approved quality complying accepted National/ International standards, texture and size with 25 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting in position in proper level, filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges complete in all respect and accepted by the Engineer in charge. (Cement: CEM-II/B-M). 06.17.1 18 mm thick marble stone flooring In ground floor sqm 8,213.00 8,205.00 8,107.00 8,107.00 06.17.2 16 mm thick marble stone flooring In ground floor sqm 7,670.00 7,662.00 7,564.00 7,564.00

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 96 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 06.18 Marble stone flooring with Indian superior quality marble stone of approved quality complying accepted National/ International standards, texture and size with 25 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting in position in proper level, filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges complete in all respect and accepted by the Engineer in charge. (Cement: CEM-II/B-M) 06.18.1 18 mm thick marble stone flooring In ground floor sqm 8,892.00 8,884.00 8,786.00 8,786.00 06.18.2 16 mm thick marble stone flooring In ground floor sqm 7,806.00 7,798.00 7,700.00 7,700.00 06.19.1 Supplying and setting 12 mm thick Indian standard quality (Bansowara/ Indian grey/ Indian pink or equivalent) marble stone of approved quality complying accepted National/ International standards, texture and size on wall with 12 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including cutting and grinding the marble stone slab/tile, setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 7,111.00 7,103.00 7,005.00 7,005.00 06.19.2 Supplying and setting 12 mm thick Indian superior quality marble stone of approved quality complying accepted National/ International standards, texture and size on wall with 12 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including cutting and grinding the marble stone slab/tile, setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM- II/B-M) In ground floor sqm 7,518.00 7,510.00 7,413.00 7,412.00 06.20.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone of approved quality complying accepted National/ International standards, texture and size over 25 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including. placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting in position in proper level, filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor. sqm 10,793.00 10,784.00 10,687.00 10,686.00

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 97 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 06.20.2 Supplying and setting 12 mm thick Italian or equivalent quality marble stone on wall of approved quality complying accepted National/ International standards, texture and size on wall with 12 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including cutting and grinding the marble stone slab/tile, setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor Sqm 10,097.00 10,089.00 9,992.00 9,992.00 06.21 Labour cost for making moulding in marble stone as per architectural drawing including cutting, grinding, finishing, supplying necessary equipment etc. complete in all respect and accepted by the Engineer in Charge. (Cement: CEM-II/B-M). 06.21.1 18 mm thick marble stone meter 488.00 486.00 466.00 466.00 06.21.2 16 mm thick marble stone meter 483.00 481.00 461.00 461.00 06.21.3 12 mm thick marble stone meter 410.00 408.00 394.00 394.00 06.22 Granite stone flooring with 18mm thick Indian or equivalent granite stone of approved quality complying accepted National/ International standards, texture and size over 25 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including placing cement slurry below the stone, cutting the granite stone to desired size, grinding and finishing the edges, setting in position in proper level. filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 9,435.00 9,427.00 9,329.00 9,329.00 06.23 Granite stone flooring with 18mm thick Italian or equivalent origin granite stone of approved quality complying accepted National/ International standards, texture and size over 25 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including. placing cement slurry below the stone, cutting the granite stone to desired size, grinding and finishing the edges, setting in position in proper level, filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 10,793.00 10,784.00 10,687.00 10,686.00 06.24 Supplying and setting 12 mm thick Indian or equivalent granite stone of approved quality complying accepted National/ International standards, texture and size on wall sqm 7,382.00 7,375.00 7,277.00 7,277.00

TILES, MARBLE AND GRANITE STONE WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 98 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur with 12 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including cutting and grinding the granite stone slab, setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor 06.25 Supplying and setting 12 mm thick Italian or equivalent granite stone of approved quality complying accepted National/ International standards, texture and size on wall with 12 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including cutting and grinding the granite stone slab, setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor sqm 8,740.00 8,732.00 8,634.00 8,634.00 06.26 Kota stone flooring of approved quality complying accepted National/ International standards, texture and size with 25 mm thick cement sand (50% F.M. 1.2 and 50% F.M 2.2) mortar (1:2) including placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting in position in proper level, filling the gaps with white cement and colouring pigments including supplying all necessary equipments /materials and finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges complete in all respect and accepted by the Engineer in charge. (Cement: CEM-II/B-M) 14-22 mm thick Kota stone flooring In ground floor sqm 5,000.00 4,995.00 4,927.00 4,927.00 06.27 Added rate for each additional floor above ground floor for tiles works sqm 15.00 15.00 14.00 14.00 06.28 Added rate for each additional floor above ground floor for marble and granite stone works sqm 26.00 26.00 24.00 24.00 ……………………. END OF CHAPTER SIX …………………….

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 99 CHAPTER 07: REINFORCED CEMENT CONCRETE (RCC) WORKS Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with Brick Chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) 07.1 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). 07.1.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum 10577.00 10547.00 10319.00 10313.00 07.1.2 Pedestal, column, column capital, lift wall and wall up to ground floor cum 10946.00 10910.00 10660.00 10654.00 07.1.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and step etc. up to ground floor cum 10725.00 10692.00 10456.00 10450.00 07.1.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum 11316.00 11273.00 11001.00 10995.00 RCC WORKS: 1:2:4 (measured on gross concrete section) (f 'c = 22 MPa, minimum f 'cr = 30.5 MPa in nominal mix 1:2:4), with Stone Chips (100% Sand of F.M. 2.2) 07.2 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.40 and minimum f'cr= 30.5 MPa, satisfying a specified compressive strength f'c = 22 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 100 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur ASTM C-33 (Aggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering) 07.2.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum 14521.00 14691.00 13719.00 13323.00 07.2.2 Pedestals, column, column capital, lift wall and RCC wall up to ground floor cum 14890.00 15054.00 14060.00 13665.00 07.2.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor cum 14668.00 14836.00 13856.00 13460.00 07.2.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum 15259.00 15417.00 14401.00 14006.00 RCC WORKS: 1:1.5:3 (measured on gross concrete section) (f'c = 25MPa, minimum f'cr = 33.5 MPa in nominal mix 1 : 1.5 : 3), with Stone Chips (100% Sand of F.M. 2.2) 07.3 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.5:3 having maximum water cement ratio = 0.40 and minimum f'cr = 33.5 MPa, satisfying a specified compressive strength f’c = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper, fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering) 07.3.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum 15010.00 15173.00 14243.00 13866.00 07.3.2 Pedestals, column, column capital, lift wall and RCC wall up to ground floor cum 15380.00 15536.00 14584.00 14207.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 101 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 07.3.3 Floor/ roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor cum 15158.00 15318.00 14379.00 14002.00 07.3.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum 15749.00 15899.00 14925.00 14548.00 RCC WORKS : 1:1.25:2.5 (measured on gross concrete section) (f'c = 32 MPa, minimum f'cr = 40.5 MPa in nominal mix 1:1.25:2.5) with Stone Chips and Admixture (Type-G) (100% Sand of F.M. 2.2) 07.4 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.25:2.5 having maximum water cement ratio = 0.40 and minimum f'cr = 40.5 MPa, satisfying a specified compressive strength f'c = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/ BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, and adding approved high range water reducing admixture of complying specific type (generally be Type-G) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), including conducting necessary tests, screening sand through proper sieves, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering- shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). 07.4.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum 16126.00 16282.00 15384.00 15020.00 07.4.2 Pedestal, column, column capital, lift wall and RCC wall up to ground floor cum 16495.00 16645.00 15725.00 15361.00 07.4.3 Floor/ roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor cum 16274.00 16427.00 15520.00 15157.00 07.4.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum 16864.00 17008.00 16066.00 15702.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 102 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur RCC WORKS: 1:1:2 (measured on gross concrete section) (f'c = 40 MPa, minimum f'cr = 50 MPa in nominal mix 1 : 1 : 2) with Stone Chips and Admixture (Type-G) (100% Sand of F.M. 2.2) 07.5 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1:2 having minimum f'cr = 50 Mpa, satisfying a specified compressive strength f’c = 40 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1- CEM-I, 52.5N, and adding approved high range water reducing admixture of complying specific type (generally be Type-G) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete approved and accepted by the Engineer-in- charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering) 07.5.1 Individual & combined footing, pile cap, raft/mat and foundation beam up to plinth level cum 16790.00 16937.00 16081.00 15736.00 07.5.2 Pedestal, column, column capital, lift wall and RCC wall up to ground floor cum 17159.00 17300.00 16422.00 16077.00 Fair-Faced RCC WORKS: 1:1.5:3 (measured on gross concrete section) (f'c = 25 MPa, minimum f'cr = 33.5 MPa in nominal mix 1:1.5:3) (100% Sand of F.M. 2.2) 07.6 Cast-in-place fair-faced concrete works with f'cr=33.5 MPa and f'c=25 MPa at 28 days on standard cylinders by using 75% of OPC and 25% of white cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2, 20 mm down and well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification) at mix ratio of 1:1.5:3, adding coloring pigment admixture (satisfying ASTM C979) as per architectural design, conforming to the standard practice of code ACI / BNBC / ASTM including conducting necessary tests, screening sand and chips through proper sieves, washing, making and placing shutter in position maintaining true to plumb, making shutter water tight properly, placing reinforcement in position, including pouring of

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 103 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur concrete in form, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering) 07.6.1 For column, wall, beam, slab, drop wall, cornice etc. up to ground floor cum 18452.00 18597.00 17605.00 17228.00 RCC WORKS: batch mix/machine mix with approved mix design, well graded stone chips (100% Sand of F.M. 2.2) and required admixture 07.7.1 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 33.5 MPa, satisfying a specified compressive strength f’c = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-F under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water- tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 385 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 16192.00 16363.00 15471.00 15094.00 07.7.2 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 40.5 MPa, satisfying a specified compressive strength f’c =32 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical cum 16698.00 16863.00 16003.00 15639.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 104 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur admixture Type-F under ASTM C494 (Doses to be applied as per Manufacturer's Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water- tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 445 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. 07.7.3 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 50 MPa, satisfying a specified compressive strength f’c=40 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-F under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 500 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 17093.00 17250.00 16428.00 16081.00 07.7.4 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 60 MPa, satisfying a specified compressive strength f’c =50 MPa at 28 days on cum 19623.00 19780.00 18958.00 18610.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 105 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-F under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content (minimum 500 kg/ cum) and micro silica (minimum 25 kg/ cum) as per approved design mix, including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. RCC WORKS: from Ready-Mix Concrete plant with approved mix design, well graded stone chips (100% sand of F.M. 2.2) and required admixture 07.8.1 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 33.5 MPa, satisfying a specified compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in appendix), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water- tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 385 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering- shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in- charge. cum 15448.00 15619.00 14727.00 14350.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 106 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. 07.8.2 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 40.5 MPa, satisfying a specified compressive strength f’c = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 445 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 15954.00 16119.00 15259.00 14895.00 07.8.3 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 50 MPa, satisfying a specified compressive strength f’c = 40 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC /, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in technical specification), High- range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water- tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement cum 16349.00 16506.00 15684.00 15336.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 107 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur content as per approved design mix (minimum 500 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering- shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in- charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. 07.8.4 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 60 MPa, satisfying a specified compressive strength f’c = 50 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to BDS EN-197-1-CEM-I, 52.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content (minimum 500 kg/ cum) and micro silica (minimum 25 kg/ cum) as per approved design mix, carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 18878.00 19036.00 18213.00 17866.00 07.8.5 Reinforced cement concrete works for thick mat foundation from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 33.5 MPa, satisfying a specified compressive strength f’c =25 MPa at 28 days on standard cylinders as per standard cum 15236.00 15403.00 14530.00 14161.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 108 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur practice of Code ACI / BNBC, Cement conforming to CEM-II / B-M 42.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 400 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation: MAT) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. 07.8.6 Reinforced cement concrete works for thick mat foundation from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 40.5 MPa, satisfying a specified compressive strength f’c = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to CEM-II / B-M 42.5N, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 460 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. cum 15703.00 15864.00 15025.00 14670.00 (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering).

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 109 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur (Foundation: MAT) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. RCC WORKS : 1:1.25:2.5 (measured on gross concrete section) (f'c = 30 MPa, minimum f'cr = 38.5 MPa in nominal mix 1 : 1.25 : 2.5) with Stone Chips and Admixture (100% sand of F.M. 2.2) For Saline Zone 07.9 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.25:2.5 having minimum f'cr = 38.5 MPa, satisfying a specified compressive strength f’c = 30 MPa at 28 days on standard cylinders as per standard practice of Code ACI / BNBC, Cement conforming to CEM-II / B-M 42.5N, and adding approved high range water reducing admixture of complying specific type (generally be Type-G or F) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), including conducting necessary tests, screening sand through proper sieves, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes or in batching plant, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering- shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering) 07.9.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum 15901.00 16057.00 15159.00 14795.00 07.9.2 Pedestal, column, column capital, lift wall and RCC wall up to ground floor cum 16270.00 16420.00 15500.00 15137.00 07.9.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor cum 15669.00 15823.00 14916.00 14552.00 07.9.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum 16260.00 16404.00 15462.00 15098.00 07.10 Added rate for RCC works/fair-faced concrete works (materials, consumables and laying/placing concrete) in column, column capital, lift wall & wall, T- beam, L-beam, rectangular beams, floor / roof slab, cantilever slab, waffle slab and drop panels where the free height of the structure exceeds 4 meter (rate is considered for each additional meter height) cum 350.00 344.00 321.00 321.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 110 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 07.11.1 Added rate for RCC work/fair-faced work in additional floor: concrete cum 93.00 93.00 93.00 93.00 07.11.2 Added rate for RCC work in additional floor: concrete (concrete from batching or Ready-Mix Plant) 07.11.2.1 Add for each cum of concrete from 5th floor to 14th floor cum 19.00 19.00 19.00 19.00 07.11.2.2 Add for each cum of concrete above 15th floor cum 47.00 47.00 47.00 47.00 FORM WORK (Steel) 07.12 Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for : 07.12.1 Individual and combined footing sqm 598.00 595.00 584.00 584.00 07.12.2 In raft/mat/floor slab up to plinth level sqm 603.00 600.00 587.00 587.00 07.12.3 Foundation beam sqm 507.00 505.00 499.00 499.00 07.12.4 Pedestal, column, column capital, lift wall and wall up to ground floor sqm 537.00 535.00 531.00 531.00 07.12.5 Tie beam and lintel: ground floor sqm 558.00 556.00 550.00 550.00 07.12.6 T-beam, L-beam and rectangular beam etc. up to ground floor sqm 590.00 589.00 585.00 585.00 07.12.7 Floor and roof slab up to ground floor sqm 614.00 612.00 606.00 606.00 07.12.8 Cornice, railing, drop walls, louver, fins etc.: ground floor sqm 501.00 500.00 493.00 493.00 07.12.9 Sunshade, false ceiling: ground floor sqm 556.00 555.00 548.00 548.00 07.12.10 Stair case slab and steps up to ground floor sqm 567.00 566.00 561.00 561.00 07.12.11 Waffle or ribbed floor up to ground floor sqm 740.00 739.00 733.00 733.00 07.12.12.1 Arches, domes, vaults up to 8m span (for single use) sqm 2232.00 2231.00 2227.00 2227.00 07.12.12.2 Arches, domes, vaults up to 8 m span (for 2-times use) sqm 1563.00 1562.00 1559.00 1559.00 07.12.12.3 Arches, domes, vaults up to 8 m span (for 3-times use) sqm 1116.00 1116.00 1114.00 1114.00 07.12.12.4 Arches, domes, vaults up to 8 m span (for more than 3-times use) sqm 782.00 781.00 780.00 780.00 07.13 Added rate for arches, domes, vaults exceeding 8 m span sqm 558.00 558.00 557.00 557.00 07.14 Added rate for shuttering in circular work sqm 118.00 118.00 117.00 117.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 111 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 07.15 Added rate for additional height in centering, shuttering where ever required with adequate bracing, propping etc. over a height of 4.0 m, for every additional height of 1 meter or part thereof. sqm 59.00 59.00 58.00 58.00 07.16 Added rate for formwork/shuttering in additional floor sqm 18.00 18.00 17.00 17.00 07.17 Formwork for making ‘fair-faced’ surface of the concrete as per design, drawing and direction of Engineer-in-charge. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 10 BWG, angles of minimum size 50 mm x 50 mm x 6 mm, flat bars, formwork releasing agent etc.) sqm 1140.00 1139.00 1135.00 1135.00 FORMWORK (Wooden) for boundary wall, gate, centry post etc. 07.18 Centering and shuttering, including strutting, propping etc. and removal of form for: 07.18.1 Individual and combined footings sqm 537.00 535.00 516.00 516.00 07.18.2 Foundation beam sqm 489.00 487.00 471.00 471.00 07.18.3 Pedestals, column, wall sqm 541.00 540.00 522.00 522.00 07.18.4 Tie beam & lintels sqm 536.00 534.00 516.00 516.00 07.18.5 T-beam, L-beam and rectangular beam sqm 522.00 521.00 504.00 504.00 07.18.6 Floor & roof slab sqm 577.00 573.00 568.00 568.00 07.18.7 Cornice, railing, drop wall, louver, fins etc. sqm 472.00 471.00 458.00 458.00 07.18.8 Sunshade, false ceiling sqm 484.00 484.00 472.00 472.00 07.18.9 Stair case slab and steps sqm 470.00 470.00 457.00 457.00 07.19 Supply and use of specified type chemical admixture delivered from an authorized local agent or manufacturer, complying with the ASTM C-494 requirements; conforming the current compliance of the admixture to specification requirements like physical properties, uniformity and equivalence in composition etc.; performance (water content, fresh concrete setting time and compressive strength) requirements, delivered in sealed water-tight containers confirming plainly marked product name & type under this specification, net weight and /or volume, manufacturing and expiry date, non-aggressiveness to environment, aggregates and metals in concrete etc. and mixing the admixture in non pre-stressed cement concrete mixture in the field in accordance with manufacturers recommendation and instruction; providing safety provisions in all respects etc. all complete as per instruction and approved by the Engineer-in- charge. Dose (quantity in milli litres per 50 kg bag cement) and brand/origin/ manufacturer with respect to particular

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 112 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur brand of cement and particular stock of aggregates and method of use to be determined by mix design/ trial mix at the cost of contractor and approved by the Engineer. (Use of admixture is subjected to prior approval of design office) 07.19.1 Supply and use of water reducing chemical admixture in concrete, complying ASTM C-494 Type – A of approved brand/ origin/ manufacturer and supplied by only manufacturer's authorised dealer with certificate of origin. The admixture is to reduce quantity of mixing water required for normal workability and to maintain low water-cement (w/c) ratio, for improved concrete quality assurance. liter 210.00 210.00 209.00 209.00 07.19.2 Supply and use of retarding chemical admixture in concrete, complying ASTM C-494 Type - B of approved brand/ origin/ manufacturer and supplied by only manufacturer’s authorised dealer with certificate of origin. The admixture for retarding setting time of concrete, thereby reducing shrinkage in concrete specially for concrete laid in thick layers and intended delayed construction for improved construction joints, re-concreting etc. liter 214.00 214.00 214.00 214.00 07.19.3 Supply and use of accelerating chemical admixture in concrete, complying ASTM C-494 Type - C of approved brand/ origin/ manufacturer and supplied by only manufacturer's authorised dealer with certificate of origin. An admixture that is to accelerate the setting time and early strength gain of concrete. liter 151.00 151.00 151.00 151.00 07.19.4 Supply and use of water-reducing and retarding chemical admixture in concrete, complying ASTM C-494 Type - D of approved brand/ origin/ manufacturer and supplied by only manufacturer's authorised dealer with certificate of origin. The admixture to reduce the quantity of mixing water required to produce concrete of given consistency, i.e. low water-cement (w/c) ratio and intend to retard setting time of concrete, specially for layered, thick laid concrete etc. liter 277.00 277.00 277.00 277.00 07.19.5 Supply and use of water-reducing and accelerating chemical admixture in concrete, complying ASTM C-494 Type - E of approved brand/ origin/manufacturer and supplied by only manufacturer's authorised dealer with certificate of origin. The admixture to reduce the quantity of mixing water required to produce concrete of given consistency, i.e. low water-cement (w/c) ratio and intend to accelerate setting time of concrete, and early strength gain in concrete etc. liter 240.00 240.00 240.00 240.00 07.19.6 Supply and use of water-reducing high range chemical admixture in concrete, complying ASTM C-494 Type - F of approved brand/ origin/ manufacturer and supplied by only manufacturer's authorised dealer with certificate of origin. The admixture required to produce concrete of consistency by 12% or greater (flowing concrete) and for higher strength of concrete. liter 277.00 277.00 277.00 277.00 07.19.7 Supply and use of water-reducing high range and retarding chemical admixture in concrete, complying ASTM liter 208.00 208.00 208.00 208.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 113 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur C-494 Type - G of approved brand/origin/manufacturer and supplied by only manufacturer's authorised dealer with certificate of origin. The admixture required to produce concrete of consistency by 12% or greater (flowing concrete) and for higher strength of concrete and intend to retard setting time of concrete. 07.20 Supply and use of best quality pliable, cold applied pre- formed self-adhesive rubberized/ bituminous water proofing membrane of approved brand / origin / manufacturer from an authorized local agent or manufacturer having minimum thickness 1.5 mm, lined with 2 ply cross laminated high density polyethylene film performances and properties all conforming to ASTM standards and laying, placing, fixing on made up firm and dry surfaces free from hollows, sharp protrusions, contaminates etc. laid over-lap by at least 75 mm along the edges and 125 mm at ends ensuring good initial bond with the surfaces all complete under the strict accordance with the manufacturer recommendations and instructions providing all safety provisions in all respects and accepted by the Engineer. (supplied by only manufacturer's authorised dealer with certificate of origin) under following specification: Backing (HDPE) thickness : minimum 0.10mm Membrane thickness : minimum 1.40mm Total thickness : minimum 1.50mm Cold flexibility greater than (-)200C : ASTM D146 Pliability : "No crack" tested in ASTM D146 Tensile strength (film only) min 3.50 MPa (35000 KN/m2 ) testing in ASTM D882 Tensile strength (composite) at least 2.40 MPa or N/mm2 Elongation (composite) min 300% Cycling over crack at (-) 32°C No effect 100 cycles ASTM C836-89a Puncture resistance greater than 240N ASTM E 154-88 Resistance to hydrostatic head at least 50m ASTM D5385 Tear resistance min 4.0 MPa (N/mm2) Adhesion to primed concrete min 4.0 N/mm : ASTM D1000 Water vapor transmission Less than 0.10g/m2 per hour : ASTM E96 Water absorption in 24 hour Less than 0.33% ASTM D570 Heat stability (+) 90°C environmental compliance to conform: ASTM D543 07.20.1 Water-proofing membrane on external surface of primed vertical or inclined wall /on plastered and primed back-wall and concrete cast against membrane. (Excluding cost of back fill/brick wall on back/plaster when membrane laid on back- wall and concrete cast against membrane which to be paid as per corresponding items in this schedule) sqm 1115.00 1112.00 1099.00 1099.00 07.20.2 Water-proofing membrane on made up surface below the floor or below the horizontal surfaces with temporary protective cover using polystyrene/38 mm thick sand-cement mortar in 4:1 /or by equally effective alternative. (Rate is excluding the cost of protective cover which to be paid as per corresponding items in this schedule) sqm 920.00 918.00 910.00 910.00

REINFORCED CEMENT CONCRETE (RCC) WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 114 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 07.20.3 Water-proofing membrane on the floor or on the horizontal surfaces with permanent protective cover & wearing coarse. (Rate is excluding the cost of protective cover and wearing coarse which to be paid as per corresponding items in this schedule) sqm 956.00 954.00 947.00 947.00 07.21 Supply of polymer based curing compound as per ASTM C309 or BS 7542-1992 standard and apply by stirring & spraying with motorized sprayers over the surface of fresh concrete free from surface water and avoiding bleeding of concrete maintaining the spray nozzle approximately 450 mm away from the concrete surface with passed back and forth to ensure complete coverage confirming the pump pressure for fine spray and keeping the concrete surface undisturbed until it has sufficient strength to bear surface loads [The suitability of motorized sprayer should be ensured by an application trial] ensuring adequate ventilation to avoid inhalation of vapors and contact with skin and eyes all complete and accepted by Engineer-in-charge. sqm 224.00 221.00 211.00 211.00 07.22 Supply of epoxy bonding agent following ASTM C881/ C881M - 14 or any international acceptable standard and apply over the old concrete surface after making free of standing water, removal of dust, laitance, grease, curing compounds, impregnations, waxes and any other contaminants to achieve optimum bonding in between fresh and old concrete and accepted by the Engineer-in-charge. sqm 1118.00 1113.00 1098.00 1098.00 07.23 Supply of best quality corrosion inhibiting admixture on concrete surface following ASTM C1582 delivered from authorized local agent of the manufacturer in a sealed container and apply by a firm experienced in applying corrosion inhibiting admixture or workers trained and approved by manufacturer to wall and ceiling in 2 coats elapsing specified time for drying/ recoating including cleaning and sand papering making the surface free from loose and efflorescence, flaky materials, dirt, grease, wax, polish, scraping all chalked and scaled materials, applying the paint by brush/ spray following manufacturer's written instructions and necessary scaffolding etc. all complete and accepted by the Engineer-in-charge. sqm 48.00 48.00 46.00 46.00 07.24 Supplying, fitting and fixing of 0.45 mm thick foreign made celluloid paper for fair face form works to add extra smoothness in surface applying in shutter top with liquid glue etc of celluloid paper and other materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. all complete as per design, approved and accepted by the Engineer-in-charge. sqm 180.00 179.00 177.00 177.00 ……………………. END OF CHAPTER SEVEN …………………….

M.S. FABRICATION AND JOINTS IN RC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 115 CHAPTER 08: M.S. FABRICATION AND JOINTS IN RC WORKS Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 08.1 Supplying, fabrication and fixing to detail as per design : ribbed or deformed bar reinforcement (excluding laboratory test fees) for Reinforced concrete, produced and marked in accordance with BDS ISO 6935-2:2016 (or standard subsequently released from BSTI) including straightening and cleaning rust, if any, bending and binding in position with supply of G.I. wires, conducting necessary laboratory tests etc. (excluding splices or laps) complete in all respect and accepted by the Engineer-in-charge (Measurement shall be recorded only on standard mass per unit length of bars, while dia of bars exceeds its standard) 08.1.1 Grade 300 (B300DWR: complying BDS ISO 6935-2:2016 / ASTM A615) ribbed or deformed bar produced and marked according to Bangladesh standard, with minimum yield strength, fy (ReH)= 300 MPa but fy not exceeding 350 MPa and whatever is the actual yield strength within allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield strength fy, shall be at least 1.25 and minimum elongation after fracture and minimum total elongation at maximum force is 17% and 8% respectively : up to ground floor kg 113.00 113.00 112.00 112.00 08.1.2 Grade 400 (B400DWR / B420DWR: complying BDS ISO 6935-2:2016 / ASTM A615) ribbed or deformed bar produced and marked according to Bangladesh standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding 480 MPa and whatever is the actual yield strength within allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield strength fy, shall be at least 1.25 and minimum elongation after fracture and minimum total elongation at maximum force is 17% and 8% respectively : up to ground floor. kg 124.00 124.00 123.00 123.00 08.1.3 Grade 500 (B500DWR: complying BDS ISO 6935-2:2016 / ASTM A615) ribbed or deformed bar produced and marked according to Bangladesh standard, with minimum yield strength, fy (ReH)= 500 MPa and whatever is the yield strength within allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to actual yield strength fy, shall be at least 1.25 and minimum elongation after fracture and minimum total elongation at maximum force is 17% and 8% respectively : up to ground floor. (To be used for pile work, earth retaining wall, boundary wall, water reservoir & other structures as per instruction of concerned design DIVISION) kg 122.00 122.00 121.00 121.00 08.2 Added rate for M.S. Fabrication work in additional floor above ground floor kg 0.69 0.68 0.63 0.63 08.3 Supplying and fixing of upset forging parallel thread rebar Couplers (excluding laboratory test fees) conforming to ACI-318 on “Building Code Requirements for Structural Concrete” and ISO: 15835 on “Steels for the reinforcement of concrete — Reinforcement couplers for mechanical

M.S. FABRICATION AND JOINTS IN RC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 116 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur splices of bars” to ribbed or deformed bars of Grade 400 (B400DWR / B420DWR : complying BDS ISO 6935-2:2016), in splicing main rebars of structural members satisfying the condition that splice shall develop at least 1.25 times greater of yield strength (fy) than that of the connecting rebars in tension and compression including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer-in-Charge. Minimum 0.5% of the total coupled rebars are to be tested for quality assurance. 08.3.1 Thread Coupler for 20 mm diameter Bar each 328.00 328.00 324.00 324.00 08.3.2 Thread Coupler for 25 mm diameter Bar each 521.00 520.00 515.00 515.00 08.3.3 Thread Coupler for 32 mm diameter Bar each 748.00 747.00 740.00 740.00 08.4 Supplying and fixing of cold extrusion mechanical rebar Couplers (excluding laboratory test fees) conforming to ACI-318 on “Building Code Requirements for Structural Concrete” and ISO: 15835 on “Steels for the reinforcement of concrete — Reinforcement couplers for mechanical splices of bars” to ribbed or deformed bars of Grade 400 (B400DWR / B420DWR : conforming BDS ISO 6935- 2:2016), in splicing main rebars of structural members satisfying the condition that splice shall develop at least 1.25 times greater of yield strength (fy) than that of the connecting rebars in tension and compression including related operations as required to complete the works as per direction of Engineer-in-Charge. Minimum 1.0% of the total coupled rebars are to be tested for quality assurance. 08.4.1 Press Coupler for 16 mm diameter Bar (minimum Length: 100 mm, maximum Inner diameter: 21 mm, minimum Thickness: 4.5 mm) each 388.00 387.00 385.00 385.00 08.4.2 Press Coupler for 20 mm diameter Bar (minimum Length: 120 mm, maximum Inner diameter: 25 mm, minimum Thickness: 5.5 mm) each 536.00 535.00 531.00 531.00 08.4.3 Press Coupler for 22 mm diameter Bar (minimum Length: 132 mm, maximum Inner diameter: 28 mm, minimum Thickness: 6 mm) each 683.00 681.00 677.00 677.00 08.4.4 Press Coupler for 25 mm diameter Bar (minimum Length: 150 mm, maximum Inner diameter: 31 mm, minimum Thickness: 7 mm) each 879.00 877.00 872.00 872.00 08.4.5 Press Coupler for 32 mm diameter Bar (minimum Length: 192 mm, maximum Inner diameter: 38 mm, minimum Thickness: 9 mm) each 1483.00 1481.00 1476.00 1476.00 08.5 Installation of water stopper at movable and immovable RCC green joints as per following specification.

M.S. FABRICATION AND JOINTS IN RC WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 117 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 08.5.1 Supplying, fitting and fixing ribbed PVC water stopper with non centre bulb of width approx. 250 mm and approx. 9 mm thick for immovable (non-working) RCC joints, having minimum tensile strength of 8.27MPa (approx. 1200 psi) min ultimate elongation 350%, approximate hardness 50, minimum tear resistance 0.0175 kN/mm (100 lbs/inch) at RCC construction green joints in basements, approved and in consultation with design office, providing 38 mm x 62 mm wooden batten at the top and bottom of water stopper, holding in position and keeping the water stopper in true horizontal or vertical by appropriate means as where necessary etc. all complete and accepted by the Engineer- in-charge. meter 1053.00 1050.00 1025.00 1025.00 08.5.2 Supplying, fitting and fixing ribbed PVC water stopper with centre bulb of width approx. 250 mm and approx. 9 mm thick for immovable (non-working) RCC joints, having minimum tensile of strength 8.27 MPa (approx. 1200 psi) minimum ultimate elongation 350%, approximate hardness 50, minimum tear resistance 0.0175 KN/mm (100 lbs/inch) at RCC construction green joints in basements, approved and in consultation with design office, providing 38 mm x 62 mm wooden batten at the top and bottom of water stopper, holding in position and keeping the water stopper in true horizontal or vertical by appropriate means as where necessary etc. all complete and accepted by the Engineer- in-charge. meter 1140.00 1137.00 1111.00 1111.00 08.6 Supplying, fitting and fixing 250 mm wide 16 SWG Steel Sheet water stopper in RCC construction joint holding in position and keeping the water stopper in true horizontal or vertical by appropriate means as where necessary etc. all complete and accepted by the Engineer-in-charge. meter 385.00 384.00 380.00 380.00 08.7.1 Manufacturing, supplying, fitting and fixing Expansion Joint for gap up to 100mm with 125mmx50mmx6mm and 75mmx50mmx6mm galvanized MS angle and 8mm thick galvanized MS plate etc. all complete as per drawing, design and accepted by the Engineer-in-charge. meter 8092.00 8084.00 8041.00 8041.00 08.7.2 Manufacturing, supplying, fitting and fixing Expansion Joint for gap more than 100mm up to 150mm with 150mmx50mmx6mm and 100mmx50mmx6mm galvanized MS angle and 8mm thick galvanized MS plate etc. all complete as per drawing, design and accepted by the Engineer-in-charge. meter 9521.00 9513.00 9470.00 9470.00 08.7.3 Manufacturing, supplying, fitting and fixing Expansion Joint for gap more than 150mm up to 200mm with 175mmx50mmx6mm and 125mmx50mmx6mm galvanized MS angle and 8mm thick galvanized MS plate etc. all complete as per drawing, design and accepted by the Engineer-in-charge. meter 10951.00 10943.00 10899.00 10899.00 ……………………. END OF CHAPTER EIGHT …………………

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 118 CHAPTER 09: PILE WORKS AND PILE TEST Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 09.1 Boring/drilling by wash or percussion method for cast in situ pile up to the required depth and diameter with minimum 6 m long temporary steel casing, true to vertical, providing bentonite slurry and maintaining water level in the hole, washing the hole for at least 30 minutes, cleaning the bore hole and making the bore hole ready for placing steel cage and concreting including hire charge of rig set with winch machine, tripod stand, tremie pipe, cost of fuel, lubricant, mobilization, demobilization, maintenance, spares, stand- byes, insurance coverage, water, electricity and other charges all complete, approved and accepted by the Engineer-in-charge. Before commencing boring operation, contractor shall submit the method statement of cast-in-situ pile work including sequence of boring and casting, disposal of spoils to the Engineer-in-charge for approval. However, Engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. 09.1.1 400 mm dia meter 841.00 836.00 817.00 817.00 09.1.2 450 mm dia meter 1070.00 1062.00 1039.00 1039.00 09.1.3 500 mm dia meter 1255.00 1247.00 1219.00 1219.00 09.1.4 550 mm dia meter 1496.00 1486.00 1454.00 1454.00 09.1.5 600 mm dia meter 1725.00 1714.00 1677.00 1677.00 09.2 Auger Boring/Rotary drilling for cast in situ pile up to the required depth and diameter with minimum 6 m long temporary steel casing, true to vertical, providing bentonite slurry and maintaining water level in the hole, washing the hole for at least 30 minutes, cleaning the bore-hole and making the bore- hole ready for placing steel cage and concreting including hire charge of rig set , tremie pipe, cost of fuel, lubricant, mobilization, demobilization, maintenance, spares, stand-byes, insurance coverage, bentonite, water, electricity and other charges etc. complete approved and accepted by the Engineer-in-charge. Before commencing boring operation, contractor shall submit the method statement of cast-in-situ pile work including sequence of boring and casting, disposal of spoils to the Engineer-in- charge for approval. However, Engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. 09.2.1 600 mm dia meter 3974.00 3968.00 3950.00 3950.00 09.2.2 750 mm dia meter 4949.00 4943.00 4922.00 4922.00 09.2.3 1000 mm dia meter 7179.00 7170.00 7140.00 7140.00 09.3 Removing of spoils / mud accumulated during boring for cast in situ pile by wash boring from working site to a safe distance by contractor’s own arrangement i.e. with container cum 765.00 763.00 708.00 708.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 119 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur set in truck or on cart including loading, unloading everything complete as per standard practice and accepted by the Engineer-in-charge. (Quantity should be given three times of solid volume of boring) 09.4 Cast in situ pile with reinforced cement concrete works of high slump by adding high range water reducing admixture (ASTM C494 Type A or F) with minimum cement content relates to mix ratio 1:1.5:3 having minimum f'cr = 26 MPa, and satisfying a specified compressive strength f'c = 21 MPa at 28 days on standard cylinders as per standard practice of Code ACI/ BNBC & cement conforming to BDS EN-197-1- CEM -1, 52.5N, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M.2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33, including breaking chips, screening through proper sieves, making, placing re- bar cage in position, placing and removing tri-pod as per requirement, pouring the concrete in bore-hole with the help of a tremie pipe, maintaining the tremie pipe immersed in concrete by at least 1 meter throughout the period of concreting, maintaining required slump, etc. mixing the aggregates with standard mixer machine with hopper, casting in forms, all complete including water, electricity, testing of materials and concrete etc. and other charges as per design, drawing etc. all complete approved and accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding, placing and admixture (approx. doses 150 to 250 ml per bag of cement which is to be fixed upon consultation with design office) cum 17141.00 17310.00 16312.00 15912.00 09.5 Providing and making point welding at contact point of the spiral binders at reasonable intervals with the main reinforcements by electric arc welding for construction of cast in situ bored pile carefully with highly oxidized electrodes, making the points prominent and accepted by the Engineer- in-charge. (Rate is inclusive of all materials labour, tools and plants, electricity and all equipment). point 4.00 4.00 4.00 4.00 09.6 Providing and making welded splice over two sides of contact by welding of minimum 300 mm length at the lap of main reinforcement in rebar cage to be placed in bore-hole where necessary by electric arc welding with highly oxidized electrodes making the joint prominent all complete and accepted by the Engineer-in-charge. (Rate is inclusive of all materials labour, tools and plants, electricity and all equipment). meter of weld 496.00 496.00 496.00 496.00 09.7 Labour for breaking head of hardened cast in situ bored pile/ pre-cast pile up to a required length by any means but without damaging the rest and removing the dismantled materials such as concrete to a safe distance including scraps and cleaning concrete from steel/ M.S. rods, straightening and bending of pile bars, preparation and making platform where necessary, carrying, all sorts of handling, stacking the same properly after clearing, leveling and dressing the situ cum 3695.00 3616.00 3365.00 3365.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 120 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur and clearing the bed etc. complete in all respect and accepted by the Engineer-in-charge. (Measurement will be given for the actual pile head volume to be broken) 09.8 Conducting static load test as per ASTM D1143 or equivalent standard for the cast-in-situ/pre-cast pile providing required scaffolding, bracing, jacks, pressure test gauge, loading unloading, Kentledge and other plants and equipment including staging, mobilization, demobilization, hire charge, gunny bags, sand and filling sacs/gunny bags for loading, record readings and preparation of results in standard forms and other incidental charges as per standard practice and procedures including submission of load test report, furnishing all graph and chart etc. complete in all respect approved and accepted by the Engineer-in-charge (Minimum two cyclic loading; one at service load and another cycle at double the service load then to continue loading till failure of the pile). Before commencing load test, contractor shall submit method statement for conducting load test to the Engineer-in-charge for approval. However, Engineer’s approval shall not relieve the Contractor of his responsibilities and obligations under Contract. Load test and report shall be conducted under the supervision of a professional Geotechnical Engineer registered in BPERB or Geotechnical firm registered in PWD. Boring and pouring logs / driving logs of piles and method statement shall be the part of load test report. 09.8.1 Mobilization & de-mobilization of testing equipment per set per site 5801.00 5801.00 5297.00 5297.00 09.8.2 Calibration of pressure gauge per set per site 6810.00 6810.00 6810.00 6810.00 09.8.3 For 50 tonne load 09.8.3.1 For first test at one site for one testing set per test 92298.00 92053.00 90692.00 90692.00 09.8.3.2 For 2nd & additional tests at same site for same testing set per test 83068.00 82848.00 81623.00 81623.00 09.8.4 For 100 tonne load 09.8.4.1 For first test at one site for one testing set per test 153968.00 153755.00 151891.00 151891.00 09.8.4.2 For 2nd & additional tests at same site for same testing set per test 138571.00 138379.00 136702.00 136702.00 09.8.5 For 150 tonne load 09.8.5.1 For first test at one site for one testing set per test 214234.00 214078.00 211812.00 211812.00 09.8.5.2 For 2nd & additional tests at same site for same testing set per test 192810.00 192670.00 190631.00 190631.00 09.8.6 For 200 tonne load 09.8.6.1 For first test at one site for one testing set per test 276645.00 276497.00 273689.00 273689.00 09.8.6.2 For 2nd & additional tests at same site for same testing set per test 248981.00 248847.00 246320.00 246320.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 121 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 09.8.7 For 250 tonne load 09.8.7.1 For first test at one site for one testing set per test 339433.00 339342.00 336133.00 336133.00 09.8.7.2 For 2nd & additional tests at same site for same testing set per test 305490.00 305408.00 302519.00 302519.00 09.8.8 For 300 tonne load 09.8.8.1 For first test at one site for one testing set per test 401860.00 401776.00 398025.00 398025.00 09.8.8.2 For 2nd & additional tests at same site for same testing set per test 361674.00 361598.00 358222.00 358222.00 09.8.9 For 350 tonne load 09.8.9.1 For first test at one site for one testing set per test 462125.00 462099.00 457946.00 457946.00 09.8.9.2 For 2nd & additional tests at same site for same testing set per test 415913.00 415889.00 412151.00 412151.00 09.8.10 For 400 tonne load 09.8.10.1 For first test at one site for one testing set per test 522391.00 522422.00 517867.00 517867.00 09.8.10.2 For 2nd & additional tests at same site for same testing set per test 470152.00 470180.00 466080.00 466080.00 09.9 Rate for incremental loading 09.9.1 For intermediate loading from 50 tonne to 100 tonne for each additional tonne 09.9.1.1 For first test at one site for one testing set tonne 1233.00 1234.00 1224.00 1224.00 09.9.1.2 For 2nd & additional tests at same site for same testing set tonne 1110.00 1111.00 1102.00 1102.00 09.9.2 For intermediate loading from 100 tonne to 150 tonne for each additional tonne. 09.9.2.1 For first test at one site for one testing set tonne 1205.00 1206.00 1198.00 1198.00 09.9.2.2 For 2nd & additional tests at same site for same testing set tonne 1085.00 1086.00 1079.00 1079.00 09.9.3 For intermediate loading from 150 tonne to 200 tonne for each additional tonne. 09.9.3.1 For first test at one site for one testing set tonne 1248.00 1248.00 1238.00 1238.00 09.9.3.2 For 2nd & additional tests at same site for same testing set tonne 1123.00 1124.00 1114.00 1114.00 09.9.4 For intermediate loading from 200 tonne to 250 tonne for each additional tonne. 09.9.4.1 For first test at one site for one testing set tonne 1256.00 1257.00 1249.00 1249.00 09.9.4.2 For 2nd & additional tests at same site for same testing set tonne 1130.00 1131.00 1124.00 1124.00 09.9.5 For intermediate loading from 250 tonne to 300 tonne for each additional tonne. 09.9.5.1 For first test at one site for one testing set tonne 1249.00 1249.00 1238.00 1238.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 122 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 09.9.5.2 For 2nd & additional tests at same site for same testing set tonne 1124.00 1124.00 1114.00 1114.00 09.9.6 For intermediate loading from 300 tonne to 350 tonne for each additional tonne. 09.9.6.1 For first test at one site for one testing set tonne 1205.00 1206.00 1198.00 1198.00 09.9.6.2 For 2nd & additional tests at same site for same testing set tonne 1085.00 1086.00 1079.00 1079.00 09.9.7 For intermediate loading from 350 tonne to 400 tonne for each additional tonne. 09.9.7.1 For first test at one site for one testing set tonne 1205.00 1206.00 1198.00 1198.00 09.9.7.2 For 2nd & additional tests at same site for same testing set tonne 1085.00 1086.00 1079.00 1079.00 09.10 Pre-cast pile made in reinforced cement concrete with minimum cement content relates to mix ratio 1:1.25:2.5 having minimum f'cr = 38.5 Mpa, and satisfying specified compressive strength f’c = 30 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/ BNBC & cement conforming to BDS EN-197-1- CEM-I (52.5 N), best quality coarse sand (F.M.2.2), 20 mm down well graded crushed stone chips conforming to ASTM C-33, mixing in standard mixture machine and fed by standard measuring boxes, including all related works like screening through proper sieves, cleaning and washing, centering and placing reinforcement cages in position, casting, compacting by vibrators and tapered rods as where necessary, curing for 28 days etc. cost of water, electricity and other charges, providing fitting and fixing pile shoe in position, tools, plants & equipments, mobilization, demobilization, labour, test of materials and concrete etc. all complete as per design, drawing and accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing) cum 15583.00 15736.00 14829.00 14466.00 09.11 Cost of bed preparation including one layer brick flat soling with first class/picked jhama bricks including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge, Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing with cement (1:4) including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect and accepted by the Engineer-in- charge (Cement: CEM-II/B-M) and polythene as separator between pile layers during casting concrete. sqm 334.00 334.00 334.00 334.00 09.12 Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 18 BWG, angles of minimum size 1.5 x 1.5 x 3/16" for sides, angles of minimum size 1 x 1 x 3/16" for frames, 1.5" x 3/16" flat bars etc.) and removal of form for precast pile. (The formwork is considered for two sides and front shuttering of the pile) sqm 409.00 409.00 398.00 398.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 123 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 09.13 Pre-cast pile shoe making & supplying pre-fabricated frustum of square cone having four sides and a toe made of 6 mm thick ASTM A36 complied MS steel plate jointed by line welding, 4 nos 12 mm dia deformed MS bar jointed by line welding with MS plate along the four edges of shoe aligning the corner main bar of the pile and 1-12mm dia bar to fix with and perpendicular to shoe toe plate aligning centre of pile, including cutting, shaping, sizing of MS plate and bar, all complete as per design & drawing and accepted by the Engineer-in-charge each 3419.00 3387.00 3261.00 3261.00 09.14 Mobilization and demobilization of drop hammer type pre- cast pile driving rig. per set per site 12296.00 12283.00 11224.00 11224.00 09.15 Driving 250 mm x 250 mm size pre-cast pile with drop hammer type rig, and maintaining driving log in prescribed format Before commencing driving operation, contractor shall submit method statement for carrying out the driving operation including sequence of driving to the Engineer-in-charge for approval. However, Engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. meter 528.00 523.00 502.00 502.00 09.16 Driving 300 mm x 300 mm to 350 mm x 350 mm size pre- cast pile with drop hammer type rig, and maintaining driving log in prescribed format Before commencing driving operation, contractor shall submit method statement for carrying out the driving operation including sequence of driving to the Engineer-in-charge for approval. However, Engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. meter 840.00 831.00 799.00 799.00 09.17 Mobilization and demobilization of automatic diesel hammer mounted complete rig set. per set per site 191689.00 191689.00 191689.00 191689.00 09.18 Driving 250 mm x 250 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. meter 726.00 722.00 710.00 710.00 09.19 Driving 300 mm x 300 mm & 350 mm x 350 mm size pre- cast pile by rig fitted with automatic diesel operated hammer. Before commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. meter 939.00 935.00 919.00 919.00 09.20 Driving 400 mm x 400 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit method statement for carrying out the operation including sequence of driving to the meter 1064.00 1059.00 1041.00 1041.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 124 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur Engineer-in-charge for approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. 09.21 Driving 450 mm x 450 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations under contract. meter 1141.00 1135.00 1115.00 1115.00 09.22 Pre-cast driven micro-pile with reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.25:2.5 having minimum f'cr = 38.5 MPa, and satisfying a specified compressive strength f’c = 30 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC & cement conforming to BDS EN-197-1- CEM-I (32.5 to 52.5 N), best quality coarse sand (F.M.2.5) and 20 mm down well-graded crushed stone chips conforming to ASTM C-33, mixing in standard mixture machine with hopper and fed by standard measuring boxes, including cost of breaking chips, screening through proper sieves, cleaning and washing, centering and shuttering with M.S sheet, M.S angle, F.I bar, nuts and bolts, preparation of bed, laying polythene, placing of reinforcement cage, casting, compacting by vibrators and tapered rods, curing for 28 days etc. including cost of water, electricity and other charges as per standard practice or specified method providing head cushion, all equipments including mobilization, demobilization and hire charge of driving set, chamfering, test of materials and concrete etc. including carrying all complete approved and accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing) 09.22.1 Casting of 180 mm x 180 mm x 7.6 m Pile with reinforced cement concrete (1:1.25:2.5) with stone chips meter 642.00 646.00 615.00 603.00 09.22.2 Casting of 205 mm x 205 mm x 7.6 m Pile with reinforced cement concrete (1:1.25:2.5) with stone chips meter 803.00 809.00 768.00 754.00 09.22.3 Driving of 180 mm x 180 mm x 7.6 m pre-cast pile meter 223.00 221.00 213.00 213.00 09.22.4 Driving of 205 mm x 205 mm x 7.6 m pre-cast pile meter 268.00 265.00 255.00 255.00 09.22.5 Supply of Cold-Drawn Wire Pre-stressed Concrete (CWPC) micro-pile which is made by using cold drawn wire minimum cement content relates to mix ratio 1:1.5:3 cement conforming to BDS EN-197-1-CEM-1, 52.5N, having minimum f'cr = 35 MPa and satisfying specified compressive strength f'c= 30 MPa at 28 days best quality coarse sand (F.M. 2.2), 20 mm down well graded stone chips conforming to ASTM C-33, mixing in standard mixture machine and fed by standard measuring boxes, including cost of all kind of reinforcement BDS ISO 6935-2:2006 including strengthening and cleaning rust if any bending and binding in position with meter 1395.00 1387.00 1344.00 1338.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 125 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur supply of GI wires (24 BWG), centering and shuttering with M.S. sheet, M.S. angle, F.I. bar, nuts and bolts, preparation of bed, supplying & tensioning of cold drawn wire, laying polythene, placing of reinforcement cage in position, casting, compacting by vibrator and tapered rods, curing at least 28 days etc. including cost of water, electricity and other charges, proving pile shoe making with 20 BWG plane sheet, as per design and drawing including an equipments mobilization, demobilization chamfering edges if so including the cost of water electricity and other charges all complete as per design, drawing and accepted by the Engineer-in-charge. (Excluding the cost of carrying and driving of pile). Maximum length: Up to 7620 mm (fixed size x-section: 180 mm x 180 mm) 09.23 PIT (Pile integrity test) : Conducting low strain dynamic testing of pile as per ASTM D5882 - The standard method for low-strain integrity testing of pile by a qualified and approved PIT expert, preparing pile heads and providing all relevant materials, equipment, experts, labour, mobilization, demobilization, data acquisition and analysis, preparation of results in standard forms and compiling final report with recommendations on the tests etc. complete in all respect approved and accepted by the Engineer-in-charge. (Report shall contain driving log / boring and pouring logs, graphs & statement on "Calibration Pile" (pile that tested for its capacity and PIT done earlier on it, at a place of known soil profiles), soil investigation report. (Calibration pile shall be made and tested first). Method statement for conducting PIT shall be submitted to the Engineer for approval, and shall be the part of PIT report, However, Engineer's approval shall not relieve the contractor of his responsibilities and obligations under contract. 09.23.1 Mobilization and demobilization to site and PIT on12 (twelve) piles or less Up to 1st 12 piles 35311.00 35311.00 35311.00 35311.00 09.23.2 For PIT test of each additional pile after 12 (Twelve) pile tested at same site per pile 1513.00 1513.00 1513.00 1513.00 09.24 Pre-cast spliced pile jointing by supplying, fitting, fixing prefabricated square shaped two steel caps made up by 6 mm thick ASTM A36 complied M.S plate, sides formed by bent in channel shape to have only two line of joinery on faces, having min 50 mm dia hole on its web; capping by min 12 mm thick ASTM A36 complied M.S plate shaping the edges in 45°, having min 40 mm dia hole at centre to pass 25 mm M.S bar 433 mm in length; jointed at channels root by welding; caps fitted with 2 nos BDS ISO 6935-2009: B400 DWR complied d20 U-bar 1244mm in length by welding, equidistant from centre holes of cap and shall have min 75 mm clear from pile faces; and finally, the system to be fitted in correct alignments on pile head positions waiting for concreting; both the pile heads fitted with the steel caps to be welded together through v-notches in field, while one of the companion segment of piles drived in ground and other one placed over it maintaining true verticality; all complete as per

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 126 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur direction and stepwise approval leading to final approval of Engineer-in- charge. 09.24.1 X-sec of pre cast pile segments :300 mm x 300 mm each 11229.00 11210.00 11106.00 11093.00 09.24.2 X-sec of pre cast pile segments :350 mm x 350 mm each 12690.00 12671.00 12559.00 12546.00 09.24.3 X-sec of pre cast pile segments :400 mm x 400 mm each 14308.00 14289.00 14169.00 14156.00 09.24.4 X-sec of pre cast pile segments :450 mm x 450 mm each 14674.00 14656.00 14539.00 14526.00 09.25 Pile Driving by Hydraulic Static Pile Driver 09.25.1 Mobilization and demobilization of hydraulic static pile driver(Up to 320 metric ton capacity) per set per site 575067.00 575067.00 575067.00 575067.00 09.25.2 Mobilization and demobilization of hydraulic static pile driver(321 Metric Ton to 500 Metric Ton Capacity) per set per site 690080.00 690080.00 690080.00 690080.00 09.25.2.1 Driving pre-cast pile of 300 mm x 300 mm to 350 mm x 350 mm X-section made with shoe/ without shoe by Hydraulic static pile driver of up to 320 tonne (metric ton) capacity; arranged with necessary cranes, power source, maintaining driving log and record of pressure exerted on piles driven in to desired RL or capacity level ; complete in all respect including handling of piles, dressing & leveling of site, way making, surveying, layout setting etc. ended with the submission of pile driving report in three copies duly signed by professional engineer and approved by the Engineer-in- charge. meter 911.00 910.00 907.00 907.00 09.25.2.2 Driving pre-cast pile of 400 mm x 400 mm X-section made with shoe/ without shoe by hydraulic static pile driver of approx. 321 tonne to 500 tonne (metric ton) capacity; arranged with necessary cranes, power source, maintaining driving log and record of pressure exerted on piles driven in to desired RL or capacity level ; complete in all respect including handling of piles, dressing & leveling of site, way making, surveying, layout setting etc ended with the submission of pile driving report in three copies duly signed by professional engineer and approved by the Engineer-in- charge. meter 1024.00 1023.00 1020.00 1020.00 09.25.2.3 Driving pre-cast pile of 450 mm x 450 mm X-section made with shoe/ without shoe by hydraulic static pile driver of approx. 500 tonne (metric ton) capacity; arranged with necessary cranes, power source, maintaining driving log and record of pressure exerted on piles driven in to desired RL or capacity level ; complete in all respect including handling of piles, dressing & leveling of site, way making, surveying, layout setting etc ended with the submission of pile driving report in three copies duly signed by professional engineer and approved by the Engineer-in-charge. meter 1072.00 1071.00 1068.00 1068.00 09.26 Mobilization and demobilization of Crane (crawler) and crane mounted Vibratory Hammer complete rig set. per set per site 153351.00 153351.00 153351.00 153351.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 127 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 09.27 Supplying U-shape hot rolled steel sheet pile of specified sections having chemical composition Phosphorus = 0.04% (Maximum), Sulphur = 0.04% (Maximum), and mechanical properties Tensile strength=> 490 N/mm2, Yield strength => 296 N/mm2, Elongation = 15% (Minimum) (according to ASTM Standards), as specified by appropriate means to the construction site and stacking at proper place including loading, unloading, local handling as per specifications, including all taxes, freights, incidental charges etc. complete as per direction of the Engineer-in-charge. U-shape, hot-rolled steel sheet pile width = 400mm to 600mm: height => 100mm, length = 12.0m, Thickness >= 10.5mm, Thickness >= 13.0mm (±0.50mm), Thickness >= 15.5mm (±0.50mm), Thickness >= 17.0mm (±0.50mm) This rate excludes the cost of bed preparation. Sheet piles have to be unloaded on a firm flat base. (Salvage materials shall be the contractor’s property after completion of the work, rate is excluding the cost of driving and taking out). kg 56.00 56.00 56.00 56.00 09.28 Cutting (if necessary) charge of U-type Hot rolled steel sheet piles to design length and shape as per design and specification (thickness, length and mechanical properties) and instruction by all complete as per direction of the Engineer-in-charge. Each 383.00 383.00 367.00 367.00 09.29 Jointing steel sheet piles (if necessary) of different thickness by welding along width (both sides) and along collars (outside) (i.e. at 4 points) to increase the length of pile as per requirement including necessary modification of the ends to receive the weld, supply of welding materials, equipments and other accessories as per specification and direction of Engineer in charge. Each 509.00 507.00 490.00 490.00 09.30 Fabrication and construction of corner Joints in steel sheet piles including cutting, welding, shaping as per design and specification and as per requirement including supply of necessary welding materials, equipments and other accessories as per specification and direction of Engineer in charge. Each 232.00 232.00 227.00 227.00 09.31 Driving steel sheet piles 09.31.1 Driving steel sheet piles (up to 6.0m depth) of various sections and weights in any type of soil by mechanical device (Crawler Crane having 50 to 55 Ton capacity and Vibratory Hammer etc.) including handling and placing in position, supply of all materials and equipments related with driving of sheet piles, correcting leaning beyond tolerance and other defects etc. all complete as per direction of Engineer in charge (measurement will be taken on projected width x height). sqm 1140.00 1146.00 1140.00 1140.00 09.31.2 Driving steel sheet piles (beyond 6.0m up to 9.0m depth) of various sections and weights in any type of soil by mechanical device (Crawler Crane having 50 to 55 Ton capacity and Vibratory Hammer etc.) including handling and placing in position, supply of all materials and equipments sqm 1052.00 1057.00 1053.00 1053.00

PILE WORKS AND PILE TEST PWD SoR 2022 (2nd REVISED) for Civil Works 128 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur related with driving of sheet piles, correcting leaning beyond tolerance and other defects etc. all complete as per direction of Engineer in charge. (Measurement will be taken on projected width x height). 09.31.3 Driving steel sheet piles (beyond 9.0m up to 12.0m depth) of various sections and weights in any type of soil by mechanical device (Crawler Crane having 50 to 55 Ton capacity and Vibratory Hammer etc.) including handling and placing in position, supply of all materials and equipments related with driving of sheet piles, correcting leaning beyond tolerance and other defects etc. all complete as per direction of Engineer in charge. (Measurement will be taken on projected width x height). sqm 1026.00 1031.00 1026.00 1026.00 09.32 Lifting steel sheet piles 09.32.1 Lifting steel sheet piles (up to 6.0m depth) of any section and weights from any type of soil by mechanical device including supply of all equipments etc., handling and placing in stacks etc. all complete as per direction of Engineer in charge. (Measurement will be taken on projected width x height). sqm 934.00 943.00 935.00 935.00 09.32.2 Lifting steel sheet piles (beyond 6.0m up to 9.0m depth) of any section and weights from any type of soil by mechanical device including supply of all equipments etc., handling and placing in stacks etc. all complete as per direction of Engineer in charge. (Measurement will be taken on projected width x height). sqm 969.00 977.00 970.00 970.00 09.32.3 Lifting steel sheet piles (beyond 9.0m up to 12.0m depth) of any section and weights from any type of soil by mechanical device including supply of all equipments etc., handling and placing in stacks etc. all complete as per direction of Engineer in charge (measurement will be taken on projected width x height). sqm 1090.00 1100.00 1091.00 1091.00 09.33 Mobilization & demobilization of joist driving rig per set per site 9736.00 9736.00 9736.00 9736.00 09.34 Driving joist (up to 6.5m depth) of any sections and weights in any type of soil by mechanical device including handling and placing in position, supply of all materials and equipments related with driving of sheet piles, correcting leaning beyond tolerance and other defects etc. all complete as per direction of Engineer in charge (measurement will be taken on meter). meter 412.00 407.00 394.00 394.00 ……………………. END OF CHAPTER NINE …………………

STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY PWD SoR 2022 (2nd REVISED) for Civil Works 129 CHAPTER 10: STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 10.1 Supply and fixing of galvanized anchor bolts of variable dia for rigid frame conforming to ASTM F1554 Grade 55, Galvanized to A153, Class C or equivalent with minimum yield strength of 380 MPa, manual of steel construction by American Institute of Steel Construction (AISC) etc. including the cost of washer & bolts, material testing etc. all complete as per drawing, specification and direction of the Engineer- in-charge. kg 197.00 197.00 197.00 197.00 10.2 Supply, fabrication and installation of built-up sections i.e. columns, beams, rafters, bracings, struts etc. (up to level-4) from steel plates conforming to ASTM A572, with a minimum yield strength of 345 MPa, including the cost of testing of plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of Engineer-in- charge. kg 141.00 141.00 141.00 141.00 10.3 Supply, fabrication and installation of built-up sections i.e. columns, beams, rafters, bracings, struts etc. (up to level-4) from steel plates conforming to ASTM A36, with a minimum yield strength of 250 MPa, including the cost of testing of plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of Engineer-in- charge. kg 137.00 137.00 137.00 137.00 10.4 Supply, fabrication and installation of hot-rolled sections (W, H, I-shape etc.) for columns, beams, rafters, bracings etc. (up to level-4) conforming to ASTM A36, with a minimum yield strength of 250 MPa, including the cost of testing of plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of Engineer-in- charge. kg 135.00 135.00 135.00 135.00 10.5 Supply, fabrication and installation of hot rolled structural grade steel pipe and tube of any thickness conforming to ASTM A283 with a minimum yield strength of 275 MPa, including the cost of testing, application of red/grey-oxide primer etc. (up to level-4) all complete as per drawing, specification and direction of Engineer-in-charge. kg 206.00 206.00 206.00 206.00 10.6 Supply, fabrication and installation of hot rolled structural grade steel channel and angle in roof truss or any form of structure of any thickness conforming to ASTM A36 with a minimum yield strength of 250 MPa, including the cost of testing, application of red/grey-oxide primer etc. (up to level- 4) all complete as per drawing, specification and direction of Engineer-in-charge. kg 132.00 132.00 132.00 132.00 10.7 Supply and fabrication of built-up sections for shore piles from steel plates conforming to ASTM A36, with a minimum yield strength of 250 MPa, including the cost of testing of plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of Engineer-in- charge. kg 70.00 70.00 70.00 70.00

STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY PWD SoR 2022 (2nd REVISED) for Civil Works 130 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur (Salvage materials shall be the contractors property after completion of the work, rate is excluding the cost of driving and taking out). 10.8 Supply and fabrication of hot rolled structural grade steel Sections of any thickness conforming to ASTM A36 with a minimum yield strength of 250 MPa for shore piling, including the cost of testing, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of Engineer-in-charge. (Salvage materials shall be the contractors property after completion of work, rate is excluding the cost of driving and taking out). kg 54.00 54.00 54.00 54.00 10.9 Supply, fabrication, installation and de-installation of built- up sections for shore pile bracing at any level basement work from steel plates conforming to ASTM A36, with a minimum yield strength of 250 MPa, including the cost of testing of plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of Engineer-in-charge. (Salvage materials shall be the contractors property after completion of work). kg 90.00 90.00 90.00 90.00 10.10 Supply, fabrication, installation and de-installation of built- up sections for shore pile bracing at any level basement work from steel plates conforming to ASTM A572, with a minimum yield strength of 345 MPa, including the cost of testing of plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of Engineer-in-charge. (Salvage materials shall be the contractors property after completion of work). kg 92.00 92.00 92.00 92.00 10.11 Supply and fixing of connection bolts of variable diameter with nut and washer according to "ASTM A325 Type 1 or equivalent” with Fu =720 MPa, including the cost of testing of bolts, all complete as per drawing, specification and direction of Engineer-In-Charge. kg 371.00 371.00 371.00 371.00 10.12 Supply and fixing of connection bolts of variable diameter with nut and washer according to "ASTM A307 Type A or equivalent” with Fu =414 MPa, including the cost of testing of bolts, all complete as per drawing, specification and direction of Engineer-In-Charge. kg 333.00 333.00 333.00 333.00 10.13 Supply and installation of GI purlin & girt of any size (up to level-4) conforming to "ASTM A653" grade 45, with a minimum yield strength of 310 MPa, including the cost of testing of materials, all complete as per drawing, specification and direction of Engineer-in-charge. kg 169.00 168.00 169.00 169.00 10.14 Supply and fixing of sag rod (up to level-4) conforming to grade 40, with a minimum yield strength of 275 MPa, including the cost of making threads, nuts and washers, red oxide primer etc. all complete as per drawing, specification and direction of Engineer-in-charge. kg 162.00 162.00 162.00 162.00

STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY PWD SoR 2022 (2nd REVISED) for Civil Works 131 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 10.15 Supply and fixing of cable/wire bracing conforming to "ASTM A475" with a minimum yield strength of 1193 MPa, with I-bolt and hill side washer, all complete as per drawing, specification and direction of Engineer-in-charge. meter 229.00 229.00 229.00 229.00 10.16 Supplying and fixing of shear stud of variable dia conforming to ASTM A108 or equivalent with minimum yield strength of 275 MPa, including the cost testing, welding etc. all complete as per drawing, specification and direction of Engineer-in- charge. kg 174.00 174.00 174.00 174.00 10.17 Supply and installation of 0.70 mm thick galvanized decking panel according to ASTM A653, with minimum yield strength of 345 MPa, including all necessary accessories (sheeting screws with washers, sealants etc.), testing of materials etc. all complete as per drawing, specification and direction of Engineer-in-charge. kg 191.00 191.00 191.00 191.00 10.18 Supply, fabrication and installation of 6 mm thick Chequer Plate conforming to ASTM A572, with minimum yield strength of 345 MPa (up to level-4), including all necessary accessories, testing of materials etc. all complete as per drawing, specification and direction of Engineer-in-charge. kg 201.00 201.00 201.00 201.00 10.19 Supply and installation of 0.47 mm thick zinc alum color coated profile sheet from local source/China with minimum warranty period of 5 years after installation for roof, wall, caping, flashing, trimming, gutter etc. (up to level-4) conforming to ASTM A792, Grade: 80, AZM150 gm/m2, including the cost of necessary accessories (sheeting screws with washers, silicon sealant etc.), testing of materials etc. all complete as per drawing specification and direction of Engineer-in-charge. kg 205.00 205.00 205.00 205.00 10.20 Supply and installation of 0.47 mm thick zinc alum color coated profile sheet of durability class 2 with minimum warranty period of 10 years of durability, for roof, wall, caping, flashing, trimming, gutter etc. conforming to ASTM A792, Grade: 80, AZM150 gm/m2, including the cost of necessary accessories (sheeting screws with washers, silicon sealant etc.), testing of materials etc. all complete as per drawing specification and direction of Engineer-in-charge (supplier has to produce papers to proof the source of material). kg 331.00 331.00 331.00 331.00 10.21 Supply and installation of 0.457 mm thick corrugated galvanized iron sheet (Bangladesh made) having min weight 63-65 kg per bundle (2'-6" width, 70 – 72 rft long) fitted and fixed on M.S. sections with 'J' hook or wooden purlin with screws, limpet washers and putty etc. (up to level-4) all complete and accepted by the Engineer-in-charge. sqm 594.00 593.00 585.00 585.00 10.22 0.27 mm thick galvanized iron plain sheet ridging with 300 mm lap on either side fitted and fixed with galvanized bolts and nuts etc. all complete and accepted by the Engineer-in- charge. 10.22.1 Galvanized meter 485.00 484.00 472.00 472.00

STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY PWD SoR 2022 (2nd REVISED) for Civil Works 132 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 10.22.2 Colored meter 538.00 536.00 524.00 524.00 10.23 Supply and installation of 2.0 mm thick fiber glass sheet (transparent sheet) for roof, wall etc. on M.S. purlin, angle etc. with 'J' hook or screws with washer and putty, all complete as per drawing, specification and direction of Engineer-in-charge (up to level-4). sqm 1477.00 1476.00 1467.00 1467.00 10.24 1.5 mm thick plain fiberglass sheet ridging with 300 mm lap on either side fitted and fixed with galvanized bolts and nuts etc. all complete and accepted by the Engineer-in- charge. meter 900.00 898.00 886.00 886.00 10.25 Supply and installation of double bubble foil insulation at wall and roof of nominal thickness of 8 mm conforming to Class A in accordance with the ASTM-E84-09 fire test standard, including the cost of lapping, Scotch tape, adhesive and necessary accessories, all complete as per drawing, specification and direction of Engineer-in-charge. sqm 258.00 258.00 258.00 258.00 10.26 Premium Synthetic Enamel paint of approved best quality and colour delivered from authorized local agent of the manufacturer (Berger robbialac supergloss synthetic enamel/ Elite lucky seven/ Asian apcolipe premium paint or equivalent brand) in a sealed container, having highly water resistant, high bondibilty, flexibility property; using specified brand thinner applying to metallic surface by spray in two coats over single coat anti-corrosive coating including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, all complete in all floors accepted by the Engineer-in-charge. (payment shall be made on structural steel weight basis) kg 10.00 10.00 10.00 10.00 10.27 Supply and application of Epoxy based corrosion protection paint to the surface of the structural steel members conforming to SA 2.5; the corrosion class shall be C3 in accordance with BS EN ISO 12944-2 and durability class in accordance with BS EN ISO 12944-5; the Steel members to be shot blasted inside the enclosed shot blasting chamber, final coat paint must be applied on site after installation, including the cost of primer, testing and necessary accessories, all complete as per drawing, specification and direction of Engineer-in-charge. kg 27.00 27.00 27.00 27.00 10.28 Supply and pouring of non-shrink grout to steel column bases conforming to ASTM C109 having compressive strength not less than 45 MPa, including the cost of shutter and necessary accessories, all complete as per drawing, specification and direction of Engineer-in-charge. cum 151667.00 151667.00 151667.00 151667.00 10.29 Safety Canopy: Supplying temporary safety canopy around construction work place where public safety is likely to be endangered due to construction activities; which shall be made of truss system of steel sections (main frame) at 1800 mm c/c with purlins @ 750 mm c/c, making flooring system by corrugated galvanized iron sheets of thickness 0.45 mm, laying wire mesh net on iron sheets, providing continuous gutter along the edges of the building with downpipe @ 6000 sqm 2496.00 2492.00 2474.00 2474.00

STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY PWD SoR 2022 (2nd REVISED) for Civil Works 133 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur mm c/c, including fitting and fixing in position providing necessary anchors, cables, wires, ties etc. by standard anchoring and welding, nut-bolts etc. all complete and accepted by the Engineer-in-charge. 10.30 Safety net with G.I Wire: Supply, fabrication, installation and taking out temporary horizontal safety net around construction work place where public safety is likely to be endangered due to construction activities; which shall be made of Chain link net with 24 BWG wire fitted at 15'-0'' height horizontally of the outer periphery of the building with 75 mm x 40 mm x 5 mm MS Chanel post and purlin, 20 mm MS Rod and 40 mm x 40 mm x 6 mm MS Angle as ties etc. by standard anchoring and welding, nut-bolts etc. all complete and accepted by the Engineer-in-charge. (Salvage materials shall be the contractors property after completion of work.) sqm 1598.00 1584.00 1564.00 1564.00 10.31 Safety shed over drive way: Supply, fabrication, installation and taking out temporary horizontal safety shed over the drive way around construction work place where public safety is likely to be endangered due to construction activities; which shall be made of 0.27 mm thick galvanized iron plain sheet fitted at 15'-0'' height horizontally over the drive way or path way at the outer periphery of the building with 75 mm x 40 mm x 5 mm M.S Chanel post and purlin,20 mm MS Rod and 40 mm x 40 mm x 6 mm MS Angle as ties etc. by standard anchoring and welding, nut-bolts etc. all complete and accepted by the Engineer-in-charge. (Salvage materials shall be the contractors property after completion of work.) sqm 1724.00 1717.00 1688.00 1688.00 10.32 Scaffolding for outside netting of building: Supplying, fitting & fixing scaffolding for outside netting of building with single layer 38 mm dia MS pipe connected each other with minimum 4'-0" centre to centre both direction with 38 mm dia swivel clamp, including fitting and fixing in position providing necessary anchors, wires, ties etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of netting) sqm 357.00 357.00 357.00 357.00 10.33 Safety net: Supplying temporary safety net (hessian cloth) around construction work place (along the height of the building) where public safety is likely to be endangered due to construction activities; which shall be supported using scaffolding around the building for brick work/ plaster; including fitting and fixing in position providing necessary anchors, wires, ties etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of scaffolding) sqm 52.00 52.00 52.00 52.00 10.34 Supply, fabrication, installation and taking out of 1.2 m height temporary safety fencing at different floor during construction work around the outer periphery of building or around the punch in the floor slab for safety of the worker during construction, which shall be made of 10 mm dia MS Rod @ 450 mm c/c both way welded at each point together with a 12 mm Dia MS Rod as top rail drilled anchored to the sqm 437.00 437.00 437.00 437.00

STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY PWD SoR 2022 (2nd REVISED) for Civil Works 134 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur floor and sides as necessary all complete and accepted by the Engineer-in-charge. (Salvage materials shall be the contractors property after completion of work.) 10.35 Providing bearing joints fixed or free with 250 mm x 375 mm x 10 mm M.S. (Grade - A36) plate fitted in the truss angles with 16 mm diameter M.S. rod counter sunk rivets, welded and anchored to 250 x 375 x 10 mm. M.S. plate by two Nos. 19 mm dia M.S. “U” rod embedded in the bed of the lintel around the reinforcement, cleaning and greasing the joints for all floors etc. all complete and accepted by the Engineer- in-charge. each 3140.00 3132.00 3101.00 3101.00 10.36 Galvanization: Galvanization of finished structural steel built-up and hot rolled finished materials of any shape and size (average thickness not more than 8 mm) conforming to the requirement of the corrosion class C3 and Galvanization shall be performed in accordance with ASTM A123 all complete as per drawing, specification and direction of Engineer-in-charge. kg 73.00 73.00 73.00 73.00 10.37 Additional Erection and installation charge for items 10.2~10.6 and 10.18 shall be 2% of the gross item rate for every four floor above level-4 ……………………. END OF CHAPTER TEN …………………

WOOD/ METAL WORKS IN DOOR AND WINDOW FRAME, ROOF TRUSS AND HAND RAIL PWD SoR 2022 (2nd REVISED) for Civil Works 135 CHAPTER 11: WOOD/ METAL WORKS IN DOOR AND WINDOW FRAME, ROOF TRUSS AND HAND RAIL Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 11.1 Supplying and making door and window frames (Chowkat) for all floors including wall side grove cutting, moulding by CNC machine or any other means with matured seasoned wood of required size including painting two coats of coal tar to the surface in contact with wall, fitting and fixing in position etc. all complete and accepted by the Engineer-in-charge. (All sizes of wood are finished). 11.1.1 Frame made from seasoned Mehgoni wood (Chemically treated) 11.1.1.1 Up to Size 0'-2.5" x 0'-6" (finished) cum 139274.00 138902.00 136637.00 136637.00 11.1.1.2 Size greater than 0'-2.5" x 0'-6" and up to 0'-2.5" x 0'-11" (finished) cum 121302.00 121096.00 119817.00 119817.00 11.1.2 Frame made from seasoned Garjan/ Jam/Local Sal Wood 11.1.2.1 Up to Size 0'-2.5" x 0'-6" (finished) cum 149665.00 144098.00 149626.00 149626.00 11.1.2.2 Size greater than 0'-2.5" x 0'-6" and up to 0'-2.5" x 0'-11" (finished) cum 131382.00 126136.00 132418.00 132418.00 11.1.3 Frame made from seasoned Chattogram Silkarai/ Azobe/ Okan Loha Kath 11.1.3.1 Up to Size 0'-2.5" x 0'-6" (finished) cum 165253.00 164882.00 162616.00 162616.00 11.1.3.2 Size greater than 0'-2.5" x 0'-6" and up to 0'-2.5" x 0'-11" (finished) cum 146503.00 146297.00 145019.00 145019.00 11.1.4 Frame made from seasoned Local Manjuree/ Jarul 11.1.4.1 Up to Size 0'-2.5" x 0'-6" (finished) cum 227603.00 222036.00 227565.00 227565.00 11.1.4.2 Size greater than 0'-2.5" x 0'-6" and up to 0'-2.5" x 0'-11" (finished) cum 206985.00 201739.00 208021.00 208021.00 11.1.5 Frame made from seasoned Chattogram Teak 11.1.5.1 Up to Size 0'-2.5" x 0'-6" (finished) cum 263975.00 258408.00 271678.00 271678.00 11.1.5.2 Size greater than 0'-2.5" x 0'-6" and up to 0'-2.5" x 0'-11" (finished) cum 242267.00 237020.00 250812.00 250812.00 11.1.6 Frame made from seasoned Myanmar (Burma) Teak 11.1.6.1 Up to Size 0'-2.5" x 0'-6" (finished) cum 404263.00 398696.00 406823.00 406823.00 11.1.6.2 Size greater than 0'-2.5" x 0'-6" and up to 0'-2.5" x 0'-11" (finished) cum 378351.00 373105.00 381907.00 381907.00

WOOD/ METAL WORKS IN DOOR AND WINDOW FRAME, ROOF TRUSS AND HAND RAIL PWD SoR 2022 (2nd REVISED) for Civil Works 136 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 11.1.7 Frame made from seasoned Jessore & Other Local Teak 11.1.7.1 Up to Size 0'-2.5" x 0'-6" (finished) cum 191232.00 190861.00 188596.00 188596.00 11.1.7.2 Size greater than 0'-2.5" x 0'-6" and up to 0'-2.5" x 0'-11" (finished) cum 171704.00 171498.00 170219.00 170219.00 11.2.1 Supplying, fitting and fixing M.S. flat bar clamp of 225 mm x 38 mm x 6 mm size having bifurcated ends to door and window frames with necessary screws including cutting grooves in chowkat if necessary and encasing inside the wall with cement concrete (1:2:4) etc. all complete and accepted by the Engineer-in-charge. each 131.00 130.00 125.00 125.00 11.2.2 Supplying, fitting and fixing M.S. flat bar clamp of 150 mm x 38 mm x 6 mm size having bifurcated ends to door and window frames with necessary rowel plug, screws etc. including cutting grooves in chowkat if necessary etc. all complete and accepted by the Engineer-in-charge. each 135.00 134.00 129.00 129.00 11.3.1 Supplying, fitting and fixing double leaf metal door frame for all floors made with 38mm x 38 mm x 6 mm M.S. angle fitted with 150 mm long 6 nos. iron clamps of same size M.S. angle (with one end bifurcated) with the vertical members of the frame, fixing the frame in wall with cement concrete (1:2:4), mending good the damages, fixing 6 Nos. of 100 mm long iron hinges with the vertical members of the frame all complete including making holes in walls, cutting, sizing, welding, fabricating, carrying from work-shop to site and local carriage, curing etc. all complete as per plan and drawing and accepted by the Engineer-in-charge. meter 756.00 755.00 745.00 745.00 11.3.2 Supplying, fitting and fixing single leaf metal door frame for all floors made with 38 mm x 38 mm x 6 mm M.S. angle, fixing 125 mm long 6 nos. iron clamps of same size (with one end bifurcated) with the vertical members of the frame, fixing the frame in wall with cement concrete (1:2:4), mending good the damages, fixing 4 nos. 100 mm size iron hinges with the vertical members of the frame, all complete including making holes in walls, cutting, sizing, welding, fabricating, carriage from workshop to site including local carriage, curing etc. as per plan and drawing etc. all complete and accepted by the Engineer-in–charge. meter 732.00 731.00 720.00 720.00 11.4 Supplying matured seasoned wood and making roof truss of any size with wall plates as per design including supplying, fabricating and hoisting, scaffolding, fitting and fixing in position with bolts, nuts, painting two coats of coal tar etc. all complete and accepted by the Engineer-in– charge. (All sizes of wood are finished). 11.4.1 Garjan / Jam/ Local Sal wood cum 129035.00 124247.00 130135.00 130135.00 11.4.2 Mehgoni cum 119682.00 119571.00 118444.00 118444.00 11.4.3 Silkarai /Chickrashi cum 143064.00 142952.00 141825.00 141825.00

WOOD/ METAL WORKS IN DOOR AND WINDOW FRAME, ROOF TRUSS AND HAND RAIL PWD SoR 2022 (2nd REVISED) for Civil Works 137 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 11.5 Supplying and making hand rail for stair case with matured seasoned wood including necessary grove cutting, moulding by CNC machine or any other means with proper corner, finishing as per design, fitting and fixing in position in all floors etc. all complete and accepted by the Engineer-in-charge. 11.5.1 Mehgoni wood stair rail cum 124945.00 124748.00 122490.00 122490.00 11.5.2 Chattogram Silkarai / Chikrashi wood stair rail cum 148326.00 148130.00 145872.00 145872.00 11.5.3 Chattogram Teak wood stair rail cum 237176.00 232303.00 244027.00 244027.00 11.5.4 Myanmar(Burma) Teak wood stair rail cum 363436.00 358563.00 365658.00 365658.00 11.5.5 Jessore & other Local Teak wood stair rail cum 171708.00 171511.00 169253.00 169253.00 ……………………. END OF CHAPTER ELEVEN …………………

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 138 CHAPTER 12: DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 12.1 Supplying, fitting and fixing of 38 mm thick well matured seasoned (moisture content should be between 12% to 16%) solid wood single leaf door shutter having stile section 100m x 38mm, top rail section 125mm x 38mm, lock rail section 100mm x 38mm and bottom rail section 225mm x 38mm (made from minimum 250mm wide plank) with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished) 12.1.1.1 Kathal (SS Fittings) sqm 9293.00 9261.00 9069.00 9069.00 12.1.1.2 Kathal (Brass Fittings) sqm 9671.00 9640.00 9447.00 9447.00 12.1.2.1 Gamari (SS Fittings) sqm 8147.00 7887.00 8152.00 8152.00 12.1.2.2 Gamari (Brass Fittings) sqm 8526.00 8266.00 8531.00 8531.00 12.1.3.1 Chattogram Teak (SS Fittings) sqm 13874.00 13613.00 14106.00 14106.00 12.1.3.2 Chattogram Teak ( Brass Fittings) sqm 14253.00 13992.00 14484.00 14484.00 12.1.4.1 Myanmar(Burma) Teak (SS Fittings) sqm 20059.00 19798.00 20064.00 20064.00 12.1.4.2 Myanmar(Burma) Teak (Brass Fittings) sqm 20437.00 20177.00 20442.00 20442.00 12.2 Supplying, fitting and fixing 38 mm thick well matured seasoned (moisture content should be between 12 to 16%) wooden ornamental special design (both sides) single panel flush door shutter having stile, top rail and lock rail section 125 x 38mm and bottom rail section 225mm x 38mm (made from minimum 250mm wide plank) with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished) 12.2.1.1 Chattogram Teak (SS Fittings) sqm 16121.00 15838.00 16235.00 16235.00 12.2.1.2 Chattogram Teak (Brass Fittings) sqm 15695.00 15419.00 15877.00 15877.00 12.2.2.1 Myanmar(Burma) Teak (SS Fittings) sqm 21708.00 21432.00 21654.00 21654.00 12.2.2.2 Myanmar(Burma) Teak (Brass Fittings) sqm 22120.00 21844.00 22066.00 22066.00 12.3 Supplying, fitting and fixing 38mm thick well matured seasoned (moisture content should be between 12 to16%) wooden double leaf panel door shutters having stile and top rail section 100mm x 38mm, lock rail section 125mm x 38mm and bottom rail section 225mm x 38mm, paneling 38mm thick both sides raised (made from minimum 250mm wide plank) with 4nos 100mm long, 3mm thick hinge, 12mm

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 139 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished) 12.3.1.1 Kathal (SS Fittings) sqm 10200.00 10173.00 9983.00 9983.00 12.3.1.2 Kathal (Brass Fittings) sqm 11019.00 10992.00 10802.00 10802.00 12.3.2.1 Gamari (SS Fittings) sqm 8934.00 8654.00 8970.00 8970.00 12.3.2.2 Gamari (Brass Fittings) sqm 9753.00 9473.00 9790.00 9790.00 12.3.3.1 Chattogram Teak (SS Fittings) sqm 15264.00 14984.00 15551.00 15551.00 12.3.3.2 Chattogram Teak ( Brass Fittings) sqm 16083.00 15803.00 16370.00 16370.00 12.3.4.1 Myanmar(Burma) Teak (SS Fittings) sqm 22100.00 21820.00 22136.00 22136.00 12.3.4.2 Myanmar(Burma) Teak (Brass Fittings) sqm 22919.00 22639.00 22955.00 22955.00 12.4 Supplying, fitting and fixing 38mm thick well matured seasoned (moisture content should be between 12 to 16%) wooden double leaf panel door shutters with 1/4th glazed and 3/4th wooden panel having stile and top rail section 100mm x 38mm, lock rail section 125mm x 38mm, and bottom rail section 225mm x 38mm, paneling 38mm thick both sides raised (made from minimum 250mm wide plank) with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in- charge. (All sizes of wood are finished) 12.4.1.1 Kathal (SS Fittings) sqm 9040.00 9015.00 8849.00 8849.00 12.4.1.2 Kathal (Brass Fittings) sqm 9168.00 9147.00 8996.00 8996.00 12.4.2.1 Gamari (SS Fittings) sqm 7461.00 7227.00 7501.00 7501.00 12.4.2.2 Gamari (Brass Fittings) sqm 8070.00 7837.00 8111.00 8111.00 12.4.3.1 Chattogram Teak (SS Fittings) sqm 12779.00 12545.00 13031.00 13031.00 12.4.3.2 Chattogram Teak ( Brass Fittings) sqm 13423.00 13189.00 13675.00 13675.00 12.4.4.1 Myanmar(Burma) Teak (SS Fittings) sqm 18524.00 18289.00 18564.00 18564.00 12.4.4.2 Myanmar(Burma) Teak (Brass Fittings) sqm 19168.00 18933.00 19208.00 19208.00 12.5 Supplying, fitting and fixing 38 mm thick well matured seasoned (moisture content should be between 12 to 16%) wooden grooved single panel flush door shutter having stile, top rail and horizontal panel section 100mm x 38mm and bottom rail section 250mm x 38mm (made from

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 140 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur Min 250mm wide plank) including keeping 6mm x 12mm even groove all around and minimum 12mm grooved lap to each panel with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished) 12.5.1.1 Kathal (SS Fittings) sqm 9787.00 9752.00 9545.00 9545.00 12.5.1.2 Kathal (Brass Fittings) sqm 10166.00 10131.00 9924.00 9924.00 12.5.2.1 Gamari (SS Fittings) sqm 8584.00 8308.00 8583.00 8583.00 12.5.2.2 Gamari (Brass Fittings) sqm 8963.00 8687.00 8961.00 8961.00 12.5.3.1 Chattogram Teak (SS Fittings) sqm 14600.00 14325.00 14837.00 14837.00 12.5.3.2 Chattogram Teak ( Brass Fittings) sqm 14979.00 14704.00 15216.00 15216.00 12.5.4.1 Myanmar(Burma) Teak (SS Fittings) sqm 21098.00 20823.00 21097.00 21097.00 12.5.4.2 Myanmar(Burma) Teak (Brass Fittings) sqm 21477.00 21201.00 21476.00 21476.00 12.6 Supplying, fitting and fixing 36 mm thick factory made solid wooden door shutter from a reputed manufacturer having manufacturer's warranty made of chemically treated (pressure treatment method) timber (moisture content should be between 12 to 16%) having stile 125mm x 36mm, top and bottom rail 140mm x 36mm and horizontal rail 120mm x 36mm including keeping 5mm x 8mm even groove all around with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (Price includes cost of polishing) (All sizes of wood are finished) 12.6.1 Commercial solid wooden door (Normal Polish) With SS Fittings sqm 8353.00 8346.00 8303.00 8303.00 12.6.2 Commercial solid wooden door (Normal Polish) With Brass Fittings sqm 8692.00 8685.00 8641.00 8641.00 12.7 Supplying, fitting and fixing 36 mm thick factory made solid wooden door shutter (moisture content should be between 12 to 16%) from a reputed manufacturer with manufacturer's warranty having stile 150mm x 36mm, top rail 125mm x 36mm, bottom rail 225mm x 36mm with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished)

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 141 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 12.7.1.1 Myanmar (Burma) Teak (SS Fittings) sqm 31301.00 31294.00 31251.00 31251.00 12.7.1.2 Myanmar (Burma) Teak (Brass Fittings) sqm 31639.00 31633.00 31589.00 31589.00 12.7.2.1 Mahogany (Chemically treated by Pressure treatment method) (SS Fittings) sqm 10420.00 10413.00 10369.00 10369.00 12.7.2.2 Mahogany (Chemically treated by Pressure treatment method) (Brass Fittings) sqm 10758.00 10752.00 10708.00 10708.00 12.7.3.1 Beech Wood (SS Fittings) sqm 19328.00 19321.00 19278.00 19278.00 12.7.3.2 Beech Wood (Brass Fittings) sqm 19667.00 19660.00 19616.00 19616.00 12.7.4 Added Cost for both side Ultra Violet (UV) Lacquer Polish (One side of door area to be used for measurement) sqm 4751.00 4751.00 4751.00 4751.00 12.8 Supplying, fitting and fixing of 40mm thick Wood Plastic Composite (WPC) door shutter (minimum inner wall thickness 6mm and hinge side wall thickness 15mm) having door frame section 150mm x 62mm weighing 16.7kg/sqm with 4nos 100mm long, 3mm thick hinge, 1 no round lock, 2nos 150mm long handle, hinged cleats and carrying the same to the site and local carriage etc. All complete in all floors and accepted by the Engineer-in-charge. 12.8.1 Door Size 6'9' x 2'6'' each 18190.00 18186.00 18158.00 18158.00 12.8.2 Door Size 6'9' x 3'0'' each 21907.00 21904.00 21876.00 21876.00 12.8.3 Door Size 6'9' x 3'4'' each 23706.00 23703.00 23674.00 23674.00 12.9 Supplying, fitting and fixing 36 mm thick and having density 400 kg/cum solid particle board single leaf flush door shutter for all floors for internal use made of well matured mechanical seasoned Rubber (Malaysian timber) or other approved wooden frame having 1.2mm thick veneer pasted on each side by mechanical process with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished) 12.9.1.1 Myanmar(Burma) Teak veneered (SS Fittings) sqm 5683.00 5679.00 5657.00 5657.00 12.9.1.2 Myanmar(Burma) Teak veneered (Brass Fittings) sqm 6021.00 6018.00 5996.00 5996.00 12.9.2.1 Champ veneered (SS Fittings) sqm 4325.00 4322.00 4300.00 4300.00 12.9.2.2 Champ veneered (Brass Fittings) sqm 4664.00 4660.00 4639.00 4639.00 12.9.3.1 Chapalish veneered (SS Fittings) sqm 4325.00 4322.00 4300.00 4300.00 12.9.3.2 Chapalish veneered (Brass Fittings) sqm 4664.00 4660.00 4639.00 4639.00 12.9.4.1 Garjan veneered (SS Fittings) sqm 4488.00 4485.00 4463.00 4463.00

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 142 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 12.9.4.2 Garjan veneered (Brass Fittings) sqm 4827.00 4823.00 4801.00 4801.00 12.9.5.1 For Formica laminated Door (Commercial Lipping) (SS Fittings) sqm 6170.00 6167.00 6145.00 6145.00 12.9.5.2 For Formica laminated Door (Commercial Lipping) (Brass Fittings) sqm 6508.00 6505.00 6483.00 6483.00 12.10 Supplying, fitting and fixing well matured seasoned (moisture content should be between 12 to 16%) wooden fixed louver shutter having 62 mm x 125 mm frame and inner horizontal wooden louver 150 mm x 25 mm (minimum 250 mm wide plank) size spaced @ 50 mm c/c fixed with frame in grooves with 4nos 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished). 12.10.1 Gamari sqm 11888.00 11410.00 12144.00 12144.00 12.10.2 Chapalish sqm 13704.00 13226.00 13960.00 13960.00 12.10.3 Chattogram Teak sqm 23238.00 22760.00 23944.00 23944.00 12.10.4 Myanmar (Burma) Teak sqm 35497.00 35018.00 35753.00 35753.00 12.11 Supplying, fitting and fixing well matured seasoned (moisture content should be between 12 to 16%) wooden glazed ventilator louver shutter having outer frame section 62 mm x 125 mm with 62 mm x 125 mm vertical divider with inner 50mm x 38mm shutter and with 3 Nos. horizontal 38 mm x 38 mm sash bar in each part (minimum 250 mm wide plank) and inner horizontal glazed louver of size 150 mm x 5mm fixed in frame @ 154 mm c/c by cutting grooves in the frame with 4nos. 100mm long, 3mm thick hinge, 12mm dia 250mm long tower bolt, 12mm dia 200mm long socket bolt, 2nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in- charge. (All sizes of wood are finished). 12.11.1 Gamari sqm 8126.00 7838.00 8237.00 8237.00 12.11.2 Chapalish sqm 9194.00 8906.00 9305.00 9305.00 12.11.3 Chattogram Teak sqm 14804.00 14516.00 15179.00 15179.00 12.11.4 Myanmar(Burma) Teak sqm 22016.00 21728.00 22127.00 22127.00 12.12 Supplying fitting and fixing 38 mm thick well matured seasoned (moisture content should be between 12 to 16%) wooden double leaf glazed door shutters having stiles and rails section 150 mm x 38 mm (made from minimum 250 mm wide plank) and 5 mm glass panes fitted and fixed with wooden batten, putty and nails, 8nos 100mm long, 3mm

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 143 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur thick hinge, 4nos 12mm dia 250mm long tower bolt, 4nos 150mm long handle, hinged cleats and buffer blocks. All complete in all floors and accepted by the Engineer-in- charge. (All sizes of wood are finished). 12.12.1.1 Chattogram Teak (SS Fittings) sqm 9030.00 8893.00 9117.00 9117.00 12.12.1.2 Chattogram Teak (Brass Fittings) sqm 9602.00 9465.00 9688.00 9688.00 12.12.2.1 Silkarai (SS Fittings) sqm 6769.00 6752.00 6619.00 6619.00 12.12.2.2 Silkarai (Brass Fittings) sqm 7341.00 7323.00 7190.00 7190.00 12.12.3.1 Myanmar(Burma) Teak (SS Fittings) sqm 12243.00 12106.00 12212.00 12212.00 12.12.3.2 Myanmar(Burma) Teak (Brass Fittings) sqm 12814.00 12678.00 12783.00 12783.00 12.13 Supplying, fitting and fixing 38 mm thick well matured seasoned (moisture content should be between 12 to 16%) wooden glazed window shutters having horizontal and vertical sections of 87 mm x 38 mm and sash bar 38 mm x 38 mm (made from minimum 250 mm wide plank) fitted with 3 mm glass panes with putty and nails and provided with 6nos 75mm long hinges, 2nos 150mm tower bolt, 2 nos handle and 2nos 225mm catch hooks. All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished). 12.13.1.1 Kathal (SS Fittings) sqm 7971.00 7948.00 7781.00 7781.00 12.13.1.2 Kathal (Brass Fittings) sqm 8783.00 8760.00 8593.00 8593.00 12.13.2.1 Gamari (SS Fittings) sqm 7198.00 7020.00 7162.00 7162.00 12.13.2.2 Gamari (Brass Fittings) sqm 8010.00 7832.00 7974.00 7974.00 12.13.3.1 Chattogram Teak (SS Fittings) sqm 11065.00 10888.00 11183.00 11183.00 12.13.3.2 Chattogram Teak (Brass Fittings) sqm 11877.00 11700.00 11995.00 11995.00 12.13.4.1 Chapalish (SS Fittings) sqm 7816.00 7639.00 7781.00 7781.00 12.13.4.2 Chapalish (Brass Fittings) sqm 8629.00 8451.00 8593.00 8593.00 12.13.5.1 Myanmar(Burma) Teak (SS Fittings) sqm 15242.00 15065.00 15206.00 15206.00 12.13.5.2 Myanmar(Burma) Teak (Brass Fittings) sqm 16054.00 15877.00 16018.00 16018.00 12.14 Supplying, fitting and fixing 38 mm thick well matured seasoned (moisture content should be between 12 to 16%) wooden window shutters one third glazed and two third raised paneling on both sides having horizontal and vertical sections of 87 mm x 38 mm and sash bars 38 mm x 38 mm (made from minimum 250 mm wide plank) fitted with 3 mm glass panes with putty and nails and provided with 6nos 75mm long hinges, 2nos 150mm tower bolt, 2 nos 100mm

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 144 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur long handle and 2nos 225mm long catch hooks, All complete in all floors and accepted by the Engineer-in-charge. (All sizes of wood are finished). 12.14.1.1 Kathal (SS Fittings) sqm 11707.00 11675.00 11453.00 11453.00 12.14.1.2 Kathal (Brass Fittings) sqm 12576.00 12544.00 12322.00 12322.00 12.14.2.1 Gamari (SS Fittings) sqm 10318.00 10008.00 10342.00 10342.00 12.14.2.2 Gamari (Brass Fittings) sqm 11187.00 10878.00 11211.00 11211.00 12.14.3.1 Chattogram Teak (SS Fittings) sqm 17261.00 16951.00 17560.00 17560.00 12.14.3.2 Chattogram Teak (Brass Fittings) sqm 18131.00 17821.00 18430.00 18430.00 12.14.4.1 Chapalish (SS Fittings) sqm 11429.00 11119.00 11453.00 11453.00 12.14.4.2 Chapalish (Brass Fittings) sqm 12298.00 11989.00 12322.00 12322.00 12.14.5.1 Myanmar(Burma) Teak (SS Fittings) sqm 24760.00 24450.00 24784.00 24784.00 12.14.5.2 Myanmar(Burma) Teak (Brass Fittings) sqm 25629.00 25320.00 25653.00 25653.00 12.15.1 Supplying, fitting and fixing steel glazed window shutters for all floors with frames as per design having 25 mm x 25 mm x 5 mm angle section for Chowkat and shutters and 50 mm x 25 mm x 5 mm T- section used for vertical member and 25 mm x 5 mm F.I. bar for making box (combining with angle) and 25 mm x 19 mm x 5 mm T-section used for glass divider including all charges for welding, riveting etc. including cost of supplying all essential fittings like iron hinges, plate handle, pin-stopper, adjustable cleat and clamps including supplying, fitting, fixing 3 mm glass panes by pucca putty, for fitting and fixing the frame, making necessary holes in brick walls and R.C.C works and fitting with C.C. (1:2:4) and mending good the damages including all cost of carriage, workshop charges, electricity and labour for fittings, fixing, curing etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the costs of painting). sqm 6993.00 6992.00 6982.00 6982.00 12.15.2 Supplying, fitting and fixing M.S. door shutters made with 38 mm x 38 mm x 6 mm angle outer frame, inner member 25 mm x 6 mm F.I. bar, cladding with 16 BWG M.S. sheet, 04 nos 75 mm long hinge, 02 nos. locking arrangement with 50 mm x 50 mm x 6 mm M.S. angle chowkat including all charges for welding, riveting etc. including cost of supplying all essential fittings like iron hinges, socket bolts, clamps, for fitting and fixing the frame, making necessary holes in brick walls and R.C.C works and fitting with C.C. (1:2:4) and mending good the damages including all cost of carriage, workshop charges, electricity and labour for fittings, fixing, curing etc. all complete and accepted by the Engineer-in- charge. (Rate is excluding the costs of painting). sqm 7848.00 7812.00 7589.00 7589.00

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 145 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 12.16 Supplying, fitting and fixing steel glazed window shutters for all floors with frames as per design having 19mm x 19mm for making T-section for horizontal dividers of shutters and 25mm x 3mm F.I. bar for middle vertical members of frame including all cost of charges for fabrication and manufacture by welding, riveting, etc. Supplying all essential fittings like 2 nos stopper handle, 300mm long 3 or 2 nos adjustable iron cleats, 6 or 4 nos 50mm long iron pin hinges, 150mm long 4 nos clamps including supplying, fitting, fixing 3mm glass panes by pucca putty, for fitting and fixing frame making necessary holes in brick and R.C.C. wall or member as necessary filling with C.C. (1:2:4) and mending good the damages including all cost of carriage, electricity, workshop charges and labour for fitting, fixing, etc. all complete as per drawing and design and accepted by the Engineer-in-charge. (Rate is excluding the costs of painting) 12.16.1 With provision for fan-light by providing necessary additional materials, 03 nos adjustable 300 mm long iron cleats and 6 nos 50 mm long iron pin hinges. (total weight of grill without glass panes is min 28.13 kg for 15 sft) sqm 4556.00 4556.00 4546.00 4546.00 12.16.2 Without provision for fan-light by providing 02 nos adjustable 300 mm long iron cleats and 4 nos 50 mm long iron pin hinges. (total weight of grill without glass panes is min 24.84 kg for 15 sft) sqm 4260.00 4260.00 4250.00 4250.00 12.17 Manufacturing, supplying fitting and fixing of fixed glazed frame for all floors with outer member of 19mm x 19mm x 19mm x 3mm Z-section and vertical and horizontal dividers of 19mm x 19mm x 3mm T-section including all cost of fabrication and welding, supplying and fixing of 19mm x 19mm x 3mm angle clamps of 150mm long (with one end bifurcated) of required Nos with the frame, fixing the frame in wall with (1:2:4) cement concrete in the hole for clamp after making necessary grooves, supplying and fixing of 3mm glass panes with pucca putty, mending good all damages, painting iron face with two coats of synthetic enamel paint over a coat of anti-corrosive priming of approved colour and quality etc. cost of electricity, workshop charges, carriage etc. all complete as per drawing and accepted by the Engineer-in-charge. [Rate is excluding the cost of painting] (Scope of work of this item is in staircase and over partition wall etc.) sqm 4207.00 4206.00 4194.00 4194.00 12.18 Supplying, fitting and fixing 25 mm thick wooden double leaf fly proof wire mesh window shutters for all floors with 75 mm x 25 mm vertical and horizontal stile and sash bar of 38 mm x 25 mm section provided with 24 B.W.G. G.I wire mesh netting of 20 mm mesh fitted and fixed with shutter by 12 mm x 12 mm wooden bit, screws, nails, etc. including supply of all necessary fittings such as 2 Nos 150 mm long tower and socket bolt of best quality 4 Nos 75mm long hinges, 2 Nos 150 mm long catch hook and 2 Nos. 100 mm long handle including fitting and fixing the same in position

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 146 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur with frame with supply of necessary screws, nails, etc. complete and accepted by the Engineer-in-charge. (All sizes of wood are finished) 12.18.1.1 Kathal (SS Fittings) sqm 6003.00 5984.00 5841.00 5841.00 12.18.1.2 Kathal (Brass Fittings) sqm 7174.00 7155.00 7011.00 7011.00 12.18.2.1 Chattogram Teak (SS Fittings) sqm 7986.00 7868.00 8021.00 8021.00 12.18.2.2 Chattogram Teak (Brass Fittings) sqm 9157.00 9039.00 9192.00 9192.00 12.18.3.1 Myanmar(Burma) Teak (SS Fittings) sqm 10663.00 10545.00 10600.00 10600.00 12.18.3.2 Myanmar(Burma) Teak (Brass Fittings) sqm 11834.00 11716.00 11771.00 11771.00 12.19 Supplying, fitting and fixing of well matured wooden louver shutter (Chattogram Teak) having 75.50 mm x 38 mm size all around frame and inner horizontal wooden louver blade 65 mm x 20 mm spaced @ 38 mm c/c, fitted and fixed with 2 nos hinges, 1 no handle and 2 nos magnetic catch. All complete in all floors and accepted by the Engineer-in- charge. 12.19.1 With SS Fittings sqm 17090.00 16785.00 17314.00 17314.00 12.19.2 With Brass Fittings sqm 17389.00 17083.00 17612.00 17612.00 12.20 Supplying, fitting and fixing hydraulic door closer (big size) of approved quality including all necessary tools and accessories etc. all complete and accepted by the Engineer- in-charge. each 2759.00 2757.00 2740.00 2740.00 12.21 Supplying, fitting and fixing mortice door lock with lever handle of approved quality including all necessary tools and accessories etc. all complete approved and accepted by the Engineer-in-charge. each 1277.00 1274.00 1245.00 1245.00 12.22 Supplying, fitting and fixing rim/round door lock of approved quality including all necessary tools and accessories etc. all complete and accepted by the Engineer- in-charge. each 1088.00 1085.00 1056.00 1056.00 12.23 Supplying, fitting and fixing best quality heavy type 19 mm dia and 300 mm long hasp bolt including cutting grooves in door shutter and frames, screws etc. all complete approved and accepted by the Engineer-in-charge. 12.23.1 SS Hasp Bolt each 353.00 353.00 347.00 347.00 12.23.2 Brass Hasp Bolt each 568.00 568.00 561.00 561.00 12.24 Supplying, fitting and fixing of best quality magnetic door holder of approved quality including all necessary tools and accessories all complete and accepted by the Engineer-in- charge. each 385.00 383.00 372.00 372.00

DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER PWD SoR 2022 (2nd REVISED) for Civil Works 147 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 12.25 Supplying, fitting and fixing approved best quality foreign made stainless steel/brass door viewer/eye viewer from 12 mm to 20 mm diameter with adjustable thickness suitable for fitting from 37 mm to 50 mm thick door shutter in/c all necessary work as per direction and accepted by the Engineer-in-charge. each 631.00 628.00 605.00 605.00 ……………………. END OF CHAPTER TWELVE…………………

WINDOW GRILL, VERANDAH GRILL & NETTING PWD SoR 2022 (2nd REVISED) for Civil Works 148 CHAPTER 13: WINDOW GRILL, VERANDAH GRILL & NETTING Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 13.1 Supplying, fitting and fixing window grills made of 16 mm dia M.S. rod @ 100 mm c/c fitted with 3 (three) nos. horizontal M.S. flat bar (38 mm x 6 mm) including fabrication, welding, riveting, cost of electricity, workshop charges, carriage, fixing with clamps in wall/RCC member for all floors, finished with anti-corrosive painting (Red-Oxide) etc. complete and accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 19 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2957.00 2955.00 2936.00 2936.00 13.2 Supplying, fitting and fixing window grills of any design made of 20 mm x 3 mm mild steel section @ 100 mm c/c with outer frame of 25 mm x 6 mm F.I. bar including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-Oxide) etc. complete for all floors and accepted by the Engineer-in- charge. (Total weight per sqm should be approx. 10.00 kg. and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2014.00 2011.00 1985.00 1985.00 13.3.1 Supplying, fitting and fixing window grills of any design made with 20 mm x 5 mm F.I. bar @ 100 mm c/c as inner and outer section; including fabricating, welding, cost of electricity and tools and plants, finished with anti-corrosive painting (Red-Oxide), carriage, cutting grooves, mending good the damages etc. complete for all floors accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 11 kg. and add or deduct. @ 100.00 for each kg/sqm excess or less respectively) sqm 2133.00 2130.00 2104.00 2104.00 13.3.2 Supplying, fitting and fixing window grills of any design made with 20 mm x 5 mm F.I. bar @ 100 mm c/c as inner members but no outer frame; including fabrication, welding, cost of electricity, workshop charges, carriage, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-Oxide) etc. complete for all floors accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 9 kg and add or deduct. @ 100.00 for each kg/sqm excess or less respectively) sqm 1955.00 1952.00 1927.00 1927.00 13.4.1 Supplying, fitting, fixing window grills of any design made with 25 mm x 6 mm F.I. bar @ 100 mm c/c as both outer and inner section; including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-Oxide) etc. complete for all floors accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 19 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2876.00 2873.00 2848.00 2848.00

WINDOW GRILL, VERANDAH GRILL & NETTING PWD SoR 2022 (2nd REVISED) for Civil Works 149 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 13.4.2 Supplying, fitting, fixing window grills of any design made with 25 mm x 6 mm F.I. bar @ 100 mm c/c as inner section but no outer frame; including fabrication, welding, cost of electricity workshop charges, labour charges for fitting and fixing grills in position, local carriage charges, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-oxide) etc. complete for all floors accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 16 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2561.00 2558.00 2532.00 2532.00 13.4.3 Supplying, fitting, fixing window grills of any design made with 25 mm x 6 mm F.I. bar as outer frame and 20 mm x 5 mm F.I. inner member @ 100 mm c/c; including fabrication, welding, cost of electricity workshop charges, labour charges for fitting and fixing grills in position, local carriage charges, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-Oxide) etc. complete for all floors accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 12 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2271.00 2268.00 2242.00 2242.00 13.5.1 Supplying, fitting and fixing window grill made of 10 mm x 10 mm M.S. solid bar @ 100mm c/c with outer frame of 38 mm x 6mm F.I. bar and 25 mm x 6 mm F.I. bar for clamp as per design including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-Oxide) etc. complete for all floors approved and accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 17 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2757.00 2754.00 2723.00 2723.00 13.5.2 Supplying, fitting and fixing window grill made of 12 mm x 12 mm M.S. solid bar @ 100mm c/c with outer frame of 38 mm x 6mm F.I. bar and 25 mm x 6 mm F.I. bar for clamp as per design including fabrication, welding, cost of electricity workshop charges, labour charges for fitting and fixing grills in position, local carriage charges, cutting grooves, mending good the damages, tools and plants, finished with anti- corrosive painting (Red-Oxide) etc. complete for all floors approved and accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 19 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2904.00 2900.00 2869.00 2869.00 13.5.3 Supply, fitting & fixing window grills made of 10 mm x 10 mm M.S. solid bar @ 100 mm c/c with 25 x 6 mm F.I. Bar for Clamp and no outer frame; including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-Oxide) etc. complete for all floors accepted by the Engineer-in-charge. sqm 2333.00 2331.00 2310.00 2310.00

WINDOW GRILL, VERANDAH GRILL & NETTING PWD SoR 2022 (2nd REVISED) for Civil Works 150 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur (Total weight per sqm should be approx. 14 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) 13.5.4 Supply, fitting & fixing window grills made of 12 mm x 12 mm M.S. solid bar @100 mm c/c as inner members but no outer frame, with 25 x 6 mm F.I. Bar for Clamp; including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants, finished with anti-corrosive painting (Red-Oxide) etc. all complete for all floors accepted by the Engineer-in- charge. (Total weight per sqm should be approx. 15 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2467.00 2465.00 2444.00 2444.00 13.5.5 Supply, fitting & fixing window grills made of 12 mm x 12 mm stainless steel (SS) bar with wall thickness 1.5 mm @ 100 mm c/c as inner frame but no outer frame; including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants, clamps and other necessary accessories for fitting, fixings grills in position, polishing etc. complete for all floors accepted by the Engineer-in-charge. sqm 3455.00 3452.00 3432.00 3432.00 13.6 Supplying, fitting and fixing veranda grill made of 10 mm dia M.S. rod provided @ 100 mm c/c in any position both ways as per design with outside frame 25 mm x 25 mm x 6 mm M.S. angle including fabricating, welding in each point, painting a coat of anti-corrosive painting (Red-Oxide), including cost of electricity, tools and plants, workshop charges, carriage of the same including cutting groves in the R.C.C. or brick work, mending good the damages with C.C. (1:1.5:3) etc. complete for all floors accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 17 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 2748.00 2745.00 2726.00 2726.00 13.7 Supplying, fitting and fixing verandah grill made of 10 mm dia M.S. rod provided @ 75 mm c/c in any position both ways as per design with outside frame of 25 mm x 25 mm x 6 mm M.S. angle and F.I. bar clamps including fabricating, welding in each point , painting a coat of anti-corrosive painting (Red-Oxide), including cost of electricity, tools and plants, workshop charges, carriage of the same including cutting groves in the R.C.C. or brick work, mending good the damages with C.C. (1:1.5:3) etc., all complete for all floors accepted by the Engineer-in-charge. (Total weight per sqm should be approx. 21 kg and add or deduct @ 100.00 for each kg/sqm excess or less respectively) sqm 3136.00 3134.00 3115.00 3115.00 13.8 Supplying, fitting and fixing MS verandah grill as per design and shape with 75 mm x 50 mm MS box with 3 mm wall thickness middle rail (horizontal), one pair 50 mm x 25 mm MS hollow box with 3 mm wall thickness @ 750 mm c/c vertical and 12 mm x 12 mm MS solid bar sqm 4868.00 4865.00 4844.00 4844.00

WINDOW GRILL, VERANDAH GRILL & NETTING PWD SoR 2022 (2nd REVISED) for Civil Works 151 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur @ 75 mm c/c horizontal and providing approx. 750 mm x 750 mm emergency exit with proper locking arrangement (if necessary) as per required measurement including cutting grooves in wall up to 150 mm depth and mending good the damages with C.C. (1:1.5:3), finished with anti-corrosive paint (Red-Oxide painting) etc. complete as per drawing and design and accepted by the Engineer. 13.9 Supplying, fitting and fixing MS verandah grill as per design and shape with 75 mm x 50 mm MS box with 3mm wall thickness middle rail (horizontal), 50 mm x 25 mm vertical rail with 3 mm wall thickness @ approx. 750 mm c/c, 25 mm x 25 mm MS box with 2 mm wall thickness horizontally @ 100 mm c/c as per required measurement including cutting grooves in wall up to 150 mm depth and mending good the damages with C.C. (1:1.5:3), finished with anti-corrosive paint (Red-Oxide painting) etc. complete as per drawing and design and accepted by the Engineer. sqm 4755.00 4753.00 4735.00 4735.00 13.10 Supplying, fitting, fixing Jail pattern M.S window grill made of 25 mm dia M.S Plain Rod @ 75 mm c/c fitted and fixed with M.S Angle frame 65 mm x 65 mm x 6 mm size placed 5 Nos. Horizontally and 2 Nos. Vertically including fabricating, welding, drilling, cutting and riveting the F.I bar and M.S angle clamp 10 Nos. including making holes in RCC Column/ Brick wall, fixing the clamps and mending good the damages with C.C (1:1.5:3), finished with anti-corrosive paint (Red-Oxide painting) etc. all complete as per direction by Engineer-in-Charge. sqm 9898.00 9892.00 9846.00 9846.00 13.11 Supplying, fitting, fixing Jail pattern M.S Verandah grill made of 20 mm dia M.S Plain Rod @ 100 mm c/c fitted and fixed with M.S Angle frame 50 mm x 50 mm x 6 mm size placed 5 Nos. Horizontally and 2 Nos. Vertically including fabricating, welding, drilling, cutting and riveting the F.I bar and M.S angle clamp 10 Nos. including making holes in RCC Column/ Brick wall fixing the clamps and mending good the damaged with C.C (1:1.5:3), finished with anti- corrosive paint (Red-Oxide painting) etc. all complete as per direction by Engineer-in-Charge. sqm 6034.00 6031.00 6008.00 6008.00 13.12 Supplying, Fitting, Fixing Jail pattern M.S grill door made of 25 mm dia M.S Plain Rod @ 75 mm c/c fitted and fixed with M.S Angle frame 65 mm x 65 mm x 6 mm size 7 Nos. placed Horizontally and 2 Nos. Vertically providing 25 mm dia M.S rod of 1200 mm long and 38 thick M.S plate up to a size of 1′-6″ x 1′-0″ for locking arrangement, 38 mm dia G.I pipe of 1′-0″ long for locking) including fabricating, welding, drilling, cutting and riveting the F.I bar and M.S angle clamp 8 Nos. including making holes in wall fixing the clamps and mending good the damaged with C.C (1:1.5:3) including anticorrosive paint etc. all complete as per direction by the Engineer-in-Charge. sqm 13094.00 13087.00 13030.00 13030.00 13.13 Supplying, Fitting, Fixing Steel window shutter with frames top portion ventilation (2′-6″) and bottom portion (3′-8″) outer frame of the window made with 38 mm x 38 mm x 6 mm M.S Angle and middle vertical member of sqm 9625.00 9609.00 9544.00 9544.00

WINDOW GRILL, VERANDAH GRILL & NETTING PWD SoR 2022 (2nd REVISED) for Civil Works 152 Item No. Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur frame made with 38 mm x 38 mm x 6 mm M.S- T and shutter frame made of M.S Angle of same section, ventilation portion paired with 1.5 mm thick M.S sheet fixed @ 38 mm c/c (20 Nos.) and bottom 3′-8″ panel portion divided into 3 equal panes with 1.50 mm thick M.S sheet, including fabricating, welding, riveting, provided with necessary fittings like 12 mm dia 150 mm long socket bolt, 300 mm long 25 mm x 6 mm size F.I bar adjustable cleats, 125 mm long 50 mm x 50 mm x 6 mm size M.S angle handle, 300 mm long M.S angle clamp (8 Nos. hinge) including making holes in wall for fixing the clamps and mending good the damages with C.C (1:1.5:3) and a cot of anticorrosive paint etc. all complete as per direction by the Engineer-in- Charge. ……………………. END OF CHAPTER THIRTEEN…………………

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 153 CHAPTER 14: ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 14.1 Supplying fitting and fixing of aluminium swing door with spandrel as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.5 mm thick wall frame (size 101.60 mm, 44.45 mm), 2.0 mm thick shutter side (size 54 mm, 46 mm), 0.99 mm thick door glass bit (size 16.54 mm, 15.49 mm, 0.115 kg/m), 1.8 mm thick closure section (size 101.60 mm, 42.93 mm),1.5 mm thick 106.60 mm closure cover (0.392 kg/m), 4 mm thick floor bottom (size 101.60 mm, 12.70 mm, 1 kg/m), 1.8 mm thick shutter bottom (size 82.6 mm, 43.99 mm, 0.60 kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) and 2.3 mm to 4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m), 1.5 mm thick 31.75 mm shutter divider (0.535 kg/m), 1.5 mm thick 7.14 mm spandrel section of all aluminum members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like swing door clousure, swing door lock, swing door mohiar, labour charge, fabrication, fitting fixing in position, carriage and electricity charge keeping provision for fitting 5/6 mm thick glass including neoprene sealant etc. complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.1.1 Anodized to bronze colour sqm 8530.00 8519.00 8457.00 8457.00 14.1.2 Powder coated to any colour sqm 9414.00 9403.00 9340.00 9340.00 14.2 Supplying fitting and fixing of aluminium swing door as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.5 mm thick wall frame (size 101.60 mm, 44.45 mm, 83.21 mm), 2.0 mm thick shutter side (size 54 mm, 46 mm), 0.99 mm thick door glass bit (size 16.54 mm, 15.49 mm, 0.115 kg/m), 1.8 mm thick closure section (size 101.60 mm, 42.93 mm),1.5 mm thick 106.60 mm closure cover (0.392 kg/m), 4 mm thick floor bottom (size 101.60 mm, 12.70 mm, 1 kg/m), 1.8 mm thick shutter bottom (size 82.6 mm, 43.99 mm, 0.60 kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) and 2.3 mm to 4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m) section of all aluminum members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like swing door clousure, swing door lock, swing door mohiar, labour charge, fabrication, fitting fixing in position, carriage and electricity charge keeping provision for fitting 5 mm thick glass including neoprene sealant etc. complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.2.1 Anodized to any colour sqm 7799.00 7790.00 7736.00 7736.00

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 154 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 14.2.2 Powder coated to any colour sqm 8504.00 8495.00 8441.00 8441.00 14.3 Supplying, fitting and fixing of aluminium composite swing doors with fixed partition as per the U. S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.5 mm thick wall frame (size 101.60, 44.45 mm, 0.86 kg/m), 1.8 mm thick shutter side (size 54 mm, 46 mm, 1.2 kg/m ), 0.99 mm thick door glass bit (size 16.54 mm, 14. 49 mm, 0.115 kg/m), 1.8 mm thick closure section (size 101.54 mm, 42.93 mm, 1.20 kg/m), 1.5 thick closure cover (101.60 mm, 0.45 kg/m), 4 mm thick floor bottom (size 101.60 mm, 12.70 mm, 1 kg/m), 1.8 mm thick shutter bottom (size 86.60 mm, 43.99 mm , 0.60 kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) 2.3mm to 4.01mm thick handle (short) (size 101.60 mm, 38.10 mm, 25.40 mm, 1.35 kg/m), minimum 1.2 mm thick top and side (size 101.60 mm, 44.45 mm, 0.934 kg/m), minimum 1.2 mm thick bottom (size 101.35 mm, 44.45 mm, 0.734 kg/m), minimum 1.2 mm thick bottom cover (44.32 mm, 19.61mm, 0.333 kg/m), minimum 1.2 mm thick grouve cover (size 83.21 mm, 16.00 mm, 0.485 kg/m), 0.99 mm thick fixed glass protector (size 39.09 mm, 14.81 mm, 0.188 kg/m), 0.99 mm thick fixed glass protector bit (size 15.75 mm, 14.81 mm, 0.13 kg/m) section of all aluminum members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. (Total weight min 69.699 kg) keeping provision for 5 mm of glass panes with cost including all accessories like swing door clouser, swing door lock , swing door mohair, flush bolt , bolts and nuts including sealants, labour charge for fitting , fixing by angles, screws, mohiar, washer, machinery, cost of fabrication, making the grooves, mending good the damages, electricity etc. complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.3.1 Anodized to any colour sqm 4019.00 4015.00 3983.00 3983.00 14.3.2 Powder coated to any colour sqm 4439.00 4434.00 4403.00 4403.00 14.4 Supplying, fitting and fixing of aluminium sliding doors as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick outer bottom (size 75.50 mm, 17.79 mm, 0.47 kg/m(size 60 mm, 24 mm, 0.589 kg/m), minimum 1.2 mm thick outer side(size 75.50 mm, 19.90 mm, 0.52 kg/m),minimum 1.2 mm thick shutter lock (size 49.20 mm, 25.80 mm, 0.543 kg/m), minimum 1.2 mm thick inter lock (size 34.40 mm, 32.13 mm, 0.562 kg/m) sections all aluminum members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. including all accessories like handle, sliding door key lock , sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick glass including labour

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 155 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in- charge. Size up to: 2100 mm x 2100 mm 14.4.1 Anodized to any colour sqm 3360.00 3356.00 3311.00 3311.00 14.4.2 Powder coated to any colour sqm 3899.00 3895.00 3850.00 3850.00 14.5 Supplying, fitting and fixing of aluminium sliding doors with mosquito mesh as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick outer bottom (size 95 mm, 22.39 mm, 0.476 kg/m), minimum 1.2 mm thick outer top (size 95.00 mm, 28.50 mm, 0.749 kg/m), minimum 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 0.42 kg/m), minimum 1.2 mm shutter bottom (size 60 mm, 24.40mm, 0.589 kg/m), minimum 1.2 mm thick outer side(size 95.00 mm, 19.50 mm, 0.591kg/m), minimum 1.2 mm thick shutter lock (size 49.20 mm, 25.80 mm, 0.543 kg/m), minimum 1.2 mm thick inter lock (size 34.40 mm, 32.13 mm 0.562 kg/m), minimum 1.2 mm thick shutter divider (size 31.75 mm, 0.535 kg/m) sections all aluminum members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like handle, sliding door key lock , sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in-charge. Size up to: 2100 mm x 2100 mm 14.5.1 Anodized to any colour sqm 4738.00 4733.00 4681.00 4681.00 14.5.2 Powder coated to any colour sqm 5586.00 5581.00 5530.00 5530.00 14.6 Supplying, fitting and fixing of aluminium sliding doors with spandrel as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick outer bottom (size 75.50 mm, 17.79 mm, 0.605 kg/m), minimum 1.2 mm thick outer top (size 75.50 mm, 28.50 mm, 0.705 kg/m), minimum 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 0.42 kg/m), minimum 1.2 mm thick shutter bottom (size 60 mm, 24 mm, 0.589 kg/m), minimum 1.2 mm thick outer side(size 75.50 mm, 19.90 mm, 0.52 kg/m), minimum 1.2 mm thick shutter lock (size 49.20 mm, 25.80 mm, 0.543 kg/m), minimum 1.2 mm thick inter lock (size 34.40 mm, 32.13 mm, 0.562 kg/m), minimum 1.2 mm thick shutter divider (size 31.75 mm, 0.535 kg/m) and minimum 1.5 mm thick spandrel (7.14 mm) sections all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 156 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in- charge. Size up to: 1800 mm x 2100 mm 14.6.1 Anodized to any colour sqm 5114.00 5109.00 5057.00 5057.00 14.6.2 Powder coated to any colour sqm 5956.00 5951.00 5899.00 5899.00 14.7 Supplying, fitting and fixing of aluminium sliding window as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick outer bottom (size 75.50 mm, 32 mm, 0.605 kg/m), minimum 1.2 mm thick outer top (size 75.50 mm, 28.50 mm, 0.705 kg/m), minimum 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 0.42 kg/m), minimum 1.2 mm thick shutter bottom (size 60mm, 24.40 mm,0.589 kg/m), minimum 1.2 mm thick outer side (size 75.50 mm, 19.90 mm, 0.52 kg/m), minimum 1.2 mm thick shutter lock (size 49.20 mm, 25.80 mm, 0.543 kg/m) and minimum 1.2 mm thick inter lock (size 34.40 mm, 32.13 mm, 0.562 kg/m) sections all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in- charge. 14.7.1 Size up to: 1500 mm x 1400 mm. 14.7.1.1 Anodized to any colour sqm 3920.00 3913.00 3869.00 3869.00 14.7.1.2 Powder coated to any colour sqm 4711.00 4704.00 4660.00 4660.00 14.7.2 Size up to: 900 mm x 1400 mm 14.7.2.1 Anodized to any colour sqm 5334.00 5324.00 5267.00 5267.00 14.7.2.2 Powder coated to any colour sqm 6705.00 6695.00 6638.00 6638.00 14.8 Supplying, fitting and fixing of aluminium sliding window with mosquito mesh as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick outer bottom (95.00 mm, 38.00 mm outer bottom, 0.72 kg/m), minimum 1.2 mm thick outer top (95.00 mm, 28.5 mm outer top, 0.75 kg/m), minimum 1.2 mm thick shutter top (size 33

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 157 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur mm, 26.80 mm, 0.42 kg/m), minimum 1.2 mm thick shutter bottom (size 60 mm, 24.40 mm, 0.589 kg/m), minimum 1.2 mm thick outer side (95.00 mm, 19.50 mm outer side ,0.591 kg/m), minimum 1.2 mm thick shutter lock (size 49.20 mm 25.80 mm, 0.543 kg/m) and minimum 1.2 mm thick inter lock (size 34.40 mm, 32.13 mm, 0.562 kg/m) sections all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.8.1 Size up to: 1524 mm x 1372 mm 14.8.1.1 Anodized to any colour sqm 5261.00 5255.00 5208.00 5208.00 14.8.1.2 Powder coated to any colour sqm 6395.00 6389.00 6342.00 6342.00 14.8.2 Size up to: 1280 mm x 1372 mm 14.8.2.1 Anodized to any colour sqm 5990.00 5983.00 5926.00 5926.00 14.8.2.2 Powder coated to any colour sqm 7250.00 7242.00 7186.00 7186.00 14.8.3 Size up to: 762 mm x 610 mm 14.8.3.1 Anodized to any colour sqm 12443.00 12416.00 12262.00 12262.00 14.8.3.2 Powder coated to any colour sqm 14831.00 14804.00 14650.00 14650.00 14.9 Supplying, fitting and fixing of equal dimension frame (EDF) section aluminium sliding window with mosquito mesh as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.5 mm thick outer bottom (size 91.50 mm, 38.00 mm), 1.5 mm thick outer top (size 91.00 mm, 28.70 mm), 1.5 mm thick shutter top (size 65.00 mm, 27.30 mm), 1.5 mm thick shutter bottom (size 72.20 mm, 24.65 mm), 1.5 mm thick outer side (size 91.50 mm, 28.50 mm), 1.5 mm thick shutter lock (size 65.30 mm, 26.00 mm), 1.5 mm thick shutter inter lock (size 55.20 mm, 26.00 mm), 1.5 mm thick mesh section (size 55.20 mm, 13.20 mm), all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting fiber mesh including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in-charge.

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 158 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 14.9.1 Size up to: 1524 mm x 1372 mm 14.9.1.1 Anodized to any colour sqm 6662.00 6650.00 6580.00 6580.00 14.9.1.2 Powder coated to any colour sqm 6955.00 6949.00 6902.00 6902.00 14.9.2 Size up to: 1280 mm x 1372 mm 14.9.2.1 Anodized to any colour sqm 7220.00 7213.00 7157.00 7157.00 14.9.2.2 Powder coated to any colour sqm 7918.00 7911.00 7854.00 7854.00 14.9.3 Size up to: 762 mm x 610 mm 14.9.3.1 Anodized to any colour sqm 14703.00 14675.00 14522.00 14522.00 14.9.3.2 Powder coated to any colour sqm 16011.00 15984.00 15830.00 15830.00 14.10 Supplying, fitting and fixing of aluminium fixed composite window as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick outer bottom (size 75.50 mm, 32 mm, 0.605 kg/m), minimum 1.2 mm thick outer top (size75.50mm, 28.50 mm, 0.705 kg/m), minimum 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 0.42 kg/m), minimum 1.2 mm thick shutter bottom (size 60 mm, 24.40 mm, 0.589 kg/m), minimum 1.2 mm thick outer side (size 75.50 mm, 19.90 mm, 0.52 kg/m), minimum 1.2 mm thick shutter lock (size 49.20 mm, 25.80 mm,0.543 kg/m), minimum 1.2 mm thick inter lock (size 34.40 mm, 32.13 mm,0.562 kg/m ), minimum 1.2 mm thick bottom cover (size 17.40 mm, 31.78 mm, 0.25 kg/m), minimum 1.2 mm thick fixed bottom (size 76.20 mm, 38.10 mm, 0.640 kg/m), minimum 1.2 mm thick grouve cover ( size 57.15 mm, 15.88 mm, 0.362 kg/m) and minimum 1.2 mm thick top and side (size 76.20 mm, 38.10 mm, 0.769 kg/m) sections all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc.including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in-charge. Size up to: 1500 mm x 2100 mm. 14.10.1 Anodized to any colour sqm 4199.00 4195.00 4155.00 4155.00 14.10.2 Powder coated to any colour sqm 4919.00 4915.00 4875.00 4875.00 14.11 Supplying, fitting and fixing of aluminium top hung/casement windows as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.5 mm thick casement outer (size 38.86 mm, 36.36 mm, 0.395kg/m), 1.9

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 159 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur mm thick casement shutter (size 47.62 mm, 28.57 mm, 0.692 kg/m), and 1.245 mm thick shutter glass clip (size 15.87 mm, 27 mm, 0.188 kg/m) sections of all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories 4-bar hinge, casement handle, bolts and nuts keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer-in- charge. 14.11.1 Anodized to any colour sqm 11625.00 11613.00 11469.00 11469.00 14.11.2 Powder coated to any colour sqm 11844.00 11833.00 11703.00 11703.00 14.12 Supplying fitting and fixing of aluminium corrugated curtain wall as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick bottom cover (size 17.40 mm, 31.78 mm, 0.250 kg/m), minimum 1.2 mm thick fixed bottom (size 76.20 mm, 38.10 mm, 0.640 kg/m), minimum 1.2 mm thick grouve cover (size 57.15 mm, 15.80 mm 0.362 kg/m), minimum 1.2 mm thick top and side (size 76.2 mm, 57.15 mm, 0.769 kg/m) and 1.5 mm thick spandrel (7.14 mm) sections of will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of 4 mg per square cm etc. including all accessories like rivet, screws fixed neoprene etc. complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.12.1 Size up to: 3000 mm x 2100 mm 14.12.1.1 Anodized to any colour sqm 7724.00 7720.00 7678.00 7678.00 14.12.1.2 Powder coated to any colour sqm 8843.00 8839.00 8797.00 8797.00 14.12.2 Size up to: 3000 mm x 750 mm 14.12.2.1 Anodized to any colour sqm 9172.00 9161.00 9091.00 9091.00 14.12.2.2 Powder coated to any colour sqm 10487.00 10476.00 10405.00 10405.00 14.13 Supplying fitting and fixing of aluminium fixed fan light as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick fixed bottom (size 76.2 mm, 38.10 mm, 0.640 kg/m), minimum 1.2 mm thick (17.40 mm, 31.78 mm bottom cover 0.250 kg/m) and minimum 1.2 mm thick grouve cover (size 57.15 mm, 15.80 mm, 0.362 kg/m) and minimum 1.2 mm thick top and side section (76.20 mm, 16 mm, 38.10 mm, 0.769 kg/m) fixed with above mentioned frames and all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 160 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. including all accessories, neoprene, sealant, nut and bolt etc. complete in all respect as per drawing and accepted by the Engineer-in- charge. 14.13.1 Anodized to any colour sqm 6078.00 6050.00 5911.00 5911.00 14.13.2 Powder coated to any colour sqm 6554.00 6527.00 6387.00 6387.00 14.14 Supplying fitting and fixing of aluminium fixed louver as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having minimum 1.2 mm thick wall frame (size 76.20 mm, 38.10 mm, 0.564 kg/m),1.5 mm thick louver (size 55.02 mm, 37.39 mm, 0.281 kg/m) and minimum 1.2 mm thick louver outer section (size 39.67 mm, 15.06 mm) and inner inclined aluminium louver section fixed with above mentioned frame and all aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. including all accessories, neoprene, sealant, nuts and bolts etc. complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.14.1 Anodized to any colour sqm 11183.00 11147.00 10977.00 10977.00 14.14.2 Powder coated to any colour sqm 12642.00 12606.00 12436.00 12436.00 14.15 Supplying, fitting, fixing of aluminium sliding fly proof Netting shutter as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 2.0 mm thick outer frame (size 38mm x 38mm), minimum 1.2 mm thick mosquito net shutter frame mesh section (42.2 mm x13.2mm). All aluminium members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. including all accessories like wheel, sealant, rubber, bolts and nuts keeping provision for fitting fiber mesh including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity, all complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.15.1 Anodized to any colour sqm 3903.00 3902.00 3887.00 3887.00 14.15.2 Powder coated to any colour sqm 4494.00 4492.00 4477.00 4477.00 14.16 Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall distortion free glass of approved quality and shade including cost of fitting fixing all necessary accessories etc. complete in all respect as per drawing and accepted by the Engineer-in-charge. 14.16.1.1.1 5 mm thick tinted glass sqm 1534.00 1530.00 1514.00 1514.00

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 161 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 14.16.1.1.2 5 mm thick tinted tempered glass sqm 2460.00 2456.00 2440.00 2440.00 14.16.1.2.1 5 mm thick clear glass sqm 1263.00 1259.00 1243.00 1243.00 14.16.1.2.2 5 mm thick clear tempered glass sqm 2560.00 2556.00 2540.00 2540.00 14.16.1.3 5 mm thick ambushed glass sqm 1249.00 1245.00 1229.00 1229.00 14.16.1.4.1 5 mm thick reflective glass sqm 1705.00 1701.00 1685.00 1685.00 14.16.1.4.2 5 mm reflective tempered glass sqm 2959.00 2955.00 2939.00 2939.00 14.16.2.1.1 6 mm thick clear glass sqm 1534.00 1530.00 1514.00 1514.00 14.16.2.1.2 6 mm thick clear tempered glass sqm 2959.00 2955.00 2939.00 2939.00 14.16.2.2 6 mm thick ambushed glass sqm 2674.00 2670.00 2654.00 2654.00 14.16.2.3.1 6 mm thick reflecting glass sqm 1890.00 1886.00 1870.00 1870.00 14.16.2.3.2 6 mm thick reflecting tempered glass sqm 2917.00 2912.00 2896.00 2896.00 14.16.3.1 8 mm thick clear glass sqm 2179.00 2173.00 2152.00 2152.00 14.16.3.2 8 mm thick clear tempered glass sqm 3960.00 3955.00 3933.00 3933.00 14.16.4.1 10 mm thick clear glass sqm 2424.00 2418.00 2390.00 2390.00 14.16.4.2 10 mm thick clear tempered glass sqm 4391.00 4385.00 4357.00 4357.00 14.16.5.1 12 mm thick clear glass sqm 3180.00 3173.00 3146.00 3146.00 14.16.5.2 12 mm thick clear tempered glass sqm 6102.00 6095.00 6068.00 6068.00 14.16.6.1 13.52mm (6mm tempered lamination glass + 1.52mm PVB + 6mm tempered lamination glass) foreign made tempered lamination glass sqm 9333.00 9323.00 9285.00 9285.00 14.16.6.2 13.52 mm (6mm low-E lamination glass + 1.52mm PVB + 6mm lamination glass) foreign made tempered lamination glass sqm 11684.00 11675.00 11637.00 11637.00 14.16.7.1 17.52 mm (8mm tempered lamination glass + 1.52mm PVB + 8mm tempered lamination glass) foreign made tempered double glazing glass sqm 11372.00 11359.00 11308.00 11308.00 14.16.7.2 17.52 mm (8mm tempered lamination Low-E glass + 1.52mm PVB + 8mm clear tempered lamination glass) foreign made tempered double glazing glass sqm 12797.00 12785.00 12733.00 12733.00 14.16.8.1 24mm (6mm tempered glass + 12mm argon gas filled gap + 6mm tempered glass) foreign made tempered double glazing glass with structural foam spacer, seal, desiccant sqm 8199.00 8185.00 8131.00 8131.00 14.16.8.2 24 mm (6mm clear tempered Low-E glass + 12mm argon gas filled gap + 6mm clear tempered glass) foreign made tempered double glazing glass with structural foam spacer, seal, desiccant sqm 9482.00 9468.00 9414.00 9414.00

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 162 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 14.17 Supplying, fabrication and Installation of approved colour 4 mm thick Fire Rated Aluminium Composite Panel (Alucobond/Alucopanel/Alpolic or equivalent) of 0.5 mm thick aluminum skin cover both side with 3 coat PVDF on the front face panel sheet and non-combustible mineral filled core/ aluminum hydroxide filled (fr) core, skin cover sheet in Peralumam -100, ENAW -5005 (AlMg1) on the both side (Total weight. 7.60kg/sqm), as per US Architectural Aluminium Manufacturer's Association (AAMA) in column, beam and wall surface providing with 44 mm x 44 mm x 1.5 mm aluminum section including supply of necessary hardwares, consumables, scaffolding etc. fitted with necessary accessories like rivet, screw, rowel bolt etc. all complete in all respect as per drawing and direction of the Engineer-in-charge. sqm 13414.00 13411.00 13355.00 13355.00 14.18 Supplying, fitting and fixing of aluminium curtain wall with aluminium top hung/ casement windows as per the US Architectural Aluminium Manufacturer's Association (AAMA) standard specification and BDS 1879:2014 having 134 mm, 70 mm, 3.5 mm curtain wall sub-mullim outer and inner frame, 3.0 mm thick casement shutter (size 58.40 mm, 37.20 mm, 57.40 mm) 1.2 mm thick shutter glass strips, all aluminium member will be powder coated with coat not less than 1.5 micron in thickness including all accessories 4 bar hinge casement handle, 50 mm x 50 mm x 6 mm aluminium angle, steel rowel bolt, screws , rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in- charge. sqm 13782.00 13776.00 13690.00 13690.00 14.19 Supplying, fitting and fixing of aluminium curtain wall with aluminium top hung/casement windows as per the US Architectural Aluminium Manufacturer's Association (AAMA) standard specification and BDS 1879:2014 having 100 mm , 50mm, 2mm curtain wall sub-mullim outer and inner frame, 3.0 mm thick casement shutter (size 58.40 mm, 37.20 mm, 57.40 mm), 1.2 mm thick shutter glass strips, all aluminium member will be powder coated with coat not less than 25 micron in thickness including all accessories 4 bar hinge casement handle, 50 mm x 50 mm x 6 mm aluminium angle, steel rowel bolt, screws, rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in- charge. sqm 11115.00 11103.00 10993.00 10993.00 14.20 Supplying, fitting and fixing of aluminium curtain wall and aluminium top hung/ casement windows ad per the US Architectural Aluminium Manufacturer's Association (AAMA) standard specification and BDS 1879:2014 having 50 mm, 50 mm, 2 mm curtain wall sub-mullim outer and inner frame, 3.0 mm thick casement shutter (size 58.40 mm, 37.20 mm, 57.40 mm), 1.2 mm thick shutter glass strips, all aluminium member will be powder coated with coat not less than 25 micron in thickness including all accessories 4 bar hinge casement handle, 50 mm x 50 mm x 6 mm aluminium angle, steel rowel bolt, screws, rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in- charge. sqm 9639.00 9627.00 9516.00 9516.00

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 163 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 14.21 Supplying, fitting and fixing of aluminium curtain wall along with 10 mm thick clear tempered glass as per the US Architectural aluminium Manufacturer's Association (AAMA) Standard Specification and BDS1879:2014 having 115 mm , 64 mm, 3 mm curtain wall sub-mullim outer and inner frame, 3.0 mm thick casement shutter (size 58.40 mm, 37.20 mm, 57.40 mm), 1.2 mm thick shutter glass strips, all aluminium member will be powder coated with coat not less than 25 micron in thickness including all accessories 4 bar hinge casement handle, 50 m x 50mm x 6m aluminium angle, steel rowel bolt, screws, rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in-charge. sqm 12097.00 12091.00 12019.00 12019.00 14.22 Supplying, fitting and fixing of 12 mm thick clear tempered glass wall up to 3.0 m height with vertical fin glass support of same thickness and support shall be at least 1.2 m c/c fixed properly with glass by silicon glue with supply and fittings of all required accessories such as SS u channel, nut bolts, aluminium angle, steel rowel bolt, screws, rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in- charge. sqm 22107.00 22098.00 22009.00 22009.00 14.23 Supplying, fitting and fixing of 12 mm thick tempered glass wall from 3.0 m to 6.0 m height with spider point fixing joint and vertical fin glass support of same thickness, support shall be at least 1.2 m c/c fixed properly with main glass by silicon glue with supply and fittings of all required accessories such as SS u channel, nut bolts, aluminium angle, steel rowel bolt, screws, rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in-charge. sqm 22722.00 22717.00 22654.00 22654.00 14.24 Supplying, fitting and fixing of 12 mm thick clear tempered glass wall from 6.0 m to 8.2 m height with spider point fixing joint and vertical/ horizontal fin glass support of double thickness, support shall be at least 2 m c/c fixed properly with main glass by silicon glue with supply and fittings of all required accessories such as SS u channel, nut bolts, aluminium angle, steel rowel bolt, screws , rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in-charge. sqm 23113.00 23110.00 23051.00 23051.00 14.25 Supplying fitting and fixing of aluminium box fixed louver as per the U.S. Architectural Aluminium Manufacturer’s Association (AAMA) standard specification having 50mm x 25 mm, 1.5 mm thick outer section and horizantally @ 75 mm c/c fixed with above mentined frame and all aluminium members will be anodized to aluminium with a coat not less than 15 micron in thickness and density of 4 mg per square cm etc. including all accessories, neoprene, sealant, nuts and bolts etc. complete in all respect as per drawing and accepted by the Engineer. 14.25.1 Anodized to any colour sqm 9004.00 8999.00 8969.00 8969.00 14.25.2 Powder coated to any colour sqm 10144.00 10139.00 10109.00 10109.00

ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 164 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 14.26 Supplying fitting and fixing of aluminium ventilation louver as per the U.S Architectural Aluminium Manufacturer's Association ( AAMA) standard specification having 38 mmx 38mm, 2 mm thick outer frame, 39.67 mm x15.06 mm louver outer of minimum 1.2 mm thick and horizontal louver 55.02 mm x 37.39 mm of 1.50 mm thick @ 25 mm c/c fixed with above mentioned frame and aluminium members will be Powder coated colour etc. including all accessories, neoprene, sealant, nuts and bolts etc. complete in all respect as per drawing and accepted by the Engineer. 14.26.1 Anodized to any colour sqm 16094.00 16079.00 15978.00 15978.00 14.26.2 Powder coated to any colour sqm 18074.00 18059.00 17958.00 17958.00 ……………………. END OF CHAPTER FOURTEEN…………………

CEMENT PLASTER, FAIR-FACE PLASTER AND POINTING WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 165 CHAPTER 15: CEMENT PLASTER, FAIR-FACE PLASTER AND POINTING WORKS Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 15.1.1 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to both inner-and outer surface of wall, finishing the corner and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) Ground floor. sqm 324.00 322.00 305.00 305.00 15.1.2 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to outer surface of wall, finishing the corner and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) Ground floor. sqm 344.00 342.00 325.00 325.00 15.2 Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth wall with cement (1:4) up to 150 mm below ground level including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) Ground floor. sqm 391.00 389.00 369.00 369.00 15.3 Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to dado with cement (1:4) up to 150 mm including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) Ground floor. sqm 406.00 403.00 384.00 384.00 15.4 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:6) having with fresh cement to both inner and outer surface of wall, finishing the edges and corners including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) Ground floor. sqm 312.00 309.00 292.00 292.00 15.5 Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling, R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) Ground floor. sqm 309.00 307.00 288.00 288.00

CEMENT PLASTER, FAIR-FACE PLASTER AND POINTING WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 166 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 15.6 Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:3) with fresh cement to ceiling, R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) Ground floor. sqm 305.00 303.00 286.00 286.00 15.7 Flush pointing to brick wall with cement sand (F.M. 1.2) mortar (1:2) with cement including raking out the joints, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) Ground floor. sqm 207.00 205.00 192.00 192.00 15.8 Rule pointing to brick wall with cement sand (F.M. 1.2) mortar (1:2) with fresh cement and raking out the joints, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) Ground floor. sqm 246.00 244.00 229.00 229.00 15.9 Raised or tack pointing work to brick wall with cement sand (F.M. 1.2) mortar (1:2) with fresh cement of minimum 12 mm x 20 mm in size including raking out the joints and necessary scaffolding, curing at least for 7 days, cleaning each and every brick, cutting the bricks with pumice stone where necessary etc. all complete in all floors, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) Ground floor. sqm 639.00 630.00 593.00 593.00 15.10 Providing drip course or nosing at the edge of sunshade or cornice with cement sand (F.M. 1.2) mortar (1:2) with fresh cement, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. meter 176.00 175.00 163.00 163.00 15.11.1 Making groove in plaster on outside wall up to 50 mm X 6 mm size including scaffolding, curing etc. complete as per drawing and accepted by the Engineer-in-charge. meter 30.00 30.00 28.00 28.00 15.11.2 Making groove in plaster on outside wall up to 38 mm X 6 mm size including scaffolding, curing etc. complete as per drawing and accepted by the Engineer-in-charge. meter 46.00 46.00 43.00 43.00 15.12 Minimum 10 mm thick fair face plaster using premix cement plaster (CP2 LGT/Stucco base premix or equivalent); initial background should be 19 mm rough cement plaster (1:4); then after passing 7 days curing time surface of newly constructed rough plaster should be throughly cleaned using a stiff brush to remove any dust, loose particles, wood pieces, mould oil etc, then the sqm 2103.00 2097.00 2046.00 2046.00

CEMENT PLASTER, FAIR-FACE PLASTER AND POINTING WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 167 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur backgound needs to be thoroughly neutralized by applying potable water; Mixing premix cement plaster with water at water/powder ratio according to the specification of the manufacturer to form paste and apply on rough plaster surface; powder for making paste must be mixed with potable water only; apply the paste on the rough plaster surface by trowel to get smooth and shiny surface and cure the finished plaster surface for 2-3 days (3-4 times daily); finally water repellent coating to protect concrete surface; all complete with necessary scaffolding etc. accepted by the Engineer-in-charge. (Rate is excluding the cost of 19 mm thick rough cement plaster and water repellent paint) Ground Floor 15.13.1 Making groove in fair face plaster on outside wall up to 50 mm X 6 mm size including scaffolding, curing etc. complete as per drawing and accepted by the Engineer-in-charge. meter 57.00 56.00 54.00 54.00 15.13.2 Making groove in fair face plaster on outside wall up to 38 mm X 6 mm size including scaffolding, curing etc. complete as per drawing and accepted by the Engineer-in-charge. meter 69.00 69.00 65.00 65.00 15.14 Minimum 1mm thick fair face coating using Master Emaco N 303 Rendroc FC/ Top Crete 220 or equivalent product micro toping skim coat, a high performance single component polymer fortified, colored, cementitious micro topping that can be applied on a variety of horizontal and vertical plaster surfaces; initially background should be thoroughly cleaned using a stiff brush to remove any dust, loose particles, mould oil etc.; then the background needs to be thoroughly neutralized by applying potable water; The ratio of fair face coating and water is 1.5:1 to 2:1 or as required for workability; powder will be mixed with potable water in a drum by blending machine; the mixture can be spread to any horizontal and vertical plaster surface using trowel to get smooth and shiny surface; all complete with necessary scaffolding etc. accepted by the Engineer-in- charge. (Rate is excluding the cost of 19 mm thick rough cement plaster) Ground floor. sqm 1551.00 1549.00 1538.00 1538.00 15.15.1 Minimum 12mm thick cement sand (F.M-1.2) water proof, damp proof, dry and breathable plaster (1:4) with water proof Izonil Cement (STN-EN -1015-11, Compressive Strength 34 MPa, Max depth of water penetration into hardened plaster is < 1 mm) or equivalent compound to wall surface, finishing the corner and edges including washing of sand, cleaning the surface, scaffolding and curing at least for 3 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Izonil Cement/equivalent compound: Water proof, damp proof, dry and breathable cement). Ground Floor sqm 667.00 665.00 647.00 647.00

CEMENT PLASTER, FAIR-FACE PLASTER AND POINTING WORKS PWD SoR 2022 (2nd REVISED) for Civil Works 168 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 15.15.2 Minimum 19mm thick cement sand (F.M. 1.2) water proof, damp proof, dry and breathable plaster (1:4) with water proof Izonil Cement (STN-EN-1015-11, Compressive Strength 34 MPa, Max depth of water penetration into hardened plaster is < 1 mm)/ equivalent compound to wall surface, finishing the corner and edges including washing of sand, cleaning the surface, scaffolding and curing at least for 3 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Izonil Cement/equivalent compound: Water proof, damp proof, dry and breathable cement). Ground Floor sqm 857.00 855.00 836.00 836.00 15.16 Added rate for plaster and all types of pointing for additional floor above ground floor sqm 15.00 15.00 14.00 14.00 15.17 Pre-cast ventilators of minimum 25 mm thick of any design with cement sand (F.M.1.2) mortar (1:4) fitted and fixed in position, finishing with cement sand (F.M. 1.2) plaster (1:6) including necessary scaffolding and curing, in all floors accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) sqm 3068.00 3051.00 2870.00 2870.00 15.18 75 mm x 75 mm cornice of brick masonry in cement sand (F.M. 1.2) mortar (1:6) having minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:6) including scaffolding and curing at least for 7 days in all floors accepted by the Engineer-in- charge. (Cement: CEM-II/B-M) meter 287.00 284.00 266.00 266.00 15.19 Supplying, fitting, fixing of broken and sharp glass 19 mm to 32 mm height, avg. 19 mm width placed at a distance approximately 25 mm center to center, embedding the same to 12 mm to 19 mm thick cement plaster with neat cement finishing including necessary scaffolding approved and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) sqm 309.00 308.00 302.00 302.00 ……………………. END OF CHAPTER FIFTEEN…………………

PAINTING AND POLISHING PWD SoR 2022 (2nd REVISED) for Civil Works 169 CHAPTER 16: PAINTING AND POLISHING Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 16.1.1 Exterior standard acrylic emulsion paint of approved best quality and color having water resisting properties and resistance properties against fungi, fading & flaking delivered from authorized local agent of the manufacturer in a sealed container; applying to exterior surface with surface preparation including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary exterior sealer of specified brand on prepared surface; then applying necessary exterior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of exterior emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge. sqm 282.00 280.00 268.00 268.00 16.1.2 Exterior premium acrylic emulsion paint of approved best quality and color with high performance against dirt picking tendency and efflorescence resistance properties along with water resisting properties and resistance properties against fungi, fading and flaking from authorized local agent of the manufacturer in a sealed container; applying to exterior surface with surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary exterior sealer of specified brand on prepared surface; then applying necessary exterior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of exterior emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge. sqm 307.00 305.00 294.00 294.00 16.2.1 Interior standard acrylic emulsion paint (plastic or matt finish) of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container; applying to interior wall and ceiling with surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary interior sealer of specified brand on prepared surface; then applying necessary interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of interior emulsion paint spreading by brush/roller/spray& necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge. sqm 265.00 264.00 251.00 251.00

PAINTING AND POLISHING PWD SoR 2022 (2nd REVISED) for Civil Works 170 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 16.2.2 Interior premium acrylic emulsion painting (silky finish) of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container; applying to interior wall and ceiling with surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary interior sealer of specified brand on prepared surface; then applying necessary interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of interior emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge. sqm 291.00 290.00 277.00 277.00 16.2.3 Interior super premium acrylic emulsion painting (odorless) of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container; applying to interior wall and ceiling with surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary interior sealer of specified brand on prepared surface; then applying necessary interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper, finally applying 2 coats of interior emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors accepted by the Engineer- in-charge. sqm 323.00 321.00 309.00 309.00 16.3.1 Standard synthetic enamel paint of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container, having high water resistance, high bondibility, flexibility property; using specified brand thinner applying to metallic or wooden surface by brass/roller/spray in 2 coats over single coat anti- corrosive coating including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, all complete in all floors and accepted by the Engineer-in-charge. sqm 235.00 234.00 222.00 222.00 16.3.2 Premium synthetic enamel paint of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container, having high water resistance, high bondibility, flexibility property; using specified brand thinner applying to metallic or wooden surface by brass/roller/spray in two coats over single coat anti-corrosive coating including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, all complete in all floors and accepted by the Engineer-in-charge. sqm 245.00 243.00 231.00 231.00

PAINTING AND POLISHING PWD SoR 2022 (2nd REVISED) for Civil Works 171 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 16.4 Interior design paint of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container; applying to interior wall and ceiling with surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary interior sealer of specified brand on prepared surface; then applying necessary interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; applying 3 coats of interior design paint; 1st coat on prepared surface , then applying 1 design coat on the 1st coat and finally applying 1 protection coat on the design coat for protecting the design spreading by brush/roller/spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in- charge. sqm 885.00 880.00 842.00 842.00 16.5 Textured paint of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container; applying to interior wall and ceiling including surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus if required must be treated with fungicidal solution, mending good the surface defects using sand paper and necessary scaffolding; applying necessary sealer of specified brand on prepared surface; then applying necessary interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; applying 3 coats of texture paint; 1st coat on prepared surface, then applying 1 texture coat on the 1st coat and finally applying 1 top coat on the texture coat up to desired finishing by brush/roller/spray etc. with necessary scaffolding; all complete in all floors and accepted by the Engineer-in-charge. sqm 773.00 770.00 750.00 750.00 16.6 Chlorinated rubber paint of approved quality and colour delivered from authorized local agent of the manufacturer in a sealed container; surface preparation including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus (if required must be treated with fungicidal solution) flaking paints, washing the surface with soap water/caustic soda, mending good the surface defects, smoothening the surface by putty, sand papering the surface; applying to concrete surfaces and walls in three coats by brush/roller/spray etc. up to desired finishing, elapsing specified time for drying and re-coating; with necessary scaffolding all complete in all floors and accepted by the Engineer-in-charge. sqm 391.00 389.00 374.00 374.00 16.7.1 Epoxy enamel paint of approved quality and colour delivered from authorized local agent of the manufacturer in a sealed container; surface preparation including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus (if required must be treated with fungicidal solution) flaking paints, washing the surface with soap water/caustic soda, mending good the sqm 474.00 471.00 454.00 454.00

PAINTING AND POLISHING PWD SoR 2022 (2nd REVISED) for Civil Works 172 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur surface defects, smoothening the surface by putty, sand papering the surface; applying to Interior concrete surfaces and walls in three coats by brush/roller/spray etc. up to desired finishing; elapsing specified time for drying and recoating; with necessary scaffolding all complete in all floors and accepted by the Engineer-in- charge. 16.7.2 Epoxy enamel paint of approved quality and colour delivered from authorized local agent of the manufacturer in a sealed container; surface preparation including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus (if required must be treated with fungicidal solution) flaking paints, washing the surface with soap water/caustic soda, mending good the surface defects, smoothening the surface by putty, sand papering the surface; applying to Exterior concrete surfaces and walls in three coats by brush/roller/spray etc. up to desired finishing; elapsing specified time for drying and recoating; with necessary scaffolding all complete in all floors and accepted by the Engineer-in- charge. sqm 465.00 462.00 445.00 445.00 16.8.1 Silicon based water repellent of approved quality delivered from authorized local agent of the manufacturer in a sealed container; surface preparation including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying 3 coats of silicon based water repellent on exposed brick surface/fair face surface spreading by brush/roller/spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge. sqm 264.00 263.00 250.00 250.00 16.8.2 Solvent based water repellent of approved quality delivered from authorized local agent of the manufacturer in a sealed container; surface preparation including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying 3 coats of silicon based water repellent on exposed brick surface/ fair face surface spreading by brush/ roller/ spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge. sqm 461.00 459.00 445.00 445.00 16.9.1 Standard French polishing to Wooden board surface by three coats over a coat of priming including putty, cleaning, finishing and polishing with sand paper etc. all complete in all floors and accepted by the Engineer-in-charge. sqm 444.00 441.00 418.00 418.00 16.9.2 Premium French polishing to door and window frames, shutter and any other wooden surface by three coats over a coat of priming including putty, cleaning, finishing and polishing with sand paper etc. all complete in all floors and accepted by the Engineer-in-charge. sqm 533.00 529.00 500.00 500.00

PAINTING AND POLISHING PWD SoR 2022 (2nd REVISED) for Civil Works 173 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 16.10 Wood varnishing of approved quality and colour delivered from authorized local agent of the manufacturer in a sealed container using brand specified thinner to door and window frame and shutter in three coats, applied with brush including cleaning oil, grease, dirt, making dry, sand papering, if required washing with weak detergent solution, stripping out the colour straps, finishing the surface, etc. all complete in all floors and accepted by the Engineer-in-charge. 16.10.1 Yacht sqm 213.00 212.00 201.00 201.00 16.10.2 Egg-shell sqm 216.00 214.00 204.00 204.00 16.10.3 Matt sqm 217.00 215.00 204.00 204.00 16.11 Approved best quality and colour synthetic polyvinyl distemper delivered from authorized local agent of the manufacturer in a sealed container, applying to wall and ceiling with surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying 1 coat of interior sealer of specified brand on prepared surface; then applying 1 coat of interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of synthetic polyvinyl distemper spreading by brush/roller/spray & necessary scaffolding etc. up to desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge. sqm. 219.00 218.00 207.00 207.00 16.12 White washing by three coats, lime mixture prepared at least 12 hours before use, slacking stone lime, supplying of gums, blue, stirring thoroughly, removing the floating materials from the mixer, surface cleaning to free from all foreign materials before application of each coat, applying one vertical and one horizontal wash for each coat and successive coat is to be applied after drying up of previous coat including hair brass, providing necessary scaffolding and cleaning plinth, floors, doors, windows, portions and ventilators by washing, rubbing, oiling if necessary after white wash for all floors including cost of water, electricity and other charges etc. complete in all respect in all floors and accepted by the Engineer-in-charge. sqm. 25.00 25.00 24.00 24.00 16.13 Colour wash with yellow orchard/any other colour pigment by two coats over a prime coat of white wash, lime mixture prepared at least 12 hours before use, slacking stone lime, supplying of gums, blue, stirring thoroughly, removing the floating materials from the mixer, surface cleaning to free from all foreign materials before application of each coat, applying one vertical and one horizontal wash for each coat and successive coat is to be applied after drying up of previous coat including hair brass, providing necessary scaffolding and cleaning plinth, floors, doors, windows, portions and ventilators by washing, rubbing, oiling if necessary after white wash for all floors including cost of water, electricity and other charges etc. complete in all respect in all floors and accepted by the Engineer-in-charge. sqm. 29.00 29.00 28.00 28.00

PAINTING AND POLISHING PWD SoR 2022 (2nd REVISED) for Civil Works 174 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 16.14.1 Application of 02 coats of self leveling epoxy compound (3 mm thick) as base coat & finishing coat over a single layer of screed coat (primer) for making smooth floor surface; all chemicals delivered from authorized local agent of the manufacturer in sealed container; materials having high water resistance, high bondibility, flexibility property; applying by applicator machine after being mixed by force action mixer elapsing time for drying; surface preparation including surface cleaning from dust, oil or dirt, preparing underlying surface having minimum moisture content, smoothening, finishing & polishing by grinding machine & necessary tools, repairing significant ups/ downs in floor before application with scaffolding, testing charges etc. all complete in all floors approved & accepted by the Engineer- in-charge. sqm. 2034.00 2031.00 2017.00 2017.00 16.14.2 Application of 02 coats of self leveling epoxy compound (4 mm thick) as base coat & finishing coat over a single layer of screed coat (primer) for making smooth hygienic floor surface; all chemicals delivered from authorized local agent of the manufacturer in sealed container; materials having high water resistance, high bondibility, flexibility property; applying by applicator machine after being mixed by force action mixer elapsing time for drying; surface preparation including surface cleaning from dust, oil or dirt, preparing underlying surface having minimum moisture content, smoothening, finishing & polishing by grinding machine & necessary tools, repairing significant ups/ downs in floor before application with scaffolding, testing charges etc. all complete in all floors approved & accepted by the Engineer- in-charge. sqm. 2429.00 2426.00 2409.00 2409.00 16.14.3 Application of 02 coats of self leveling epoxy compound (5 mm thick) as base coat & finishing coat over a single layer of screed coat (primer) for making smooth floor surface; all chemicals delivered from authorized local agent of the manufacturer in sealed container; materials having high water resistance, high bondibility, flexibility property; applying by applicator machine after being mixed by force action mixer elapsing time for drying; surface preparation including surface cleaning from dust, oil or dirt, preparing underlying surface having minimum moisture content, smoothening, finishing & polishing by grinding machine & necessary tools, repairing significant ups/downs in floor before application with scaffolding, testing charges etc. all complete in all floors approved & accepted by the Engineer- in-charge. sqm. 3341.00 3337.00 3317.00 3317.00 16.15 Standard Duco paint with approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container, having high water resistance, high bondibility, flexibility property; using specified brand thinner applying to metallic or wooden surface by brass/ roller/ spray machine in 2 coats over single coat primer coating including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, all complete in all floors and accepted by the Engineer-in-charge. sqm. 2157.00 2154.00 2116.00 2116.00

PAINTING AND POLISHING PWD SoR 2022 (2nd REVISED) for Civil Works 175 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 16.16 Lacquer Polish (China or equivalent) of Standard design of wooden surface Top coat, Thinner, Clear sealer, Color pigment etc. complete from authorized local agent of the manufacturer in a sealed container, including paint spray machine etc. including surface cleaning from dust, oil or dirt, smoothening, finishing and polishing with sand paper and necessary tools, scaffolding etc. all complete in all floors approved and accepted by the Engineer. sqm. 2203.00 2195.00 2121.00 2121.00 ……………………. END OF CHAPTER SIXTEEN…………………

LIME TERRACING, ROOF TOP WATER PROOFING FOR GARDEN & SWIMMING POOL PWD SoR 2022 (2nd REVISED) for Civil Works 176 CHAPTER 17: LIME TERRACING, ROOF TOP WATER PROOFING FOR GARDEN & SWIMMING POOL Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 17.1.1 Supply and application of non-toxic two components acrylic polymer modified cementitious coating of minimum 1.5 mm thickness for water proofing of roof/ roof garden/ swimming pool which consists of powder and liquid acrylic emulsion; under a protective cover of plaster/ cement concrete/ tiles etc. as per standard specification and accepted by the Engineer-in-charge. (Rate is excluding the cost of protective cover) sqm 803.00 798.00 787.00 787.00 17.1.2 Supply and application of waterproofing treatment to roofs and terraces using three coats of acrylic based fiber reinforced elastomeric liquid water proofing membrane conforming to relevant ASTM standards product available in market. Surface preparation shall include cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus , mending the surface defects using sandpaper, filling cracks using suitable Crack Seal as necessary. First coat shall be diluted by 30% water and used as self-priming coat for the following two coats, achieving force coverage of 10sft/ltr. Incase of greater surface area, fiber mesh can be used in between the priming coat and second coat, followed by two more coats for better durability. All shall be completed as per manufacturer’s specifications & recommendations and accepted by the Engineer-in- charge. 17.1.2.1 Rate for cover area less than or equal to 500 sqm (without glass fiber mesh) sqm 1110.00 1106.00 1095.00 1095.00 17.1.2.2 Rate for cover area greater than 500 sqm (with glass fiber mesh of 10 mm X 10 mm grid and weight 110 gm/sqm placed in between first two layers) sqm 1238.00 1232.00 1221.00 1221.00 17.2 Preparation and making gravel pack for roof top gardening with supply of 25 mm down graded pea gravels including sieving, washing, compacting etc. complete as per standard specification and accepted by the Engineer-in-charge. Ground floor cum 5193.00 5174.00 4725.00 4725.00 17.2.1 Added rate for gravel pack work in each additional floor above ground floor cum 61.00 60.00 56.00 56.00 17.3 Supply and application of 19mm thick (9.5 mm X 2 layer) water proof, damp proof, dry and breathable plaster on roof slab/ underground water reservoir/ overhead water reservoir/ basement/ retaining wall with water proof, damp proof, dry and breathable Izonil cement (STN-EN -1015-11, compressive strength 34 MPa, max depth of water penetration into hardened plaster is < 1 mm) or equivalent compound in a proportion of 1:2.4 (Izonil cement or equivalent compound 1: sand 2.4) after cement grouting on existing concrete surface including finishing the corner and edges, washing sand, cleaning the surface scaffolding and curing at least 3 days etc. all completed in all respects as per sqm 1274.00 1271.00 1253.00 1253.00

LIME TERRACING, ROOF TOP WATER PROOFING FOR GARDEN & SWIMMING POOL PWD SoR 2022 (2nd REVISED) for Civil Works 177 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur direction of Engineering-in-charge. Above mentioned plaster includes glass fiber mesh of 10 mm X 10 mm grid and weight 110 gm/sqm placed in between two layers. 17.4 Average 100 mm thick finished lime terracing with 20 mm downgraded first class brick chips (khoa), surki from 1st class bricks and minimum lime content 500 kg per 2.83 cubic meter (stone lime brought at site, not being powdered in open air and to be slaked in presence of engineer-in-charge and to be measured in volume three days after slaking for using in the mix) in the proportion 7:2:2 (brick chips:surki: lime) including preparation of the mix on the ground by making a suitable platform under proper polythene cover. Cutting the mix twice daily with limewater (1:10) at least for 7 days until the mix attain desirable consistency. Laying the mix in proper slope, beating the same with standard ‘koppa’ for minimum 7 days to gain maximum consolidation, making ghoondy and neat finishing with lime Surki mortar (1:2) and curing for 21 days providing polythene cover after each day work and cleaning etc. complete in all respect accepted by the Engineer-in-charge. 1st Floor cum 19740.00 19612.00 18785.00 18785.00 17.4.1 Added rate for lime terracing work in each additional floor above 1st floor cum 122.00 120.00 111.00 111.00 17.5.1 25 mm thick ferrocement treatment work for water proofing on roof having minimum cement content relates to mix ratio 1:2 cement conforming to BDS EN-197-1-CEM-I, 52.5N, and best quality coarse sand (F.M. 2.2) including, the supply of all materials, cutting, binding of one layer of 20 BWG galvanized wire mesh having minimum yield strength fy = 450 MPa & having 2 mesh per 25 mm in both ways, clear cover 12 mm at the middle of the ferrocement lining, with washing of sand, chipping, cleaning the surface, watering, grouting, casting, laying on proper level of roof top or floor in panels (1.25 m x 1.25 m). Compaction including leveling, curing at least for 21 days including cost of water, electricity, in all respect as per drawing, design and accepted by the Engineer-in-charge. sqm 1586.00 1578.00 1538.00 1530.00 17.5.2 25 mm thick ferrocement treatment work for heat and water proofing on roof having minimum cement content relates to mix ratio 1:2 cement conforming to BDS EN-197- 1-CEM-I, 52.5N, and best quality coarse sand (F.M. 2.2) including, the supply of all materials, cutting, binding of one layer of 20 BWG galvanized wire mesh having minimum yield strength fy = 450 MPa & having 2 mesh per 25 mm in both ways, clear cover 12mm at the middle of the ferrocement lining, applying 62 mm thick EPS sheet having density 15 kg per cum, with washing of sand, chipping, cleaning the surface, watering, grouting, casting, laying on proper level of roof top or floor in panels (1.25 m x 1.25 m). Compaction including leveling, curing at least for 21 days including cost of water, electricity, in all respect as per drawing, design and accepted by the Engineer-in-charge. sqm 1997.00 1988.00 1945.00 1937.00 ……………………. END OF CHAPTER SEVENTEEN…………………

FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS PWD SoR 2022 (2nd REVISED) for Civil Works 178 CHAPTER 18: FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 18.1.1 Supplying, fitting and fixing plain Particle board ceiling (Drop/ Plain) (complying unit wt. 499 to 550 kg/m3, bending strength 0.35 N/mm2, max swelling 8%, moisture content not more than 10%), of 12 mm thick with best quality and well seasoned Garjan wood frame of section 50 mm x 38 mm at 600 mm x 600 mm in grid suspended from ceiling or roof or beam by 12 SWG double ply G.I. wire fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical strut as required, cutting holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost and carriage of all materials, accessories, labour for installation, electricity charge, scaffolding, screws, nails, with best quality and approved colour etc. all complete, as per drawing design and accepted by the Engineer-in-charge. All sizes of wood are finished. All Garjan wood frames must be protected from termites, cockroach and other insects. Measurement will be taken as per finished surface area. The brick/ RCC surface shall be dry and damp proof. (Rate is excluding cost of polish/ paint etc. of any type). sqm 2910.00 2853.00 2841.00 2841.00 18.1.2 Supplying, fitting and fixing of Melamine/ Plain gypsum/ veneered board false ceiling (Drop/ Plain) laminated by mechanical hot press milk white PVC membrane, framing by aluminium/ powder coated aluminium T-bar of any colour and of natural anodized finish suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. (Rate is excluding cost of polish/ paint etc. of any type where necessary). 18.1.2.1 12 mm thick melamine board ceiling sqm 2053.00 2048.00 2003.00 2003.00 18.1.2.2 8 mm thick melamine board ceiling sqm 1630.00 1625.00 1579.00 1579.00 18.1.2.3 9 mm thick plain gypsum board ceiling sqm 2335.00 2329.00 2281.00 2281.00 18.1.2.4 12 mm thick plain gypsum board ceiling sqm 2416.00 2411.00 2362.00 2362.00 18.1.2.5 12 mm thick veneered board ceiling sqm 3231.00 3210.00 3102.00 3102.00 18.1.3 Supplying, fitting & fixing of 12 mm thick BT ply board/ garjan ply board ceiling (Drop/ Plain) screwed up with best quality and well seasoned 50 mm x 38 mm Garjan Wooden

FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS PWD SoR 2022 (2nd REVISED) for Civil Works 179 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur Frame at 600 mm x 600 mm in grid suspended from ceiling roof or beam by 12 SWG double ply G.I wire fixed to the ceiling by M.S clumps, screws, hooks, nails etc. maintaining straight lines and desired finished level at bottom face including vertical strut as required, cutting holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost and carriage of all materials, accessories, installation, electricity charge, scaffolding, labour for installation with and necessary hardware all complete, as per drawing design and accepted by the Engineer-in-charge. All sizes of wood are finished. All Garjan wood frames must be protected from termites, cockroach and other insects. Measurement will be taken as per finished surface area. The brick/ RCC surface shall be dry and damp proof. (Rate is excluding cost of polish/ paint etc. of any type). 18.1.3.1 12 mm thick BT Ply board ceiling sqm 3149.00 3102.00 3139.00 3139.00 18.1.3.2 12 mm thick Garjan Ply board ceiling sqm 2595.00 2548.00 2585.00 2585.00 18.1.4 Supplying, fitting and fixing 12 mm thick plain fire rated gypsum board ceiling (Drop/ Plain) (size 1200 mm x 2400 mm), framing by aluminium/ powder coated aluminium any colour T-bar of natural anodized finish suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including making provisions for lighting arrangement, also including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. sqm 2840.00 2824.00 2779.00 2779.00 18.1.5 Supplying, fitting and fixing of Perforated gypsum board false ceiling (Drop/ Plain), framing by aluminium/ powder coated aluminium any colour T-bar of natural anodized finish suspended in (600 mm x 600 mm)/ (600 mm x 1200 mm) grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. 18.1.5.1 9 mm thick perforated gypsum board ceiling (600 mm x 600 mm grid) sqm 2376.00 2370.00 2321.00 2321.00

FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS PWD SoR 2022 (2nd REVISED) for Civil Works 180 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 18.1.5.2 8 mm thick perforated gypsum board ceiling (600 mm x 600 mm grid) sqm 2253.00 2248.00 2199.00 2199.00 18.1.5.3 8 mm thick perforated gypsum board ceiling (600 mm x 1200 mm grid) sqm 2373.00 2368.00 2319.00 2319.00 18.1.6 Supplying, fitting and fixing of best quality PVC board false ceiling (Drop/ Plain) of size 600 mm x 600 mm of approved design, minimumn PVC content of 35%, framing by aluminium/ powder coated aluminium T-bar of any colour and of natural anodized finish suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. 18.1.6.1 6 mm thick PVC board false ceiling sqm 2559.00 2538.00 2491.00 2491.00 18.1.6.2 8 mm thick PVC board ceiling sqm 2695.00 2674.00 2627.00 2627.00 18.1.7 Supplying, fitting and fixing of 0.6 mm thick best quality solid aluminium metal board false ceiling (drop/ plain) of size 600 mm x 600 mm, powder coated of approved design, framing by aluminium T-bar of natural anodized finish suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. sqm 3331.00 3315.00 3277.00 3277.00 18.1.8 Supplying, fitting and fixing of 0.6 mm thick best quality perforated aluminium metal board (including tissue/ fabric) false ceiling (Drop/ Plain) of size 600 mm x 600 mm, powder coated of approved design, inner side is covered by black tissue/ fabric to protect the hole from air circulation, framing by aluminium/ powder coated aluminium T-bar of any colour and of natural anodized finish suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost of all materials, electricity, accessories, sqm 3019.00 3003.00 2965.00 2965.00

FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS PWD SoR 2022 (2nd REVISED) for Civil Works 181 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. 18.1.9 Supplying, fitting & fixing of designed seamless false ceiling (Drop/ Plain) with 6 mm thick fiber cement board, framing by furring channel (38 mm x 12.5 mm x 0.5 mm) G. I. angle (19 mm x 19 mm x 0.5 mm) suspended in 600 mm x 600 mm grid from ceiling using G.I fitting angle, locking clips etc. including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. (Rate is excluding cost of polish/ paint etc. of any type). sqm 3504.00 3483.00 3423.00 3423.00 18.2.1 Supplying, fitting and fixing 12 mm thick burma teak (BT) veneered board/ ply board/ particle board in walling with best quality and well seasoned garjan wood frame of section of 50 mm x 25 mm at 600 mm x 600 mm in grid, including grove where necessary, fitted and fixed to wall by plugs, nails, screws etc. maintaining leveled and finished exposed faces including. making holes in wall and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost and carriage of all materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. all complete as per design, approved sample and accepted by the Engineer-in- charge. All sizes of wood are finished. All Garjan wood frames must be protected from termites, cockroach and other insects. Measurement will be taken as per finished surface area. The brick/ RCC surface shall be dry and damp-proof. (Rate is excluding cost of polish/ paint etc. of any type). 18.2.1.1 12 mm thick Myanmar (Burma) teak (BT) veneered board in walling sqm 2797.00 2763.00 2741.00 2741.00 18.2.1.2 12 mm thick BT ply board walling sqm 3184.00 3174.00 3116.00 3116.00 18.2.1.3 12 mm thick particle board walling sqm 2412.00 2372.00 2340.00 2340.00 18.2.2 Supply fitting and fixing of 0.8 mm HPL sheet lamination (one surface only) over 12mm thick MDF board wall paneling with best quality and well seasoned garjan wood frame of section 38 mm x 38 mm at 600 mmx 600 mm in grid, including grove where necessary, fitted and fixed to wall by royal plugs, nails, screws etc. maintaining leveled and finished exposed faces including making holes in wall and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement, also including cost and carriage of all materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. all complete as per design, approved sample and accepted by the Engineer-in-charge. (All sizes of wood are finished). All Garjan wood frames must be protected from termites, cockroach and other insects. Measurement will be taken as per finished surface area. The brick/ RCC surface shall be dry and damp proof. Sqm 4444.00 4403.00 4356.00 4356.00

FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS PWD SoR 2022 (2nd REVISED) for Civil Works 182 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 18.3.1 Supplying, fitting and fixing best quality wall paper along with 12 mm thick PVC solid board in walling with furring channel frame (38 mm x 12.5 mm x 0.5 mm) at 600 mm x 600 mm in grid, including grove where necessary, fitted and fixed to wall by plugs, nails, screws etc. including treatment of inner surface with termite and damp proofing agent maintaining leveled and finished exposed faces including making holes in wall and mending good the damages, if any during execution of the work, also including cost and carriage of wall paper and other materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. all complete as per design, approved and accepted by the Engineer-in-charge. sqm 3574.00 3571.00 3560.00 3560.00 18.3.2 Supplying, fitting and fixing best quality wall paper on finished plaster surface including wall preparation cost and carriage of wall paper and other materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. all complete as per design, approved and accepted by the Engineer-in-charge. sqm 1176.00 1172.00 1166.00 1166.00 18.4.1 Supplying, fitting and fixing of wooden louver in ceiling made of 12 mm Burma teak (BT) ply board, louver of any size and spacing framing with MS "U" bar/ channel, fixed to the ceiling by thread rod, nails, plugs, screws maintaining parallel louver with straight line/ desired finishing level at bottom face, necessary hardwares, including making holes in slabs and/ beams by electric drill machine and mending good the damages, if any during execution of the work, also including cost of all materials, electricity, accessories, scaffoldings, labour for installation etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. All Garjan wood frames must be protected from termites, cockroach and other insects. The brick/ RCC surface shall be dry and damp-proof. (Rate is excluding cost of polish/ paint etc. of any type). Sqm 7378.00 7372.00 7358.00 7358.00 18.4.2 Supplying fitting and fixing Ornamental design Louver in Ceiling with 18mm Burma Teak (BT) Veneer board fitted in drop Ceiling with garjan wood framing of size 50 mm x 50 mm and 50 mm x 25 mm and with 50 mm ctg. teak wood as longitudinal rib, 18mm BT Veneered board as cross rib of any spacing the design louver fixed in drop ceiling wall by plugs, nails, screws, gum, etc. maintaining leveled and finished exposed faces including, 18 mm PVC edging, making holes in wall including provisions for lighting arrangement and mending good the damages, if any, during execution of the work including all materials electricity, accessories, labour for installation, Scaffolding, etc. as per drawing design & approved sample and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. All Garjan wood frames must be protected from termites, cockroach and other insects. The brick/ RCC surface shall be dry and damp-proof. (Rate is excluding cost of polish/ paint etc. of any type). sqm 9455.00 9268.00 9612.00 9612.00

FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS PWD SoR 2022 (2nd REVISED) for Civil Works 183 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur 18.4.3 Supplying, fitting and fixing of M.S. fixed louver made of 25 mm x 25 mm x 5 mm M.S. Angle as outer frame, 2 mm thick 25 mm x 18 mm MS sheet box section at 75 mm c/c as internal horizontal member fixing with outer frame including scaffolding, rowel bolt, anchoring, welding, grinding, welder, helper and all accessories complete in all respect as per drawing and accepted by the Engineer-in-charge. (Rate is excluding cost of polish/ paint etc. of any type). sqm 8821.00 8821.00 8821.00 8821.00 18.4.4 Supplying, fitting, fixing of louver wall panel made of 18 mm Burma teak (BT) veneered board of any size, including garjan wood frame of section 50 mm x 38 mm at 250 mm spacing, fitted & fixed to wall by nails, iron screw, 38mm brass screw, gum, glue etc., maintaining vertical parallel louver and finished exposed faces, including making holes in walls and mending good the damages, if any during execution of the work, including provisions for lighting arrangement, including groove cutting of any size, also including cost of carriage of all materials, electricity, accessories, labour of installation, scaffolding etc. all complete as per design, approved sample and excepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. All Garjan wood frames must be protected from termites, cockroach and other insects. The brick/ RCC surface shall be dry and damp proof. (Rate is excluding cost of polish/ paint etc. of any type). sqm 6915.00 6873.00 6912.00 6912.00 18.4.5 Supplying, fitting, fixing of louver wall panel made of 18 mm Burma teak (BT) veneered board of any size, including garjan wood frame of section 50 mm x 38 mm at 250 mm spacing, fitted & fixed to wall by nails, iron screw, 38 mm brass screw, gum, glue etc., maintaining vertical parallel louver and finished exposed faces, including making holes in walls and mending good the damages, if any during execution of the work, including provisions for lighting arrangement, including groove cutting of any size, also including cost of carriage of all materials, electricity, accessories, labour of installation, scaffolding, including CNC jali cutting and boxes, punch, grooving, ornamental bit or any type of special design of walling as per architectural requirement etc. all complete as per design, approved sample and excepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. All Garjan wood frames must be protected from termites, cockroach and other insects. The brick/ RCC surface shall be dry and damp proof. (Rate is excluding cost of polish/ paint etc. of any type). sqm 8001.00 7959.00 7998.00 7998.00 18.4.6 Supplying fitting and fixing of fixed glass louver with Aluminium hollow box as per the U.S Architectural Aluminium Manufactures Association (AAMA) Standard specification having 1.20 mm thick wall frame (size 100 mm x 25 mm) and 10 mm thick, 100 mm wide tempered glass louver section inner inclined glass louver section fixed with above mentioned frame and all aluminium members will be anodized to aluminium of any colour with a coat not less than 15 micron in thickness and density of 4 mg/cm2 etc. including all accessories, neoprene, sealant, nuts and bolts etc. sqm 16855.00 16849.00 16825.00 16825.00

FALSE CEILING, WALL PANELING & ACOUSTIC ITEMS PWD SoR 2022 (2nd REVISED) for Civil Works 184 Item No Description of Item Unit Unit Rate (Tk.) Dhaka, Mymensingh Chattogram, Sylhet Khulna, Barisal, Gopalgonj Rajshahi, Rangpur complete in all respect as per drawing and accepted by the Engineer-in-charge. 18.4.7 Supplying fitting and fixing double leaf sliding SS louver door shutter made with 16 BWG thick 50 mm x 38 mm SS hollow box as outer frame, 18 BWG thick 50 mm x 12 mm SS hollow box as louver with 18 BWG thick 38 mm x 38 mm SS V Channel for bottom rail, 25mm dia SS solid bar, 18 BWG thick 62 mm x 38 mm SS U channel as top rail, 450 mm long 25 mm dia SS handle, 75 mm SS wheel, 50 mm x 50 mm size 3 mm thick plate for locking arrangement with pad lock including grooving, making hole all necessary accessories and accepted by the Engineer-in-charge. (Rate is excluding cost of polish/ paint etc. of any type). sqm 26389.00 26384.00 26345.00 26345.00 18.4.8 Supplying, fitting and fixing of Aluminium fins fixed vertically BDS 1879 : 2014 having 1.2 mm thick wall frame (Size 125 mm x 50 mm box section @ 75 mm c/c), fitted with 3 nos horizontal M.S. Angle (20 mm x 20 mm x 3 mm) will be anodized to aluminium of any colour with a coat not less than 15 microns in thickness or powder coated to any colour with a coat not less than 25 microns in thickness and density of4 mg per square cm etc. including all accessories, rowel bolt, 55 mm M6 rowel bolt, screws, washer etc all complete and accepted by engineer-in-charge. (Rate is excluding cost of polish/ paint etc. of any type). sqm 21679.00 21675.00 21658.00 21658.00 18.5.1 Supply and making wooden skirting with well matured seasoned wood including necessary moulding with garjan wood frame of 50 mm x 38 mm, groove with proper corner, finishing as per design, fitting and fixing in position by using all necessary accessories, royal plugs, screws, including making holes by electric drill machine and mending good the damages, if any during execution of the work, also including cost of all materials, electricity, labour for installation in all floors etc. all complete as per drawing, design and accepted by the Engineer-in-charge. All Garjan wood frames must be protected from termites, cockroach and other insects. The brick/ RCC surface shall be dry and damp proof. (Rate is excluding cost of polish/ paint etc. of any type). 18.5.1.1 12 mm thick Myanmar (Burma) Teak Wooden skirting sqm 5653.00 5563.00 5637.00 5637.00 18.5.1.2 12 mm thick Ctg. Teak. Wooden skirting sqm 4287.00 4197.00 4313.00 4313.00 18.5.2 Supply and making 25 mm thick wooden Design bit/ Moulding with well matured seasoned wood including necessary moulding/ groove with proper corner, finishing as per design, fitting and fixing in position by using all necessary accessories in all floors etc. all complete and accepted by engineer-in-charge. (Rate is excluding cost of polish/ paint etc. of any type). 18.5.2.1 Myanmar (Burma) Teak wooden Design bit/ Moulding sqm 16981.00 16766.00 16427.00 16427.00 18.5.2.2 Ctg Teak wooden Design bit/ Moulding sqm 11553.00 11361.00 11294.00 11294.00 18.6.1 Supplying, fitting and fixing Wall Almirah with one side attires cabinet including locker and another side shelf of