ARCH 544 ARCHITECTURAL STRUCTURESARC - 5108A Proposed Two-Storey Residential HouseDe Juan, Cheska Nicole P.Juarez, Luisa O.
Message from the Instructor: DATIVA DE CASTRO - HERNANDEZ Architectural Structural Instructor As a graduate of a Bachelor of Science in Civil Engineering with almost thirty years of experience in the construction industry, I have recognised the importance of developing diverse technical skills to collaborate effectively with architects and other engineering professionals. This structural design computation aims to introduce architecture students to fundamental engineering principles and their practical applications in the construction industry. It also seeks to broaden their understanding of structural design, strengthen their technical knowledge, and encourage further learning and research in structural engineering.
The design and construction of a two-storey residential house at Barangay. Alangilan, require careful planning, accurate calculations, and a thorough understanding of structural components to ensure the safety, stability, and durability of the building. This magazine presents the structural computations and detailed drawings of the major structural elements of a two-storey residential house, namely the foundation footing, columns, beams, and slab. It provides an overview of how each component is analyzed, designed, and detailed based on structural requirements, including their dimensions, reinforcement arrangements, and other essential construction specifications.INTRODUCTION 2026A Proposed Two-Storey Residential House “A home is more than a structure; it is a reflection of the people who live in it, shaped by comfort, functionality, and timeless design” Through the computations and structural details presented in this magazine, readers can gain a better understanding of how engineering principles are applied in residential building design. It also emphasizes the importance of accurate structural calculations and proper detailing in preventing structural failures and ensuring a safe, functional, and reliable home.
THE SITE The proposed site is located at Golden Country Homes Subdivision, Barangay Alangilan, Batangas City, Batangas, with an approximate land area of 291.339 square meters. The site is surrounded by mature trees and tall bushes, providing a green and naturally landscaped environment that contributes to the overall character of the area. In terms of environmental conditions, the site has a low susceptibility to flood hazards, making it relatively less vulnerable to flooding. It is situated approximately 55 meters above sea level and has relatively flat terrain, which may provide favorable conditions for site development and construction. In terms of accessibility, the site is conveniently located near the Golden Country Homes Tricycle Terminal, providing access to local public transportation. It is also accessible through major roads, allowing convenient movement to and from the surrounding areas. Various commercial, institutional, religious, and residential establishments are situated within the vicinity, contributing to the site's accessibility and convenience. Furthermore, the access road is approximately 10 meters wide, with at least 2-meter-wide sidewalks on both sides, providing adequate space for vehicular movement and pedestrian access. Overall, the site's relatively flat topography, low flood susceptibility, surrounding vegetation, and proximity to transportation and essential establishments make it a suitable location for the proposed development.
ARCHITECTURAL PLANS FLOOR PLANS ELEVATIONS
GROUND FLOOR PLAN SECOND FLOOR PLAN
FRONT AND LEFT ELEVATION REAR AND RIGHT ELEVATION
LONGITUDINAL Section CROSS SectionSTAIRS STOPOWLANAIBR 2 T&BBALCONY STAIRSSTUDY/WORKWICROOMBEDROOM 2ELDERLY/GUEST ROOMT&BMASTER'ST&BWICSERVICEAREA9400200302000 0300 30003600FFL FCLFFLNGLROOF APEXTOP OF ROOF BEAMFCLLIVING AREAFAMILY AREASTAIRSBALCONY94002003020000300 30003600FFL FCLFFLNGLROOF APEXTOP OF ROOF BEAMFCL
2nd FLOOR SLAB FRAMING PLAN STRUCTURAL PLAN DETAILS COMPUTATION
25400189004500200020002000200022002100310040005200150040006200450020001890025400300020001250075001147074704200390020002000X1X11X12X13X5X14X7X8X10Y1Y4 Y5 Y8Y7S - 1S - 1S - 1STAIR WELLS - 1S - 1S - 1S - 1S - 1S - 1S - 1S - 1S - 1S - 1S - 1OPEN BELOWPC-1PC-1PC-1PC-1PC-1RCBRCBRCBRCBRCBRCBRCBRCBPC-1PC-1PC-1PC-1PC-1PC-1RCBPC-1PC-1PC-1RCBRCBRCBRCBRCBRCBPC-1PC-1PC-1PC-1PC-1RCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBRCBBLOW UP PLAN SECOND FLOOR SLAB FRAMING PLAN
SLAB & BEAM detailsBeam = 400mm x 200 mmBeam RodReinforced SlabSlab Thickness = 125 mm10 mm dia. @ 150 mm O.C. (E.W.)Two-Way Reinforced Concrete Slsb10 mm dia. @ 150 mm O.C. (E.W.)
COMPUTATION Given: Shorter span (Lx) = 4.20 m Longer span (Ly) = 5.20 m Concrete strength (f'c) = 21 MPa Steel yield strength (fy) = 415 MPa Concrete unit weight = 24 kN/m³ Step 1. Determine whether it is one-way or two-way slab This behaves as a TWO-WAY SLAB. Step 2. Calculate the Factored Load (Wu) A. Slab Self-weight This is the weight of the concrete slab per square meter. B. Finishes, Tiles & Screed: 1.20 kPa C. Ceiling & Utilities: 0.40 kPa D. Partition Allowance: 1.00 kPa TOTAL DEAD LOAD (D): 5.60 kPa E. Live Load (L): Residential Upper Floor (NSCP Table 205-1) = 1.90 kPa F. Ultimate Factored Load (Wu):
A. Given: Mu = 4.85 KNm/m B. Effective depth (d): 125 mm-20 mm - 5 mm (half bar ⌀) = 100 mm C. Required Steel Area (As): Given: Mu =21.38 kNm/m = 21.38 x 10^6 N.mm/m fy=415MPa d=100mm =0.90 Step 3. Computing Bending Moment & Rebar Spacing Calculate the Bending Moment: Given: Moment Coefficient, C = 0.1242 Factored Uniform Load, Wu = 9.76 kN/m² Design Span, La = 2.0 m Formula: Solution: Substitute the given values: Simplifying: Solution: Using the formula: Substitute the given values: D. Checking the Minimum Shrinkage Steel (NSCP 2015 Section 407.12): Minimum Steel Reinforcement (As,)
Given: b=1,000mm h=125mm Minimum reinforcement ratio = 0.0018 Solution: Using the formula: Substitute the given values: Since: Therefore, use: Spacing of Reinforcing Bars (s) Given: As=635.7mm2/m Bar diameter = 10 mm Area of 10 mm bar = 78.5mm2 Width = 1,000 mm Solution: Using the formula: Substitute the given values: Final Answer:
Adopted reinforcement spacing of 150 mm O.C. both ways (E.W.) for the slab design. Final slab thickness: 125 mm. Reinforcement: 10 mm diameter deformed bars @ 150 mm O.C. E.W. Given: Slab thickness (h) = 125 mm Maximum allowable spacing = 2h E. Maximum Allowable Spacing Constraint: Solution: Using the NSCP maximum spacing requirement: Substitute the given values: Therefore, the maximum allowable spacing of reinforcing bars is: F. Design Selection and Final Provision Notes: Final Design:
COMPUTATION Step 1. Calculate the Total Ultimate Line Load (Wu) A. Trapezoidal Load from the Two-Way Slab: Given: Factored slab load (Wu) = 9.76 kPa Short span (Lx) = 4.2 m Aspect ratio () = 1.24 Solution: Using the equivalent uniform load formula: Substituing the given values:: B. Factored Beam Self-Weight Given: Beam width (b) = 0.20 m Beam depth (h) = 0.40 m Unit weight of reinforced concrete () = 24 kN/m³ Dead load factor = 1.2 (NSCP) Solution: Using the formula: Substituting the given values:
C. Factored Masonry CHB Wall Load: Given: Unfactored CHB wall load = 3.20 kN/m Dead Load Factor = 1.20 Formula: Solution: Substituting the given values: Final Answer: D. Sum of Line Load (Wtotal.u) Step 2. Establish the Structural Gravity Moment (Mu gravity) Given: Total Factored Load, Wtotal,u = 22.19 kN/m Beam Length, L = 5.20 m Formula: Based on NSCP 2015, Section 406, for a continuous beam under gravity loads: Solution: Substituting the given values: Final Answer:
Step 3. Combine with Lateral Forces (Wind and Earthquake Envelopes) Given: Maximum Gravity Moment, Mu,gravity = 54.55 kN·m Additional Lateral Moment, Mu,lateral = 8.34 kN·m Applicable Load Combinations: Based on the provided NSCP 2015 Section 203 load combinations: 1.U=1.2D+1.0W+1.0L 2.U=1.2D+1.0E+1.0L Formula: The total factored moment is determined by combining the gravity moment and additional lateral moment: Solution: Substituting the given values: 1.Flexural Beam Design (FTB - 1) Computation A. Sizing Given: Beam Span, L = 5.20 m = 5,200 mm Minimum Depth Ratio = L/16 Formula: Solution: Substituting the given values: B. Load Tracing to Beam Given: Beam Span, L = 5.20 m Slab Load = 9.76 kPa Tributary Width = 2.10 m Dead Load Factor = 1.20 Beam Self-Weight = 3.20 kN/m Additional Load = 2.30 kN/m
1.Flexural Beam Design (FTB - 1) Computation Formula: Solution: 2.Compute the Factored Slab Load Formula: Solution: 3.Compute the Factored Beam Self-Weight Formula: Solution: 4.Compute the Total Factored Continuous Load Formula: Solution: Substituting the given values: C. Reinforcement Computation 1.Ultimate Bending Moment (Mu) Formula:
Substituting the given values: 2.Effective Depth (d) The effective depth is calculated as: where: Overall depth = 400 mm Concrete cover = 40 mm Stirrup diameter = 10 mm Half of main bar diameter = 8 mm 3.Required Steel Area (As) Formula: Substituting the given values: 4.Minimum Steel Area (As,min) Using the NSCP formula: Given: f'c=21MPa fy=415MPa bw=200mm d=342mm Substituting the given values:
5.Actual Steel Area Provided (As) Using three (3) 16 mm diameter reinforcing bars: 6.Verification of Minimum Steel Requirement Comparing the actual steel area with the minimum required steel area: D. Stirrup Spacing (NSCP Seismic Confinement) 1. Determine the Critical Confinement Zone According to NSCP Chapter 4 (Seismic Provisions for Special Moment Frames), the critical confinement zone extends a distance of 2h from the column face. Given: Overall beam depth, h=400mm Substituting the given values: 2.Determine the Maximum Stirrup Spacing Within the critical confinement zone, the maximum stirrup spacing shall not exceed the smallest of the following:
3.Selection of Stirrup Spacing For the critical confinement zone near the column face, provide: 100 mm O.C. Beyond the critical confinement zone, the stirrup spacing may be increased to approximately half the effective depth: For practical design, adopt: 150 mm O.C. at mid-span
STRUCTURAL PLAN DETAILS COMPUTATION FOUNDATION AND COLUMN FOOTING PLAN
BLOW UP PLAN FOUNDATION AND COLUMN FOOTING PLAN
10-16mm ⌀ Bars Equally Both Ways (E.W.)20 mm Ø vertical bars8–20 mm Ø vertical bars10-mm Ø COnfinement Hoops @ 100mm O.C.ISOLATED FOOTING details COLUMN details
COMPUTATION FRAME COLUMN DESIGN (C-2) COMPUTATION A. Axial Load Capacity Check 1.Gross Concrete Area (Ag) GIVEN: Column width = 200 mm Column Depth = 300 mm Using the Formula : Substituting: 2.Total Longitudinal Steel Area (Ast) Given 8 pieces of 20 mm diameter longitudinal bars: 3.Reinforcement Ratio (Pg) Using the formula: Substituting: Therefore, the reinforcement ratio of 4.18% satisfies the NSCP seismic reinforcement limits: 1% ≤ Pg≤ 6% 4.Nominal Axial Strength (Pn) Under Pure Compression Using the formula: Given: f'c=21MPa fy=415MPa Ag=60,000mm2 Ast=2,513mm2
A. Part I: Seismic Lateral Load Analysis (NSCP 2015 Section 208) 1. Environmental and Site Criteria The following parameters are used in determining the seismic design forces of the structure: Given: Project Location: Alangilan, Batangas City Seismic Zone: Zone 4 Seismic Zone Factor, Z=0.40 Occupancy Category: Standard Residential Occupancy (Category IV) Importance Factor, I=1.0 Soil Profile Type: Stiff Soil Baseline Classification (SD) Seismic Source Type: Type A Near-Source Factors: Na=1.0, Nv=1.0 Structural Frame System: Special Reinforced Concrete Moment- Resisting Frames (SMRF) Response Modification Factor, R=8.5 Substituting: 5.Factored Axial Capacity (ϕPn,max) for Tied Columns Using the formula provided: Substituting: COMPUTATION WITH SEISMIC ANALYSIS 2. Seismic Response Coefficients (Ca and Cv) Using NSCP Tables 208-7 and 208-8: a. Seismic Coefficient Ca Formula: Substituting: b. Seismic Coefficient Cv Formula:
4. Design Base Shear Coefficient (V/W) The total horizontal lateral seismic force acting at the base of the structure is determined using the following equations: a. Maximum Base Shear (Vmax) Formula: Substituting: 3. Fundamental Period of Vibration (T) Using the NSCP simplified empirical formula for concrete moment- resisting structures: Given: Numerical Coefficient, Ct=0.0731 Building Height, hn=6.4m (2 storeys) Substituting: Substituting: b. Elastic Base Shear (Velastic) Formula: Substituting:
c. Minimum Base Shear (Vmin) Formula: Substituting: d. Governing Base Shear Value Based on the provided computation, the selected design base shear coefficient is: V = 0.1294W This represents 12.94% of the total seismic weight of the structure. 5. Load Tracing to Corner Column C-2 a. Tributary Seismic Dead Weight (Wtributary) The corner column captures a floor tributary area of: This tributary area is considered across two floor levels (Roof Deck and Second Floor). b. Total Seismic Weight Assigned to Column C-2 Given the total combined framing mass assigned to Column C-2: W = 95 kN c. Total Seismic Lateral Force on Column C-2 Using the selected base shear coefficient: Substituting: 6. Induced Column Seismic Moment (Mu,seismic) Under frame drift deformations, bending stresses develop at the column faces over a clear column height. Given: Column seismic shear, Vcolumn=12.29kN Clear column height, Hclear=2.8m Using the formula:
Substituting: B. Part II: Combined Stress Columns Ultimate Design (NSCP chapter 4) 1. Determination of Ultimate Factored Combined Demand The column is designed to resist the combined effects of axial load and bending moment under the governing load combinatio Based on the given loading conditions, the factored demands are: 1.1 Factored Axial Load Demand 1.2 Factored Bending Moment Demand The total factored bending moment consists of the contributions from gravity and seismic loading: Therefore, the governing factored demands are: Factored axial load: Pu=385kN Factored bending moment: Mu = 28.50 kN.m 2. Cross-Section Geometry and Material Check 2.1 Cross-Sectional Dimensions The proposed reinforced concrete column has the following dimensions: b=200mm h=300mm The gross cross-sectional area is: 2.2 Longitudinal Reinforcement Selection
The column is provided with eight (8) pieces of 20 mm diameter Grade 60 reinforcing bars. The total area of longitudinal reinforcement is: Therefore, the provided longitudinal reinforcement satisfies the stated reinforcement ratio requirements and helps prevent brittle failure behavior in seismic conditions. 3. P-M Cross-Section Interaction Verification To determine whether the proposed column section can safely resist the simultaneous application of axial compression and bending moment, the nominal axial and moment resistance capacities are evaluated. The verification considers the concrete compression block and the contribution of the longitudinal reinforcing steel. 3.1 Concrete Compression Force Distribution (Cc) Assuming a balanced stress block depth index parameter of: a=115mm 2.3 Reinforcement Ratio Verification The reinforcement ratio is calculated using: Substituting the values: The calculated reinforcement ratio of 4.19% is within the specified allowable range of 1% to 6%. 1% ≤ 4.19≤ 6% The concrete compression force is calculated using: Where: f'c=21MPa a=115mm b=300mm
Substituting: 3.2 Nominal Axial Resistance Block Capacity (Pn) The nominal axial resistance is determined by summing the internal material forces, consisting of concrete compression and the contribution of the reinforcing steel. Based on the calculated internal forces: Applying the strength reduction factor for compression members: The design axial resistance is: Verification: The design axial resistance must be greater than the factored axial load demand. 3.3 Concurrent Moment Resistance Block Capacity (Mn) The nominal moment resistance is determined by taking moments of the internal concrete and reinforcing steel forces about the geometric center of the column section. The nominal moment capacity is expressed as: Based on the calculated internal forces and their respective lever arms: Applying the strength reduction factor: The design moment resistance is: Verification: The design moment resistance must be greater than the factored bending moment demand.
Verification: The design moment resistance must be greater than the factored bending moment demand. The moment capacity utilization is: C. Part III: Seismic Detailing 7 Confinement (NSCP Chapter 4) 1. Determination of Confinement Plastic Hinge Boundary Height (Lo) The close seismic tie spacing must extend from the face of the beam-column joint over a vertical distance (Lo) not less than the largest of the following values: Given: Clear column depth = 300 mm Column dimension = 200 mm Absolute minimum confinement length = 450 mm 1.1 Based on One-Sixth of the Clear Column Height 1.2 Based on the Absolute Minimum Requirement 1.3 Selection of Confinement Length The governing confinement length is determined by selecting the largest calculated value: 2. Determination of Maximum Hoop Spacing Limit (So) Within the confinement boundary length (Lo), the maximum spacing of transverse reinforcement (So) must satisfy the following limitations: 2.1 Based on One-Fourth of the Smallest Column Dimension
2.2 Based on Six Times the Diameter of the Longitudinal Reinforcement Given: Therefore: 2.3 Based on the Maximum Spacing Limitation Formula The maximum spacing is also checked using: Substituting the given value: 2.4 Selection of Maximum Hoop Spacing FOUNDATION DESIGN COMPUTATION (F1 Isolated Spread Footing) A. Design Parameters & Inputs Service Axial Dead Load (PD): 215 kN Service Axial Live Load (PL): 80 kN Total Unfactored Service Load (Pservice): PD + PL = 215 + 80 = 295 kN Ultimate Factored Axial Load (Pu): 1.2 PD + 1.6 PL = 1.2(215) + 1.6(80) = 385 kN Allowable Soil Bearing Capacity (Qa) : 150 kPa (stiff volcanic tuff/clay standard for Batangas City. Concrete Compressive Strength (f'c): 21 MPa (3000 psi) Steel Yield Strength (fy): 415 MPa (Grade 600) Column Dimensions (C-2): 200 mm x 300 mm Footing Sizing on plan: 800 mm x 800 mm x 665 mm thickness (h) B. Determination of Effective Depth (d) The effective depth of the footing is calculated by deducting the concrete cover and reinforcing bar diameter from the total footing thickness. Given: Footing thickness (h) = 665 mm Concrete cover = 75 mm Reinforcing bar diameter (db) = 16 mm
Solution: The effective depth is determined using: Substituting the given values: d=665-75-16 d= 574 mm 1.Two-Way Punching Shear Evaluation Punching shear failure occurs along a critical perimeter located at a distance of d/2 from all faces of the column. This check determines whether the footing can safely resist the concentrated load transferred from the column without experiencing punching shear failure. 2.1 Determination of Critical Perimeter Side Length (Xp) The critical perimeter side length is calculated by adding the column dimension and the effective depth. Given: Column dimension (bcol) = 300 mm Effective depth (d) = 574 mm Solution: Substituting: 2.2 Determination of Total Punching Shear Perimeter (bo) The total punching shear perimeter is calculated using: Substituting: 2.3 Calculation of Ultimate Punching Shear Force (Vu2) The ultimate punching shear force represents the force attempting to push the column downward through the footing. It is calculated by multiplying the ultimate soil pressure by the footing area outside the critical perimeter. The formula is: Given: Ultimate soil pressure (qu) = 385 kPa Provided footing area (A) = 1.00 m² Critical perimeter side length (Xp) = 0.874 m
Solution: Substituting the given values: 2.Calculation of Concrete Punching Shear Capacity (Vc2) The punching shear strength of the unreinforced concrete is calculated in accordance with the NSCP 2015 provisions to determine the footing's resistance against two-way shear failure. The nominal concrete punching shear capacity is calculated using: Given: Concrete compressive strength (f'c) = 21 MPa Total punching shear perimeter (bo) = 3,496 mm Effective depth (d) = 574 mm Solution: Substituting the given values: Converting Newtons to kilonewtons: 3.1 Application of Strength Reduction Factor To determine the design punching shear capacity, apply the strength reduction factor for shear: The design shear capacity is calculated using: Substituting: C. Flexural Design & Reinforcement Area (As) The footing is subjected to bending moments that develop along the face of the concrete column due to the upward soil pressure. The flexural design is performed to determine the required reinforcement area to resist the applied bending stresses.
1.Determination of Cantilever Span Length (Lc) The cantilever span length is measured from the face of the column to the outer edge of the footing. Given: Footing width (Bfooting) = 1,000 mm Column width (bcol) = 300 mm Solution: The cantilever span length is calculated using: Substituting: 2.Calculation of Factored Ultimate Moment (Mu) The factored ultimate bending moment is calculated using a 1.0- meter-wide strip extending outward from the face of the column. The formula is: Given: Ultimate soil pressure (qu) = 385 kPa Cantilever span length (Lc) = 0.35 m Solution: Substituting the given values: 3.Determination of Minimum Flexural Reinforcement Area (As,min) The minimum reinforcement area is determined using the minimum reinforcement ratio of 0.0018. The formula is: Given: Minimum reinforcement ratio = 0.0018 Design strip width (b) = 1,000 mm Footing thickness used in the calculation (h) = 400 mm
Solution: Substituting: 4.Verification of Minimum Reinforcement Requirement The minimum reinforcement area is compared with the calculated required flexural reinforcement area. Given: The verification is: D. Selected Reinforcement Bar Schedule Calculation The footing reinforcement is selected based on the calculated minimum reinforcement requirement. Ten (10) pieces of 16 mm diameter deformed reinforcing bars are provided, as indicated in the footing reinforcement layout plan. 1.Calculation of Area of One Reinforcing Bar The cross-sectional area of one reinforcing bar is calculated using: Given: 1. Bar diameter (db) = 16 mm Solution: Substituting: 2.Calculation of Total Provided Reinforcement Area The total provided reinforcement area is obtained by multiplying the area of one reinforcing bar by the total number of bars provided. The formula is: Given: Number of reinforcing bars (n) = 10 pieces Area of one bar (Ab) = 201.06 mm² Solution: Substituting:
3.Final Reinforcement Area Verification The total provided reinforcement area must be greater than or equal to the minimum required reinforcement area. The verification equation is: Substituting: 4. Final Footing Dimensions and Reinforcement Arrangement Based on the selected reinforcement schedule, the footing shall have the following dimensions and reinforcement provisions: Footing Base Dimensions: 1000mm x 1000mm x 400mm Bottom Flexural Reinforcement: Number of reinforcing bars: 10 pieces Bar diameter: 16 mm Bar type: Deformed reinforcing steel bars Arrangement: Both directions (Each Way or E.W.) Total provided reinforcement area: 2,010.6 mm² The bottom reinforcement mat consists of ten (10) pieces of 16 mm diameter deformed reinforcing bars running in both directions. This arrangement is intended to distribute the applied flexural forces and provide adequate reinforcement at the base of the footing.
The Proposed Two-Storey Residential House in Barangay Alangilan, Batangas City, serves as the basis for understanding and applying fundamental structural engineering principles in residential building design. This project focuses on the structural analysis, design, and detailing of the building's major structural components, including the foundation footing, columns, beams, and reinforced concrete slab. Through systematic calculations and structural assessments guided by the National Structural Code of the Philippines (NSCP 2015), the project demonstrates how appropriate dimensions, material properties, load considerations, and reinforcement arrangements contribute to the overall strength, stability, and durability of a structure. More than simply completing structural calculations, this undertaking provides an opportunity to understand how individual structural elements work together to form a safe and reliable building that can support the demands of everyday residential use. Throughout the development of this project, my partner played an important role in contributing to the completion of our work. We worked collaboratively by sharing ideas, discussing structural concepts, conducting calculations, preparing structural details, and reviewing our outputs to ensure accuracy and consistency. Her willingness to participate, share responsibilities, provide insights, and work through challenges alongside me made the entire process more manageable and meaningful. There were moments when certain calculations and structural concepts required further understanding, but through cooperation, patience, and continuous communication, we were able to address these challenges together. This project became more than just an academic requirement; it became an experience of teamwork, shared responsibility, and mutual learning that strengthened both our technical understanding and our ability to work together as future professionals. NARRATIVE CHESKA NICOLE P. DE JUAN Student
Building a two-storey residential house is not just about creating a comfortable and beautiful home. It is also about making sure that the structure is strong, stable, and safe for the people who will live in it. Before a house can be constructed, it is important to understand how its different structural components work and how they support the entire building. This project focuses on the computation and structural detailing of three major components of a two-storey residential house: the slab, footing foundation, and columns. Each of these components has an important role in the structure. The slab serves as the floor that carries the weight of people, furniture, and other loads inside the house. The columns support the loads coming from the upper floors and transfer them down to the foundation. Meanwhile, the footing foundation distributes the weight of the entire structure into the ground, helping prevent excessive settlement and keeping the house stable. Although they have different functions, these components work together to make sure that the building can safely carry the loads it will experience. Throughout this project, my partner demonstrated efficiency, responsibility, and good time management. Our work became more organized and progressed smoothly because of her dedication and ability to manage her tasks well. Despite having other workloads, academic commitments, and personal responsibilities, she was still able to accomplish her assigned parts of the project on time. Her ideas and opinions also helped us gain a better understanding of what needed to be done and allowed us to make better decisions throughout the process. Through this experience, I realized that this project is not just about solving computations and getting the correct answers. It is also about teamwork, sharing responsibilities, and effective communication. Having a cooperative partner made the process easier and helped us accomplish our tasks more efficiently. LUISA O. JUAREA Student
