PROMETIM | UGANDA OPERATIONAL PLAN | ROAD MAP PROMETIM | UGANDA OPERATIONAL PLAN | INDEX 1 UGANDA OPERATIONS ROAD MAP This document provides an overview of the Operational Plan, which originated from a two-day operational seminar led by Chris Brown and Sean Holder. The seminar considered the strategic, commercial and operational requirements of establishing a sustainable business in Uganda, while aligning PROMETIM’s corporate standards with local conditions. The outcomes were organised into eight interconnected workstreams. Together, these eight volumes provide a foundation for establishing clear management responsibilities, consistent processes and controls, and a basis for monitoring performance and creating long-term value for PROMETIM, its stakeholders and partners, and the countries and communities in which we operate. Each volume of the Operational Plan is introduced with a plan overview and accompanying infographic. This is followed by 15 procedure outlines and their accompanying infographics. The purpose of the individual procedures is to set out the proposed framework for each area, and the infographics visually show how these workstreams fit together. We are creating the systems, structures and operating disciplines on which PROMETIM Uganda can build its capabilities, deliver services reliably and grow sustainably. This is also an investment in a repeatable way of operating: the model developed in Uganda is intended to provide a common foundation for future expansion into other countries, with the necessary adaptation to each country’s legal, regulatory, commercial and operational environment. The next phase focuses on management review, confirming ownership and priorities, closing gaps, developing the detailed procedures, systems, and supporting documents and implementing the operational plan. INDEX Guiding Principles Infographic 3 Guiding Principles explained 4 Operational Overview Infographic ? Operational Overview explained ?

PROMETIM | UGANDA PROMETIM | UGANDAOVW-001 | OPERATIONAL GUIDING PRINCIPLES OVW-001 | OPERATIONAL GUIDING PRINCIPLESPROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline DOCUMENT APPLICATION: OFFICE / SITE / WORKSHOP PRU-OVW-001 | Operational Guiding Principles Document number PRU-OVW-001 Revision 00 Document status Draft for management review First issue date Not yet issued Current effective date Pending approval Document owner PROMETIM management (to be confirmed) Revision trigger/frequency Material change or management review Interfaces Operational Overview, country operational plans and governing management system Document Authorisation Prepared by Reviewed by Approved by Name Position Date Signature Revision history Revision Date Description of changes Section(s) 1. Purpose and intended outcome 1.1 Establish a common operating philosophy for PROMETIM asset integrity and maintenance services, providing the foundation for country-specific operational plans and governing management-system documents. 1.2 Set expectations for safe, reliable, compliant and commercially responsible service delivery without implying that detailed controls are already implemented or independently certified. 1.3 Provide the narrative foundation for PRU-INF-045 Operational Guiding Principles and the eight-volume operational architecture. 2. Scope, applicability and boundaries 2.1 These principles are intended as a reusable PROMETIM baseline for operations in Uganda and potential future country applications, including Tanzania, Mozambique and Namibia. Each entity must validate local laws, licences, contracts and client requirements before adopting them. 2.2 The current PRU document is an Uganda-controlled draft. It does not by itself confer Group-wide approval or authorisation in another country. 2.3 The principles cover management, commercial, project, supply chain, people, asset integrity, inspection, maintenance, records and continual improvement activities.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline 2.4 This overview states management intent and required outcomes; it is not a substitute for approved procedures, work instructions, risk assessments, permits, inspection plans or contract specifications. 3. Operating philosophy and management commitments 3.1 People: protect workers, contractors, communities and the environment through competent supervision, clear accountabilities and appropriate risk controls. 3.2 Performance: deliver reliable, traceable, technically sound and client-aligned services while managing quality, schedule, cost and operational risk. 3.3 Progress: learn from evidence, incidents, nonconformities and performance reviews to improve methods, competence and long-term capability. 3.4 Management shall distinguish intended arrangements, approved controls and demonstrated implementation when reporting progress to clients, management or the Board. 4. Plan and prepare 4.1 Define the assignment, applicable client and statutory requirements, scope, assets, criticality, interfaces, acceptance criteria and authorised work boundaries before mobilisation. 4.2 Identify required personnel, competence, tools, equipment, calibration, materials, work packs, permits, resources and emergency arrangements. 4.3 Establish responsibilities, technical authority, decision rights and required approvals; resolve unresolved prerequisites before starting affected work. 5. Risk and asset integrity management 5.1 Identify and evaluate HSE, technical, integrity, regulatory, commercial and delivery risks using the approved risk methodology applicable to the assignment. 5.2 Prioritise critical assets and barriers, establish risk controls and escalation thresholds, and reassess risks when conditions or scope change. 5.3 Integrate client integrity requirements and relevant technical codes into inspection, maintenance and assurance plans, subject to verified applicability. 6. Inspection, testing and maintenance execution 6.1 Perform inspection and testing only against approved plans, methods, acceptance criteria and authorised technical requirements, using competent personnel and suitable calibrated equipment. 6.2 Execute preventive, predictive and corrective maintenance in accordance with applicable OEM instructions, approved work packs, isolation and permit controls and client requirements. 6.3 Record findings, deviations, asset condition, work completion and handover evidence so that technical decisions and maintenance history remain traceable. 7. Nonconformity, change and corrective action 7.1 Identify, contain, record and communicate nonconformities, defects, missed requirements and

PROMETIM | UGANDA PROMETIM | UGANDAOVW-001 | OPERATIONAL GUIDING PRINCIPLES OVW-001 | OPERATIONAL GUIDING PRINCIPLESPROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline 7.3 Apply formal management of change to material alterations in scope, personnel, equipment, methods, requirements or operating conditions. 8. Data, records and reporting 8.1 Capture and protect inspection, maintenance, compliance, competence and project records using controlled formats, access rights, retention rules and approved client systems where required. 8.2 Ensure information is accurate, complete, retrievable and traceable to the asset, task, responsible person, revision and approval where applicable. 8.3 Report material performance, risks, exceptions and contractual deliverables to the relevant management and client interfaces at agreed intervals. 9. Performance monitoring and continual improvement 9.1 Define project- and entity-appropriate indicators for safety, asset performance, delivery, compliance, quality, cost and client satisfaction, with approved owners and measurement methods. 9.2 Review results, incidents, trends, nonconformities and lessons learned; assign dated improvement actions and verify their effectiveness. 9.3 The numerical targets shown in PRU-INF-045 are illustrative until approved by authorised management and incorporated into applicable contracts or plans. 10. Application through the eight-volume operating model 10.1 V1 — Strategic Alignment, Vision & Regulatory Compliance: define mandate, legal and contractual compliance baseline, technical applicability and operating readiness. 10.2 V2 — General Management & Communication Matrix: establish governance, decision rights, communication routes and escalation. 10.3 V3 — Commercial Workflow: manage enquiries, quotations, contract review, invoicing and receivables interfaces. 10.4 V4 — Internal Cost Control & Treasury: manage expenditure approvals, budgets, banking, treasury and financial controls. 10.5 V5 — Project Tracking, Systems & Delivery Architecture: plan, mobilise, execute, monitor and close out delivery activities and technical assurance. 10.6 V6 — Supply Chain, Logistics & Physical Infrastructure: control sourcing, logistics, supplier qualification, inventory and facility readiness. 10.7 V7 — Personnel Management, Recruitment & Labour Compliance: manage workforce planning, employment compliance, competence and mobilisation. 10.8 V8 — Customer Interfacing, Market Presence & Action Plan Consolidation: manage client relationships, market actions, ownership and integrated improvement priorities. 11. Responsibilities, authority and local adaptation 11.1 PROMETIM management is responsible for approving these principles, assigning ownership and confirming the authority under which any entity adopts them. 11.2 Country management teams shall translate the principles into locally applicable plans, accountabilities, legal registers, client requirements and implementation evidence.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline 11.3 Project and functional managers shall implement only authorised controls within their remit and escalate gaps, conflicting requirements and unapproved departures. 11.4 Uganda applications shall consider Petroleum Authority of Uganda requirements and applicable Tilenga, EACOP and TotalEnergies contractual specifications only where confirmed for the relevant contract and activity. 12. Document hierarchy, maturity and verification 12.1 The hierarchy is: Operational Guiding Principles; Two-Day Operational Seminar design basis; eight- volume Operational Overview; individual Volume Operational Plans; controlled procedures, work instructions and records. Infographics form a parallel visual layer and do not supersede controlled text. 12.2 Distinguish concept, framework drafted, detailed procedure drafted, reviewed, approved, implemented and verified maturity states; Board-readiness does not establish implementation-readiness. 12.3 The approved Master Document Register controls document numbering, status and revisions. Future governing procedures will define detailed drafting, review, approval, distribution, retention and supersession controls. 12.4 PRU-INF-045 is the accompanying visual summary. PRU-OVW-002 is the intended identifier for the separate eight-volume Operational Overview, subject to register update and controlled renaming. 13. Reference basis and verification limitations 13.1 Source basis: Two-Day Operational Seminar Plan; approved eight-volume design baseline; PROMETIM service information; PRU-INF-045 Operational Guiding Principles; and the Operational Documentation Developmen

PROMETIM | UGANDA PROMETIM | UGANDAOVW-001 | OPERATIONAL GUIDING PRINCIPLES OVW-001 | OPERATIONAL GUIDING PRINCIPLESPROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline DOCUMENT APPLICATION: OFFICE / SITE / WORKSHOP PRU-OVW-001 | Operational Guiding Principles Document number PRU-OVW-001 Revision 00 Document status Draft for management review First issue date Not yet issued Current effective date Pending approval Document owner PROMETIM management (to be confirmed) Revision trigger/frequency Material change or management review Interfaces Operational Overview, country operational plans and governing management system Document Authorisation Prepared by Reviewed by Approved by Name Position Date Signature Revision history Revision Date Description of changes Section(s) 1. Purpose and intended outcome 1.1 Establish a common operating philosophy for PROMETIM asset integrity and maintenance services, providing the foundation for country-specific operational plans and governing management-system documents. 1.2 Set expectations for safe, reliable, compliant and commercially responsible service delivery without implying that detailed controls are already implemented or independently certified. 1.3 Provide the narrative foundation for PRU-INF-045 Operational Guiding Principles and the eight-volume operational architecture. 2. Scope, applicability and boundaries 2.1 These principles are intended as a reusable PROMETIM baseline for operations in Uganda and potential future country applications, including Tanzania, Mozambique and Namibia. Each entity must validate local laws, licences, contracts and client requirements before adopting them. 2.2 The current PRU document is an Uganda-controlled draft. It does not by itself confer Group-wide approval or authorisation in another country. 2.3 The principles cover management, commercial, project, supply chain, people, asset integrity, inspection, maintenance, records and continual improvement activities.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline 2.4 This overview states management intent and required outcomes; it is not a substitute for approved procedures, work instructions, risk assessments, permits, inspection plans or contract specifications. 3. Operating philosophy and management commitments 3.1 People: protect workers, contractors, communities and the environment through competent supervision, clear accountabilities and appropriate risk controls. 3.2 Performance: deliver reliable, traceable, technically sound and client-aligned services while managing quality, schedule, cost and operational risk. 3.3 Progress: learn from evidence, incidents, nonconformities and performance reviews to improve methods, competence and long-term capability. 3.4 Management shall distinguish intended arrangements, approved controls and demonstrated implementation when reporting progress to clients, management or the Board. 4. Plan and prepare 4.1 Define the assignment, applicable client and statutory requirements, scope, assets, criticality, interfaces, acceptance criteria and authorised work boundaries before mobilisation. 4.2 Identify required personnel, competence, tools, equipment, calibration, materials, work packs, permits, resources and emergency arrangements. 4.3 Establish responsibilities, technical authority, decision rights and required approvals; resolve unresolved prerequisites before starting affected work. 5. Risk and asset integrity management 5.1 Identify and evaluate HSE, technical, integrity, regulatory, commercial and delivery risks using the approved risk methodology applicable to the assignment. 5.2 Prioritise critical assets and barriers, establish risk controls and escalation thresholds, and reassess risks when conditions or scope change. 5.3 Integrate client integrity requirements and relevant technical codes into inspection, maintenance and assurance plans, subject to verified applicability. 6. Inspection, testing and maintenance execution 6.1 Perform inspection and testing only against approved plans, methods, acceptance criteria and authorised technical requirements, using competent personnel and suitable calibrated equipment. 6.2 Execute preventive, predictive and corrective maintenance in accordance with applicable OEM instructions, approved work packs, isolation and permit controls and client requirements. 6.3 Record findings, deviations, asset condition, work completion and handover evidence so that technical decisions and maintenance history remain traceable. 7. Nonconformity, change and corrective action 7.1 Identify, contain, record and communicate nonconformities, defects, missed requirements and

PROMETIM | UGANDA PROMETIM | UGANDAOVW-001 | OPERATIONAL GUIDING PRINCIPLES OVW-001 | OPERATIONAL GUIDING PRINCIPLESPROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline 7.3 Apply formal management of change to material alterations in scope, personnel, equipment, methods, requirements or operating conditions. 8. Data, records and reporting 8.1 Capture and protect inspection, maintenance, compliance, competence and project records using controlled formats, access rights, retention rules and approved client systems where required. 8.2 Ensure information is accurate, complete, retrievable and traceable to the asset, task, responsible person, revision and approval where applicable. 8.3 Report material performance, risks, exceptions and contractual deliverables to the relevant management and client interfaces at agreed intervals. 9. Performance monitoring and continual improvement 9.1 Define project- and entity-appropriate indicators for safety, asset performance, delivery, compliance, quality, cost and client satisfaction, with approved owners and measurement methods. 9.2 Review results, incidents, trends, nonconformities and lessons learned; assign dated improvement actions and verify their effectiveness. 9.3 The numerical targets shown in PRU-INF-045 are illustrative until approved by authorised management and incorporated into applicable contracts or plans. 10. Application through the eight-volume operating model 10.1 V1 — Strategic Alignment, Vision & Regulatory Compliance: define mandate, legal and contractual compliance baseline, technical applicability and operating readiness. 10.2 V2 — General Management & Communication Matrix: establish governance, decision rights, communication routes and escalation. 10.3 V3 — Commercial Workflow: manage enquiries, quotations, contract review, invoicing and receivables interfaces. 10.4 V4 — Internal Cost Control & Treasury: manage expenditure approvals, budgets, banking, treasury and financial controls. 10.5 V5 — Project Tracking, Systems & Delivery Architecture: plan, mobilise, execute, monitor and close out delivery activities and technical assurance. 10.6 V6 — Supply Chain, Logistics & Physical Infrastructure: control sourcing, logistics, supplier qualification, inventory and facility readiness. 10.7 V7 — Personnel Management, Recruitment & Labour Compliance: manage workforce planning, employment compliance, competence and mobilisation. 10.8 V8 — Customer Interfacing, Market Presence & Action Plan Consolidation: manage client relationships, market actions, ownership and integrated improvement priorities. 11. Responsibilities, authority and local adaptation 11.1 PROMETIM management is responsible for approving these principles, assigning ownership and confirming the authority under which any entity adopts them. 11.2 Country management teams shall translate the principles into locally applicable plans, accountabilities, legal registers, client requirements and implementation evidence.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-OVW-001 00 Draft Not issued Pending approval Page 1 of 6 Internal use | Uncontrolled when printed, downloaded or used offline 11.3 Project and functional managers shall implement only authorised controls within their remit and escalate gaps, conflicting requirements and unapproved departures. 11.4 Uganda applications shall consider Petroleum Authority of Uganda requirements and applicable Tilenga, EACOP and TotalEnergies contractual specifications only where confirmed for the relevant contract and activity. 12. Document hierarchy, maturity and verification 12.1 The hierarchy is: Operational Guiding Principles; Two-Day Operational Seminar design basis; eight- volume Operational Overview; individual Volume Operational Plans; controlled procedures, work instructions and records. Infographics form a parallel visual layer and do not supersede controlled text. 12.2 Distinguish concept, framework drafted, detailed procedure drafted, reviewed, approved, implemented and verified maturity states; Board-readiness does not establish implementation-readiness. 12.3 The approved Master Document Register controls document numbering, status and revisions. Future governing procedures will define detailed drafting, review, approval, distribution, retention and supersession controls. 12.4 PRU-INF-045 is the accompanying visual summary. PRU-OVW-002 is the intended identifier for the separate eight-volume Operational Overview, subject to register update and controlled renaming. 13. Reference basis and verification limitations 13.1 Source basis: Two-Day Operational Seminar Plan; approved eight-volume design baseline; PROMETIM service information; PRU-INF-045 Operational Guiding Principles; and the Operational Documentation Developmen

PROMETIM | UGANDA OPERATIONAL PLAN | ROAD MAP PROMETIM | UGANDA OPERATIONAL PLAN | INDEX 8 Strategic Alignment, Vision & Regulatory Compliance Volume 1 establishes the strategic and regulatory foundation for PROMETIM Uganda’s operations. It covers alignment with PROMETIM Group objectives, the legal and regulatory requirements for operating in Uganda, and the management controls needed to maintain compliance and operational readiness. INDEX INF-047 - Operational Plan infographic — PLN-001 - Operational Plan — INF-048 - Strategic Mandate infographic — PRO-041 - Strategic Mandate and Group Alignment — INF-049 | Legal and Other Requirements — PRO-042 | Legal and Other Requirements Identification — INF-050 | Permits, Licences and Renewal Control — PRO-043 | Permits, Licences and Renewal Control — INF-051 | Petroleum Sector and National Content — PRO-044 | Petroleum Sector and National Content Compliance — INF-052 | Client and Contract Requirements — PRO-045 | Client and Contract Requirements Review — INF-053 | Standards and Technical Codes — PRO-046 | Standards and Technical Code Applicability — INF-054 | Integrated QHSE Policy and Objectives — PRO-047 | Integrated QHSE Policy and Objectives — INF-055 | Enterprise and Compliance Risk — PRO-048 | Enterprise and Compliance Risk Management — INF-056 | Management of Change — PRO-049 | Management of Change — INF-057 | Documented Information and Records — PRO-050 | Documented Information and Records — INF-058 | Competence and Authorisation — PRO-051 | Competence and Authorisation Assurance — INF-059 | Regulatory and Client Communication — PRO-052 | Regulatory and Client Communication — INF-060 | Internal Audit and Compliance — PRO-053 | Internal Audit and Compliance Verification — INF-061 | Nonconformity and Corrective Action — PRO-054 | Nonconformity and Corrective Action — INF-062 | Management Review and Readiness — PRO-055 | Management Review and Readiness Release —

PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PLN-001 00 Draft Not issued Pending approval Page 1 of 7 Internal use | Uncontrolled when printed, downloaded or used offline DOCUMENT APPLICATION: OFFICE PRU-PLN-001 | Volume 1 - Strategic Alignment, Vision & Regulatory Compliance Document number PRU-PLN-001 Revision 00 Document status Draft for management approval First issue date Not yet issued Current effective date Pending approval Document owner Uganda Management Team / Compliance Lead Revision trigger/frequency Annual and following material regulatory, contractual or organisational change Interfaces Uganda management, compliance, contracts, technical and QHSE Document Authorisation Prepared by Reviewed by Approved by Name Position Date Signature Revision history Revision Date Description of changes Section(s) 1. Executive decision and operating intent Volume 1 establishes the strategic and legal permission-to-operate framework for PROMETIM Uganda as an asset- integrity and maintenance services provider. It defines the decisions, evidence, accountable owners and hold points needed before offering, contracting, mobilising or executing regulated work. It is the governance baseline for Volumes 2– 8, not a substitute for project-specific execution plans or approved client procedures. Operational outcome: an approved Uganda mandate, verified legal obligations and licences, a client/technical requirements matrix, a risk-based readiness decision, and a traceable assurance cycle. 2. Mandate, business scope and boundaries Services referenced in PROMETIM Uganda capability material include inspection and field services, mechanical and rotating equipment maintenance, fabric maintenance, flexible hoses, energy and facilities maintenance, shutdown/turnaround support, EPC-related support, procurement and associated specialist workshop services. Each service is activated only after its regulatory, technical, competency and contractual prerequisites are confirmed.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PLN-001 00 Draft Not issued Pending approval Page 2 of 7 Internal use | Uncontrolled when printed, downloaded or used offline Decision area Uganda management accountability Group / client interface Service activation Propose launch sequence; demonstrate readiness and local capability Obtain reserved Group approval and client qualification where required Contract acceptance Confirm capability, commercial exposure and compliance gaps Escalate exceptions per DoA; obtain written client acceptance where required Technical execution Nominate competent technical authority; approve service- specific ITP / method Apply client codes, hold points and third-party witnessing Regulatory compliance Maintain current legal obligations and permits Obtain specialist legal advice; provide client evidence as required High-consequence risks Suspend work lacking mandatory safeguards Escalate to management and client under contractual notification rules 3. Uganda regulatory and statutory baseline The Compliance Lead shall validate applicability against current primary legislation and regulator guidance before marking any obligation compliant. The following is a verification map, not a claim that any registration or licence is already held. Domain Verification / evidence required Owner Corporate URSB entity registration, beneficial ownership and authorised signatories as applicable Legal / Finance Tax and customs URA TIN, VAT/PAYE/withholding/customs obligations as applicable; filing calendar Finance / Tax Petroleum sector PAU supplier eligibility, national- content and project reporting requirements as applicable Contracts / Compliance Environment NEMA screening, permits, impact approvals and licence conditions when triggered QHSE / Environment People and safety Employment, immigration, occupational safety, training and site-specific HSE obligations HR / QHSE12

PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PLN-001 00 Draft Not issued Pending approval Page 3 of 7 Internal use | Uncontrolled when printed, downloaded or used offline Domain Verification / evidence required Owner Operations and facilities Local trading, land-use, workshop, transport, waste and other activity-specific approvals Operations / Compliance 4. Tilenga / EACOP contracting and client requirements TotalEnergies Tilenga and EACOP requirements shall be treated as contract-specific and controlled: prequalification, local content, ethical conduct, HSE life-saving rules, site access, PTW, quality deliverables, technical specifications, insurance, security, subcontractor flow-down, environmental/social obligations, reporting, change control and close-out. No generic client branding or public specification is evidence of contractual approval. The Contracts Manager shall record the exact document number, edition, clause, applicability, compliance method, owner, due date and evidence in the Client Requirements Matrix. Conflicts or deviations require formal resolution before acceptance or mobilisation. 5. ISO and technical standards architecture Management-system framework: ISO 9001 (quality), ISO 14001 (environment), ISO 45001 (OH&S), ISO 29001 (petroleum-sector QMS, where adopted/contractually required), ISO 31000 (risk guidance) and ISO 20815 (production assurance, where relevant). Certification status and scope must be verified; inclusion here does not imply certification. Service / exposure Candidate technical references — verify applicability and edition Pipelines / piping ASME B31.4, B31.8, ISO 13623, API Spec 5L; project specifications Pressure equipment / fabrication ASME BPVC Section VIII and relevant welding / inspection codes Sour-service materials ISO 15156 / NACE MR0175 where H2S exposure exists Wellhead / drilling interfaces ISO 10423 / API 6A and ISO 13533 / API 16A only where relevant Process safety / facilities ISO 17776, ISO 13702, ISO 10418 and ISO 15544 where applicable Reliability / machinery ISO 20815, applicable OEM manuals and equipment- specific ISO/API standards Procurement Applicable IOGP JIP33 specifications when expressly required Precedence and conflict control: mandatory Ugandan law and permits prevail; executed contract and client specifications are applied subject to law; relevant technical codes and OEM instructions are selected by the Technical Manager; PROMETIM IMS requirements remain mandatory internally. Conflicts are logged and resolved by authorised parties.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PLN-001 00 Draft Not issued Pending approval Page 4 of 7 Internal use | Uncontrolled when printed, downloaded or used offline 6. Operating model — six assurance gates Gate Required evidence Release authority G0 — Define Service / site / entity / scope / client identified; stakeholders mapped Operations + Contracts G1 — Legal Legal register checked; valid mandatory licences and approvals available Compliance Lead G2 — Contract Signed terms, client requirements matrix and deviations dispositioned Contracts Manager G3 — Technical & QHSE Applicable codes, personnel authorisations, equipment, ITPs, HSE risk controls and emergency interfaces verified Technical + QHSE G4 — Mobilise Open critical gaps = zero; readiness pack reviewed and signed Authorised Uganda management G5 — Sustain Monthly compliance review; quarterly assurance; annual management review Process owners / management STOP-WORK RULE: no activity proceeds where mandatory legal authority, a critical safety barrier or a contractual precondition is missing. Release is documented only after corrective evidence is verified. 7. Procedure system — 15 controlled V1 procedures Procedure ID Controlled procedure title Lead function PRU-PRO-001 Strategic Mandate and Group Alignment Management PRU-PRO-002 Legal and Other Requirements Identification Compliance PRU-PRO-003 Permits, Licences and Renewal Control Compliance PRU-PRO-004 Petroleum Sector and National Content Compliance Contracts / Compliance PRU-PRO-005 Client and Contract Requirements Review Contracts PRU-PRO-006 Standards and Technical Code Applicability Technical PRU-PRO-007 Integrated QHSE Policy and QHSE13

PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PLN-001 00 Draft Not issued Pending approval Page 5 of 7 Internal use | Uncontrolled when printed, downloaded or used offline Procedure ID Controlled procedure title Lead function Objectives PRU-PRO-008 Enterprise and Compliance Risk Management Management / QHSE PRU-PRO-009 Management of Change Operations PRU-PRO-010 Documented Information and Records QHSE / Document Control PRU-PRO-011 Competence and Authorisation Assurance HR / Technical PRU-PRO-012 Regulatory and Client Communication Compliance / Contracts PRU-PRO-013 Internal Audit and Compliance Verification QHSE PRU-PRO-014 Nonconformity and Corrective Action QHSE / Owners PRU-PRO-015 Management Review and Readiness Release Management Note: this index follows the existing controlled Volume 1 procedure pack. Previously generated training illustrations with different procedure names are not authoritative and must not replace the approved procedure register. 8. Delivery roadmap and accountabilities Window Priority deliverable Accountable / gate Days 0–15 Approve mandate and DoA interfaces; appoint compliance owners; compile entity / service / site baseline Uganda Management / G0 Days 16–30 Validate legal register, statutory calendar, PAU and NEMA applicability; collect licence evidence Compliance / G1 Days 31–45 Map Tilenga/EACOP contract requirements; confirm technical standards by service Contracts + Technical / G2 Days 46–60 Close competency, equipment, HSE and emergency gaps; complete assurance sampling Technical + QHSE / G3 Days 61–90 Run readiness review; approve controlled release; launch Management / G4–G5PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PLN-001 00 Draft Not issued Pending approval Page 6 of 7 Internal use | Uncontrolled when printed, downloaded or used offline Window Priority deliverable Accountable / gate dashboard and monthly reviews 9. Management dashboard and escalation thresholds KPI / control Target / decision rule Frequency Mandatory permits and licences 100% valid for work in scope; expired = hold affected activity Monthly / pre-mobilisation Client requirements mapped 100% mandatory clauses owned before mobilisation Per contract Critical risks / safety barriers No uncontrolled high- consequence exposure; stop work on missing barriers Per task / weekly Technical competence / equipment 100% critical roles authorised and measuring equipment in calibration Pre-job / monthly Statutory calendar Zero unaddressed overdue mandatory submissions Monthly Corrective action Critical overdue actions escalated immediately; closure verified Weekly / monthly National content Evidence against applicable contract commitments, not assumed quotas Monthly / contract cycle 10. Records, reporting and assurance Minimum V1 evidence set: approved mandate and DoA; legal obligations register; permit and renewal register; national- content tracker; client requirements matrix; technical standards applicability matrix; risk and change registers; competence authorisation records; controlled document register; audit programme; NCR/CAPA log; management review minutes; signed mobilisation release. Review cadence: process owners review obligations and emerging changes monthly; management reviews exception status and project readiness quarterly; formal IMS management review is held at least annually and following material changes. Records are controlled under PRU-PRO-010. 11. Cross-volume handover Volume Volume 1 interface V2 — General Management & Communications Authority, accountability, reporting and escalation V3 — Commercial Workflow Client terms, compliance preconditions, commercial risk V4 — Cost Control & Treasury Regulatory payments, DoA and financial controls V5 — Project Delivery Contract and technical readiness gates, audit trail14

PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PLN-001 00 Draft Not issued Pending approval Page 7 of 7 Internal use | Uncontrolled when printed, downloaded or used offline Volume Volume 1 interface V6 — Supply Chain & Logistics Supplier eligibility, import and material compliance V7 — Labour & Recruitment Employment compliance and competence assurance V8 — Customer & Market Client qualification, ethics and market commitments 12. Approval decisions and open verification items 12.1 Confirm actual Uganda entity registration and current permit inventory. 12.2 Confirm the approved Group delegation-of-authority matrix and named signatories. 12.3 Verify current ISO certificate scope, if any, and decide whether ISO 29001 adoption is required. 12.4 Obtain the actual Tilenga/EACOP contract packages and controlled specifications before asserting compliance. 12.5 Approve the service launch sequence, technical authorities, resourcing and insurance limits. 12.6 Assign register owners and approve G4 mobilisation release criteria. 13. Source and applicability note Source-derived structure: Two-Day Operational Seminar Plan, Session 1 (strategic mandate, autonomy, permits, tax, bottlenecks and compliance baseline); existing PROMETIM Uganda Volume 1 Operational Plan and 15-procedure pack; supplied Uganda service flyers. The gate architecture, roadmap and dashboard are structured implementation proposals for management validation. Regulatory applicability and standards editions must be checked against current law, issued codes and executed contracts before approval.15

PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PRO-041 00 Draft Not issued Pending approval Page 1 of 2 Internal use | Uncontrolled when printed, downloaded or used offline DOCUMENT APPLICATION: OFFICE PRU-PRO-041 | Strategic Mandate and Group Alignment Document number PRU-PRO-041 Revision 00 Document status Draft First issue date Not yet issued Current effective date Pending approval Document owner MD (process owner) Revision trigger/frequency Annual strategy cycle or material market change Interfaces Volumes 2–8 as relevant; client and regulator requirements Document Authorisation Prepared by Reviewed by Approved by Name Position Date Signature Revision history Revision Date Description of changes Section(s) 1. Purpose 1.1 Establish a repeatable, evidence-based control for strategic mandate and Group alignment. 2. Scope and interfaces 2.1 PROMETIM Uganda personnel, relevant Group interfaces and subcontractors where the requirement is flowed down. 3. Responsibility 3.1 MD executes and maintains evidence. QHSE verifies system integration; MD approves significant risk, legal exceptions and operational release. 4. Procedure 4.1 Confirm Group mission and Uganda services. 4.2 Document autonomous versus reserved decisions. 4.3 Approve 12-month objectives and resources. 4.4 Communicate strategy. 4.5 Review and monitor progress quarterly.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PRO-041 00 Draft Not issued Pending approval Page 2 of 2 Internal use | Uncontrolled when printed, downloaded or used offline 5. Acceptance criteria 5.1 Required approvals are recorded; applicable obligations and client conditions are met; exceptions are escalated; evidence is retrievable and current. 6. Records 6.1 Approved mandate; objective dashboard; minutes. 7. Escalation 7.1 Stop or hold affected activity where a mandatory legal authority, critical safety control or contractual prerequisite is absent. 7.2 Notify MD, QHSE and contract owner; resume only on documented clearance. 8. References 8.1 ISO 9001:2015, ISO 14001:2015, ISO 45001:2018 as applicable; approved Uganda legal register; current client contract and project specifications.17

PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PRO-042 00 Draft Not issued Pending approval Page 1 of 2 Internal use | Uncontrolled when printed, downloaded or used offline DOCUMENT APPLICATION: OFFICE PRU-PRO-042 | Legal and Other Requirements Identification Document number PRU-PRO-042 Revision 00 Document status Draft First issue date Not yet issued Current effective date Pending approval Document owner Compliance Lead (process owner) Revision trigger/frequency New law, service, location or client Interfaces Volumes 2–8 as relevant; client and regulator requirements Document Authorisation Prepared by Reviewed by Approved by Name Position Date Signature Revision history Revision Date Description of changes Section(s) 1. Purpose 1.1 Establish a repeatable, evidence-based control for legal and other requirements identification. 2. Scope and interfaces 2.1 PROMETIM Uganda personnel, relevant Group interfaces and subcontractors where the requirement is flowed down. 3. Responsibility 3.1 Compliance Lead executes and maintains evidence. QHSE verifies system integration; MD approves significant risk, legal exceptions and operational release. 4. Procedure 4.1 Identify activities and regulators. 4.2 Obtain primary legal texts or qualified advice. 4.3 Assess applicability. 4.4 Assign owner, deadline and evidence. 4.5 Approve obligations register. 4.6 Review monthly and on change.PROMETIM | CONTROLLED MANAGEMENT SYSTEM DOCUMENT NO. REVISION STATUS FIRST ISSUE EFFECTIVE DATE PAGE PRU-PRO-042 00 Draft Not issued Pending approval Page 2 of 2 Internal use | Uncontrolled when printed, downloaded or used offline 5. Acceptance criteria 5.1 Required approvals are recorded; applicable obligations and client conditions are met; exceptions are escalated; evidence is retrievable and current. 6. Records 6.1 Legal obligations register; advice; review log 7. Escalation 7.1 Stop or hold affected activity where a mandatory legal authority, critical safety control, or contractual prerequisite is absent. 7.2 Notify MD, QHSE and contract owner; resume only on documented clearance. 8. References 8.1 ISO 9001:2015, ISO 14001:2015, ISO 45001:2018 as applicable; approved Uganda legal register; current client contract and project specifications.19

Flipso