TURBINEAERO Warehouse inventory project proposal Stock verification, warehouse operations, and automation strategy Presented to Phil Constain Darrel Young, Business Development Manager • November 18, 2026
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 2 PROPOSAL OVERVIEW What we propose Dear Phil, B&H Worldwide proposes to verify and reorganize 15,000 unique part numbers at your U.S. warehouse while your auxiliary power unit (APU) repair teams continue to draw stock. The proposed Phase 1 price is USD 558,400, including travel, lodging, and a delivery contingency. At handoff, your stockroom team will have a verified location register, a record of discrepancies and their owners, and a cycle-count plan it can run itself. The first zone will test whether a technician can still obtain an urgent part while the count and location changes are underway. For Phase 2, you can retain your team with B&H remote support, appoint B&H to operate the warehouse, or move to a TurbineAero-run Lean-Lift operation with a specialist partner. Pages 8 and 9 set out the options and how we would evaluate them. Inventory covered by the Phase 1 price Part category Share Part numbers Typical material Small parts and consumables 80% 12,000 Fasteners, seals, and binned consumables Midsize parts 10% 1,500 Brackets, tubes, and accessories Large, serialized, or high-value parts 10% 1,500 Rotables, housings, and life-limited parts Total inventory 100% 15,000 Estimated stock value of USD 30 million Working in a live repair operation The mix is by distinct part number. One part number may span several bins, lots or serial numbers. During discovery we will compare the stock file with a floor sample and record how many physical checks each line requires. The large or high-value band accounts for 10% of the part numbers and approximately 32% of direct verification time. We have allowed for separate serial, status, and document checks where they apply. We propose to mobilize on January 11, 2027. The choice of pilot sequence affects whether the project meets your August 30 target. The two planning cases are on page 6. Darrel Young Business Development Manager, B&H Worldwide
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 3 METHOD AND CONTROLS Keeping the warehouse operational B&H will work one agreed zone at a time. Your stockroom supervisor will retain control of urgent issues and movements at each shift change. Each closed zone will have a reconciled record of what moved, where it went and who checked it. Step B&H activity and evidence Establish the baseline Take a dated stock extract. Compare bin, part number, unit of measure, lot or serial number, quantity, and inventory status against a floor sample. Agree on the active repair orders and urgent picks that need protection. Plan storage locations Map existing and proposed locations. Group frequently picked parts near point of use where appropriate. Agree on the bin code, label format, status segregation, and route to the production floor. Test the pilot zone Select a zone containing all three part bands. Test scanning, relabeling, system posting, an urgent withdrawal, and the independent recount. TurbineAero signs off on the method and pilot results before wider release. Verify, count, and move Check the physical identifier and documentation, record the count and apply the approved location label. Log the old and new locations and post the move in TurbineAero’s authorized system. Preserve original part and release markings. Reconcile and return the zone Compare closing balances with the count and all interim issues and receipts. A second checker verifies exceptions. Record the approved disposition or retain the item on hold with an owner and review date. When a production request interrupts a count The stockroom assigns the priority pick to the zone lead. The lead records the part, quantity, time, and job reference, confirms the physical issue with the stockroom, then reconciles the transaction before the zone reopens. A serial or status mismatch goes to TurbineAero Quality. Only your authorized personnel may change serviceability or release an item for use. System of record. We propose to use your existing inventory system and approved user permissions. For Phase 2, we would agree on the role of FirstTRAC with your IT team as part of the operating model you select.
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 4 COMMERCIAL OFFER Phase 1 project pricing B&H proposes a single Phase 1 fee for one U.S. site, with the pilot incorporated into the rollout and the agreed staff available. Page 5 sets out staff commitments and the proposed payment schedule. All amounts are in U.S. dollars. Work package Pricing basis Proposed staffing Amount (USD) Small parts verification 12,000 part numbers at 55 per person- day Shared floor team 91,199 Midsize parts verification 1,500 part numbers at 30 per person- day Shared floor team 20,900 Large or high-value parts verification 1,500 part numbers at 12 per person- day Controller and shared floor team 52,250 Working around live operations 39.3 person-days for interruptions and rechecks Warehouse manager and floor team 16,435 Location labels and material flow 160 person-days for zone, bin, and flow changes Warehouse manager and floor team 66,879 Discovery, design, and systems 170 person-days for layout, data, and procedures Project lead and warehouse manager 71,059 Pilot, cycle counting, and handoff support 150 person-days for testing, counts, and post-rollout support Controller and control specialist, with floor support 62,699 Project and change management 150 person-days for governance, training, and handoff Project lead and warehouse manager 62,699 Professional services subtotal 1,062.5 modeled person-days See staffing schedule 444,120 Travel and lodging Project lead 13,320 + rollout team 28,125 Lead and five rollout technicians 41,445 Delivery contingency 15% of services and travel, rounded Included in fee 72,835 Total Phase 1 price USD 558,400 Commercial basis One floor team serves all three part categories and the location work. At full deployment, the team includes one inventory controller, one control specialist, five rollout technicians, and two employees assigned by TurbineAero. We allocate the service fee by estimated effort. Expected interruptions and residual delivery risk are included in the price. TurbineAero provides two employees for the rollout, as well as racks, bins, labels, printers, and scanners. The price covers label design and application. Any applicable taxes, new software or integration, physical alterations, and ongoing outsourced storage are outside the project price. Changes in scope, resources, or dates require written agreement.
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 5 PHASE 1 COMMERCIAL OFFER Staffing and payment schedule At peak staffing, B&H would provide nine people, and TurbineAero would assign two full-time employees to the project. The project lead is allocated two days per five-day week. The other ten people are full-time during their respective assignments. Staffing by role Role People Time per person Weeks per person Person-days B&H project lead, design, and systems 1 40% 27.75 55.50 B&H warehouse manager 1 100% 26.75 133.75 B&H inventory controller 1 100% 22.75 113.75 B&H inventory control specialist 1 100% 22.75 113.75 B&H rollout technicians 5 100% 18.75 468.75 B&H subtotal 9 885.50 Stockroom employees assigned by TurbineAero 2 100% 18.75 187.50 Combined team 11 1,073.00 The staffing plan provides 1,073 person-days against 1,062.5 estimated work-package days, a planning allowance of 10.5 days. TurbineAero covers the cost of its two assigned employees. Proposed payment terms B&H proposes 50% upfront before mobilization. The remaining 50% is payable in five equal monthly installments, with the first due one month after mobilization. Payment Proposed due date Share Due (USD) Cumulative (USD) Upfront Before mobilization 50% 279,200 279,200 Installment 1 Month 1 after mobilization 10% 55,840 335,040 Installment 2 Month 2 after mobilization 10% 55,840 390,880 Installment 3 Month 3 after mobilization 10% 55,840 446,720 Installment 4 Month 4 after mobilization 10% 55,840 502,560 Installment 5 Month 5 after mobilization 10% 55,840 558,400 Phase 1 total 100% 558,400
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 6 IMPLEMENTATION Project schedule and staffing Our proposed mobilization date is January 11, 2027. Two sequences are available for review at discovery. The duration of the pilot and the date the full rollout team can start are the decisions that matter for your August 30 target. Planning case Sequence and estimated completion Pilot within the rollout The proposed schedule allows one week for mobilization, one for discovery, and two for design. The first rollout zone becomes the pilot. Rollout takes 18.75 weeks, cycle counting overlaps and two weeks for handoff follow. Including downtime, we expect to finish on August 4, 2027, 26 calendar days before the target. Standalone pilot Starting discovery on January 11, this sequence allows two weeks for discovery, three for design, and five for a separate pilot. With 18.75 rollout weeks, eight weeks of cycle counting (four overlapping rollout), two weeks for handoff, and one week of downtime, completion is approximately September 15, 2027, 16 calendar days after target. People and throughput Resource Planned contribution B&H project lead and warehouse manager One part-time lead for design, systems, and governance. One warehouse manager owns daily sequencing, priority issues, and access to each zone. B&H inventory team One inventory controller, one inventory control specialist, and five rollout technicians. The controller oversees reconciliation and exception handling. TurbineAero stockroom team Two TurbineAero employees work full time during rollout and provide site knowledge and access to approved inventory records. Up to 11 people across both teams at peak. At full deployment, the model allows 31.6 productive person-days per week. The 18.75-week rollout covers 432.5 person-days of verification and expected interruptions, plus 160 person-days for labels and flow. It assumes five working days per week and 80% floor utilization. Schedule decision. The August 4 forecast assumes full capacity for the modeled rollout. Under the staffing plan, five rollout technicians and two TurbineAero employees start four weeks after work begins in the first zone. We will agree on an earlier start or revise the forecast using actual pilot throughput before committing to a finish date.
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 7 PROJECT GOVERNANCE Reporting and handoff The B&H warehouse manager and your stockroom lead will reconcile each active zone daily. Each week the project lead will report progress against the baseline, the projected completion date and decisions needed from TurbineAero. Measure How the joint team will use it Verification progress Report distinct part numbers completed against the 15,000 baseline, by band. A line is complete once every in-scope location is reconciled or an exception has been accepted by TurbineAero. Stock and location accuracy Compare lines matching part, location, and quantity at first count with all lines counted. Show recounts separately so corrections do not mask the starting position. Serial and status exceptions Report mismatches by age, owner, and production impact. Keep affected stock on hold until TurbineAero Quality records its disposition. Production access Log priority issues from active zones, time from request to issue, and any repair jobs delayed. Review the oldest open request with the stockroom supervisor each day. Throughput and completion Compare verified part numbers per person-day by band with pilot rates. Use remaining volumes and available people to update the completion forecast. What TurbineAero receives After discovery An agreed scope register, current-state accuracy baseline, proposed location map, resource plan, and list of decisions for the pilot. After the pilot The time and exceptions observed by part band, approved counting and relabeling instructions, and a revised cost and schedule impact for any requested change. At handoff The verified location register, movement history, signed zone reconciliations, outstanding exceptions with owners, a cycle-count calendar, operating instructions, and a training record. Acceptance. The stockroom and quality leads review the final reconciliation and retained exceptions. The sponsor signs the handoff record once each open item has an agreed owner and disposition route.
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 8 PHASE 2 OPERATING STRATEGY Who will run the warehouse Once the stock register is reconciled, TurbineAero can choose who employs the stockroom team, who directs each shift, and who supports the operation after automation. We propose three operating models. Operating model Who runs the warehouse B&H and partner responsibilities A. Turnkey setup with remote B&H support TurbineAero employs the on-site team and covers each shift. B&H’s remote staffing would depend on order volumes, exceptions, and agreed support hours. B&H sets up the workflows, trains the team, and provides ongoing remote inventory support. We monitor exceptions, coordinate with suppliers and repair vendors, and review performance under agreed service hours. B. B&H-managed warehouse B&H would hire the current warehouse employees identified by both companies and assume full day-to-day operational control. We would manage shifts, training, stock control, urgent issues, and service performance. B&H would run the warehouse in FirstTRAC and lead the phased move into Lean-Lift with the automation partner. B&H would continue as operator after commissioning. We would agree on the number of transferring staff, shift coverage, employment terms, and the transfer date after reviewing the current roster. C. Turnkey handoff to the Lean-Lift partner TurbineAero retains its staff and operates every shift after commissioning. Its stockroom lead owns stock accuracy and production issues. This option assumes no ongoing B&H on-site positions after handoff. B&H prepares the stock data, location map, and workflows, then hands the implementation documents to your selected Lean-Lift partner. The partner commissions the equipment, trains operators, and provides technical support under agreed terms. What full supply chain integration would cover Under the remotely supported model, B&H would connect supplier order confirmations and inbound shipments to receipt, stock availability, production demand, repair-vendor returns and replenishment. Your buyer could see which repair jobs a late part affects and who is following it up. The same scope can be included in the B&H-managed model. B&H and your IT team would agree on where each transaction is recorded, how FirstTRAC exchanges order and inventory updates with your enterprise system, and who resolves mismatches. TurbineAero would retain purchasing authority, stock ownership and quality-release decisions under all three models. B&H FirstTRAC inventory and order visibility
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 9 PHASE 2 AUTOMATION AND HANDOFF Moving stock into Lean-Lift The 12,000 small-part numbers are the starting population for a feasibility study. We would use the verified stock profile and actual pick demand to decide which items belong in automated storage and which should stay in conventional bins or racks. Stage Work and acceptance evidence Select the stock B&H and TurbineAero profile dimensions, weight, on-hand quantities, demand by shift, packaging, and traceability needs. The partner checks tray capacity, site layout, and peak throughput. The result is a list of approved parts and quantities for each location. Prove a working zone Test a receipt, put-away, production pick, return, and urgent AOG issue. Trace a serialized item and reconcile the physical balance to the warehouse system. Test how the stockroom issues a critical part during an equipment or interface outage. Migrate in waves Load one agreed group of parts at a time. Record the old bin and new tray position, reconcile quantities and exceptions, then reopen the zone for production. TurbineAero and the designated warehouse operator authorize the next wave. Accept and hand over The partner demonstrates equipment operation and fault escalation. The designated operator demonstrates an urgent pick, a cycle count, and recovery from an interrupted transaction. Sign-off covers reconciled balances, trained staff, support contacts, and the maintenance arrangements. How we would compare the options We would compare each model against today’s cost per order line, time from request to issue, inventory accuracy, production delays caused by the stockroom, and floor space used. The business case would show one-time costs, annual operating costs, and the payback period, using your shift volumes and the partner’s equipment quote. Separate Phase 2 proposal. The USD 558,400 fee covers Phase 1. Once you select a model, B&H would quote transition, staffing or remote support, FirstTRAC, and integration separately. The Lean-Lift equipment, installation, and maintenance would be priced with the selected partner before you approve investment. Hänel Lean-Lift vertical storage system
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 10 B&H WORLDWIDE Aerospace logistics experience Founded in the U.K. in 1988, B&H Worldwide works exclusively in aviation and aerospace logistics. We support airlines, repair shops, manufacturers, and parts suppliers with forward stocking, engine movements, and 24/7 aircraft-on-ground support. Our 11 offices are in London, Frankfurt, Hamburg, Los Angeles, Miami, Hong Kong, Singapore, Brisbane, Melbourne, Sydney, and Auckland. Our FirstTRAC platform links stock records to photographs, documents, and movements. Customer references Ontic Aerospace / OEM inventory Ontic appointed B&H for a global warehousing program covering more than 3,000 items and supporting its exchange program in the U.S., U.K., and Singapore. The scope calls for packaging, consignment, and document checks at receiving and shipping. Those same controls inform our proposed checks for TurbineAero’s rotables. Ontic global warehousing announcement, October 2025 AerFin / Six-aircraft teardown B&H coordinated the on-site identification, segregation, packing and storage of parts from six A330-200 aircraft in Hong Kong. FirstTRAC linked inventory to photographs and documents. This shows how we preserve component identity through repeated physical moves. “B&H Worldwide was an indispensable partner in our groundbreaking A330-200 disassembly project at HKIA.” Simon Bayliss, Chief Operating Officer, AerFin AerFin project completion, July 2025 Icelandair Technical Operations / Urgent spares Icelandair renewed its global time-critical spares arrangement with B&H in 2022. The Heathrow coordination team and U.S. support in Los Angeles and Miami provided coverage for urgent requirements. This experience informs the priority-issue and escalation route we propose for your production teams. Icelandair contract renewal, June 2022 Industry recognition. The Global Institute of Logistics named B&H the Best-in-Class Global Aerospace Logistics Company. B&H also received the 2022 Queen’s Award for Enterprise in International Trade.
B&H WORLDWIDE TURBINEAERO B&H Worldwide / Confidential proposal for TurbineAero 11 QUALITY AND ASSURANCE Accreditations and mobilization Our warehousing procedures cover part identification, receiving checks, stock status, and record retention. Before mobilization, we will map the applicable B&H procedures and personnel qualifications to your site’s own quality and access requirements. Credential or recognition Scope and relevance AS9120B / EN 9120:2018 and ISO 9001 B&H’s aerospace distribution and quality management certifications are assessed by LRQA. They underpin our documented handling, traceability, and corrective-action procedures. Authorised Economic Operator (AEO) B&H’s U.K. entity has held AEO status since 2008 for customs and supply- chain security. The authorization applies within its approved jurisdiction. IATA and BIFA B&H is an IATA-registered cargo agent. IATA lists both U.S. and U.K. entities. The U.K. business is affiliated with the British International Freight Association (BIFA). Aviation security and dangerous goods B&H operates screening under relevant TSA or CAA arrangements at approved locations. Dangerous goods work requires trained personnel for the specific activity and site. Cyber Essentials and Carbon Literacy ADS lists U.K. Cyber Essentials for B&H Worldwide Ltd. The Carbon Literacy Project recognized B&H as a Bronze Carbon Literate Organisation in 2024. Quality certifications Accreditations and awards U.K. industry profile IATA U.S. listing Next step Phil, we propose a site walkthrough with your stockroom, production, quality, and systems leads. We will review the stock extract and floor plan, select the pilot zone, and confirm staffing and equipment. Your quality team can identify restricted parts and technical data so we can confirm site access and appropriate work authorizations. We can then agree on the Phase 1 scope, commercial terms, and start date. For Phase 2, we would use the walkthrough to identify your preferred operating model and the data needed for a cost comparison. Darrel Young Business Development Manager / B&H Worldwide