R01 Ventilation 22.06.2026

To, Shiva Sir Pune Date : 22-Jun-2026 SUBJECT: Offer for Ventilation system for cafe at Chandani Chowk. Sr.No. Description Qty. Unit Rate Rs. Amount Rs. LOW SIDE 1.0 SITC of 7000 cfm Exhaust Fan 40 mm static 1 Nos 86240 86240 2.0 SITC of GI Factory Fabricated Duct 22G GI Duct 590 Sqft 117 69030 3.0 SITC of GI Bird Mesh 1 Nos 800 800 4.0 Canvas Conection 1 Nos 1200 1200 6.0 MS support for Ducting 4 Nos 700 2800 7.0 Wall Mounted GI 22 Gauge Kitchen Hood 22 Feet 3000 66000 7.0 Wall Mounted SS 22 Gauge Kitchen Hood 0 Feet 4000 0 8.0 Damper for Duct to control Air above Hood 8 Nos 800 6400 9.0 Fabrication Stand for Fan 1 Nos 6500 6500 Low Side Total Amount Rs. 238970 GST tax @ 18% 43015 Total with GST 281985 Matahdi extra, Core cut extra. Terms & Conditions : 1. Above price are all inclusive taxes & duties. (A) For AC unit 100% advance. (B) For low side work 50 % advance payment along with P.O. , (C) 40% after delivery of material at site. (C) Balance payment after the commissioning of units within one week. 2. Validity – Up to 3 days from the date of this offer. Excluded work : The Work which you will have to arrange from other agency is : 1. Suitable electrical power supply for outdoor units through M.C.B. 2. Any Type of civil work like breaking of wall and making the finish of the same. 3. Provision of water and electricity for erection and commissioning. 4. Installation / Servicing access to the units which are located above 3 Mtr. to be arrange by client. 5. Any other item not specifically mentioned in our offer. valued order. Should you require any more clarifications please fill free to contact us. Thanking you and assuring you of our best attention at all times. Pradip Kotkar EMPEROR ENTERPRISES BR1 319, Jai Ganesh Vision Akurdi, Pimpri-Chinchwad-411035 emperorenterprises2018@gmail.com Cell: 9011439849. refrigerant piping in walls/floor. However, it is mandatory for project then client has to ensure the protection Note – The above quantities are based on the tentative layout and any variation either upward or downward, shall be adjusted as per the final measurements. 6. After pump down existing VRF system issue will be resolved at acutal cost 7. Note - Kindly note that after the laying the 'cu' piping, drain piping and electrical cabling if we do not get clearance for connecting the indoor unit and outdoor within one week of installation of respective units, the responsibility of protecting work carried out by us lies with client or other agency deputed by client. In case any damage to the work carried out by us (in this period) is noticed while connecting the units the same will be brought to the notice of client. The rectification work shall be carried out at extra cost (depending on damage) and any other work such as any type of civil work, false ceiling, carpentry work, painting, touchup etc require to rectify the damage will be arranged by client at his cost. Generally we do not recommend any concealment of for the same. We hope that above is in line with your requirement and now look forward to the pleasure of receiving your Yours truly, For Emperor Enterprises 9011439849