EPC Catalogue Rexline Engineering

EPC E N G I N E E R I N G · P R O C U R E M E N T · C O N S T R U C T I O N Conveyors, crushing, jetties and ports, storage tanks, workshops, camps, housing and hauling roads engineered, procured, fabricated, built and commissioned under one contract.W W W. R E X L I N E E N G I N E E R I N G . C O M · S A L E S T E A M @ R E X L I N E E N G I N E E R I N G . C O M2 0 2 6 E D I T I O N

P T R E X L I N E E N G I N E E R I N G I N D O N E S I AC O A L H A N D L I N G FA C I L I T Y, J E T T Y A N D P L A N T — E N G I N E E R E D, B U I LT A N D C O M M I S S I O N E D B Y R E X L I N E One contract, from the drawing to the running plant. Most owners assemble an EPC package from a designer, a fabricator, a civil contractor and an installer, then spend the project managing the gaps between them. Rexline holds all four. Engineering, procurement, fabrication, civil, erection and commissioning sit in one organisation one contract, one programme, one party accountable for the result.INTEGRATEDEPC /EPCM ·INDONESIA02

C O R P O R A T E O V E R V I E WGlobal strength. Local execution. PT Rexline Engineering Indonesia is an Engineering, Procurement and Construction Management company and a member of an established Australian engineering group. Over 750 engineers, technicians and field personnel operate across Indonesia, delivering large-scale industrial, mining and infrastructure projects to international standards with local execution capability. 750+ E N G I N E E R S , T E C H N I C I A N S & F I E L D P E R S O N N E L 23,000 L A M O N G A N H E AV Y FA B R I C AT I O N FAC I L I T Y 2 C O N T I N U O U S P R O D U C T I O N M O D E L 3 9 0 0 1 · 1 4 0 0 1 · 4 5 0 0 1 C E R T I F I E D people m² yard shifts ISO systemsM E M B E R O F A N A U S T R A L I A N E N G I N E E R I N G G R O U P03 P R O C E S S P L A N T C O N S T R U C T I O N — H O T WAT E R T R E AT M E N T FA C I L I T Y

C A P A B I L I T Y ELEVEN KINDS OF CRITICAL INFRASTRUCTURE Design, engineer, procure, fabricate and construct the infrastructure that a mine, plant or terminal cannot run without from the crusher feed to the barge, from the access road to the accommodation block. Mining — coal, copper, gold and nickel · Power generation · Fertiliser and agro-industry · Cement and chemicals · Logistics and bulk terminals Bulk material handling systems Conveyor systems Transfer stations Heavy industrial infrastructure Workshops and warehouses Jetty, port and marine structures Storage tanks and silos Remote and industrial site facilities Remote camps and housing Hauling roads Access bridges Fuel and power infrastructure P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 04

W H Y R E X L I N ESIX THINGS YOU STOP HAVING TO MANAGE 01 Complex EPCM packages executed in remote locations and challenging operating environments, from Kalimantan to Papua. 02 Over 750 skilled personnel, an owned fabrication plant, mobile equipment fleets and site-ready construction teams. 03 Australian engineering practice applied with Indonesian licensing, statutory compliance and cost structure. 04 All major disciplines under one roof — streamlined delivery, controlled cost, single-point accountability. 05 Domain depth in mining, power, fertiliser and bulk infrastructure rather than general contracting. 06 ISO 45001 aligned HSE, quality systems and risk management applied from mobilisation to handover. One interface instead of five. A fabrication queue that follows your erection sequence rather than another client's order book. And a contractor who cannot blame the designer, because the designer works for the same company.E N G I N E E R I N G · P R O C U R E M E N T · C O N S T R U C T I O N · C O M M I S S I O N I N G05

01 How we deliver Ten disciplines, one company accountable for all of them. Engineering, procurement, fabrication, quality, logistics, civil works, erection, electrical, commissioning and HSE each performed by Rexline, on one programme, against one contract. Civil, structural, mechanical, electrical and instrumentation design to SNI and international codes. Material sourcing, vendor management, inspection, traceability and expediting. 23,000 m² owned yard at Lamongan, two shifts, blasting and painting in- house. Earthworks, foundations, erection, mechanical, electrical and instrumentation installation. Pre-startup checks, cold and hot commissioning, performance testing and handover. ITPs, NDT, dimensional and coating inspection, and the quality dossier issued with the asset.E N G I N E E R · P R O C U R E · F A B R I C A T E · C O N S T R U C T · C O M M I S S I O N06

H O W W E D E L I V E R 0 1 DESIGNED TO THE CODE THAT THE PERMIT IS ISSUED AGAINST Every design follows Indonesian SNI standards and the applicable government construction codes, with international codes integrated where the structure, the equipment or the client specification requires them. Permit drawings are prepared to the licensing procedure that actually applies — PU, Perhubungan, or MIGAS for fuel systems. SNI and applicable government construction codes, with ACI, AISC, API, ASTM, ASME and IEC integrated for structural, marine and mechanical systems. AutoCAD, Tekla Structures, STAAD Pro, SolidWorks, Helix and SAP2000 — model-based, so the fabrication drawings come from the analysis model rather than from a redraw. Capital cost estimation and feasibility · material flow simulation and optimisation · procurement assistance and vendor management · 3D modelling, CAD and BIM support. Available as a standalone consultancy scope, not only inside a construction contract. Foundation design, marine and land Pile caps, columns, beams, slabs Jetty platforms and deck systems Seismic and geotechnical integration Crushing systems, conveyors, hoppers Tanks and process equipment P&ID, GA and fabrication drawings Thermal and stress analysis LV/MV systems and distribution panels Cable tray layout and single-line diagrams SCADA and PLC integration Earthing, lightning protection, power studies P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 07

H O W W E D E L I V E R 0 2STRUCTURES DESIGNED FOR THE GROUND THEY SIT ON Foundation design for marine and land-based structures, analysed in STAAD Pro and Tekla Structures with seismic and geotechnical inputs from Rexline's own investigation so the soil parameters in the model are the ones measured on site, not assumed from a nearby project. Foundation design, marine and land-based Pile caps, columns, beams and slabs Jetty platforms and deck systems Seismic and soil geotechnical integration Construction drawings and BOQs Compliance with SNI, ACI and international codesC I V I L & S T R U C T U R A L D E S I G N08 C A S T - I N - S I T U D E C K C O N S T R U C T I O N O V E R WAT E R — R E I N F O R C E M E N T A N D F O R M W O R K

H O W W E D E L I V E R 0 3 EQUIPMENT DESIGNED AGAINST THE MATERIAL IT WILL HANDLE Crushing systems, conveyors, hoppers and tanks are sized from the throughput, the material characteristics and the plant layout — then modelled, analysed and issued as fabrication drawings by the same team that will build them. Transfer points, chute geometry and belt selection decide how much a bulk handling system costs to run and how often it stops. Those decisions are made at design stage, with the process engineer in the room — not corrected in the field once the plant is commissioned. Design of crushing systems, conveyors, hoppers and tanks Preparation of P&ID, GA and fabrication drawings Thermal and stress analysis of mechanical systems Integration with electrical and automation systems Development of equipment lists and installation plans Material flow simulation and transfer-point optimisation P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 09

H O W W E D E L I V E R 0 4E L E C T R I C A L & I N S T R U M E N T A T I O NPOWER AND CONTROL, DESIGNED AS ONE SYSTEM LV and MV distribution, control architecture, instrumentation and protection designed together with the mechanical package, so the drive, the starter, the cable and the control philosophy are specified against the same duty. Panels and skid-mounted electrical rooms are assembled, wired and function-tested at the workshop, then delivered as complete units. Site work becomes a set of terminations rather than a build. LV/MV electrical systems and distribution panels Cable tray layout and single-line diagrams SCADA and PLC system integration Earthing, lightning protection and power studies Instrumentation and control panel specifications Control system architectureE L E C T R I C A L & I N S T R U M E N T A T I O N E N G I N E E R I N G10 D I S T R I B U T I O N A N D C O N T R O L PA N E L A S S E M B LY

H O W W E D E L I V E R 0 5F A B R I C A T I O N — L A M O N G A NWE OWN THE WORKSHOP THAT BUILDS YOUR EQUIPMENT A 23,000 m² fabrication yard at Lamongan, East Java, running two continuous shifts with 210 personnel across fabrication, QC, logistics and surface treatment. Structural steel, tanks, conveyors, trestles and heavy modular assemblies are built, coated and trial-fitted here before anything is shipped. Heavy modular assemblies for jetty and plant structures are trial-fitted in the yard and match-marked. Welders are qualified to ASME Section IX and fabrication follows the welding quality requirements of ISO 3834. The dimensional record travels with the steel. CNC plasma cutting up to 140 mm Bending machine for 30 mm plate, 350 tonnes Laser cutting, 15 mm and below Plate rolling to 30 mm Heavy-duty lathe, 1.8 m diameter drum capacity Milling, shearing and cutting machines Dedicated sandblasting and painting rooms In-house roller and pulley production lineH E A V Y F A B R I C A T I O N · L A M O N G A N , E A S T J A V A11

H O W W E D E L I V E R 0 6 Q U A L I T Y A S S U R A N C E & C O N T R O L CHECKED AS IT IS BUILT, NOT AFTER IT ARRIVES Quality is a sequence of hold points inside the programme, not a final inspection. Each is recorded against the Inspection and Test Plan agreed at kick-off, and the evidence is issued with the asset. D I M E N S I O N A L Visual and dimensional inspection on all fabricated items, against the issued-for-construction drawings. N D T Ultrasonic testing, radiographic testing and magnetic particle testing to the project specification. P R E S S U R E Hydrostatic testing for tanks and pressure vessels, witnessed and certified. C O AT I N G Coating inspection and dry film thickness testing at each stage of the paint system. R E C O R D S Inspection and Test Plans and Quality Dossiers compiled as the work proceeds. R E L E A S E Final dimensional, welding, coating and documentation check before despatch. Mill certificates, welding procedure and welder qualification records, NDT reports, dimensional records, hydrotest certificates and coating inspection reports — compiled as the work is built, not reconstructed at handover. P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 12

H O W W E D E L I V E R 0 7S H I P P I N G & L O G I S T I C SGETTING IT THERE IS PART OF THE ENGINEERING Remote is the normal case — Kalimantan, Sulawesi, Papua. Module size, field joints, packing and shipping sequence are set during design, because a damaged member cannot simply be sent back. In-house logistics team for sea and land freight Break-bulk and containerised shipping from the yard Export packaging, crating and container stuffing Customs documentation and clearance support Delivery tracking from yard to job site Heavy lift coordination for over-dimensional cargoL O G I S T I C S & D E L I V E R Y13 O V E R - D I M E N S I O N A L LO A D - O U T — R O TA R Y D R U M O N LO W B E D

H O W W E D E L I V E R 0 8 C I V I L W O R K S THE PART OF THE JOB THAT DECIDES THE PROGRAMME Earthworks and foundations set the date the steel can be erected. Rexline self-performs them, which is why the civil sequence is planned around the fabrication release schedule rather than negotiated with a separate contractor once the modules are already on site. Where Rexline performs the soil investigation, the foundation design uses the measured SPT and CPT results directly. Where the client supplies the data, the design basis and any assumption made from it are stated in the drawing set. Site clearance, grubbing and earthwork operations Foundation works including bored piles and footings Paving, concrete flooring and plinth beam construction Stormwater drainage systems and culvert installation Gabion walls, slope protection and road embankment Heavy-duty pavement for workshops and warehouses P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 14

H O W W E D E L I V E R 0 9S I T E I N S T A L L A T I O N & C O M M I S S I O N I N GINSTALLED AND STARTED BY THE PEOPLE WHO BUILT IT Erection is a setting-out exercise when the party that set the fabrication tolerance is the party holding the instrument. Rexline crews complete structural, mechanical, electrical and instrumentation installation and carry the plant through to handover. Steel erection using cranes and hydraulic jacks Mechanical alignment, bolting and coupling Electrical panel mounting, cable laying, terminations Instrumentation, testing and system commissioning Pre-startup checks, cold and hot commissioning HSE supervision and safety audits during installationI N S T A L L A T I O N & C O M M I S S I O N I N G15 S T R U C T U R A L E R E C T I O N — C R A N E L I F T A N D A L I G N M E N T

H O W W E D E L I V E R 1 0 H S E & Q U A L I T Y M A N A G E M E N T SAFETY IS A PRODUCTION SYSTEM, NOT A POSTER HSE policies are aligned to ISO 450012018 and Indonesian regulations, and applied through the same planning cycle as production — risk assessed before the task, permitted at the task, audited after it. ISO 9001  2015 Quality management systems ISO 14001  2015 Environmental management systems ISO 45001  2018 Occupational health and safety management systems Certified for engineering, procurement, construction management and in-house manufacturing EPCM/IM, covering mechanical, civil, heavy electrical and instrumentation engineering for construction; conveyor systems; barge loading systems; tripper cars; jetty construction; heavy fabrication works; workshops, weighbridges, crushing systems, wear protection, bulk material handling systems; workshop, warehouse and mining camp; hauling and mining roads; nursery, mother bench for forestry housing; dewatering systems; detailed engineering consultation; soil work and land clearance; geotechnical survey; operational maintenance. Certificate numbers and validity dates are reproduced on page 28 from the certificates supplied. Confirm current validity with the certification body before the pack is submitted with a bid. HSE policies aligned with ISO 450012018 and Indonesian regulations Risk assessments, toolbox talks and site safety inspections Permit to Work, Lockout-Tagout and emergency response Quality Dossiers, ITPs and inspection checklists Client audits and third-party certification readiness Incident reporting, investigation and corrective action P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 16

02 What we build A specialist contractor quotes one package. Rexline quotes the facility — the jetty and the conveyor that feeds it, the crusher and the road that serves it, the tank farm, the workshop and the camp that keeps the crew on site. 5,000– 50,000 D W T V E S S E L R A N G E , P I L E - S U P P O R T E D J E T T I E S 100– 2,000 T P H C R U S H E R S Y S T E M CA PAC I T Y 62–2,000 K L R E X S TO R ® F U E L TA N K R A N G E50–500P E R S O N N E L P E RT U R N K E Y CA M PM A R I N E · C R U S H I N G · C O N V E Y I N G · T A N K S · H O U S I N G · R O A D S · P O W E R17

W H A T W E B U I L D 0 1P O R T , J E T T Y & M A R I N E I N F R A S T R U C T U R EJETTIES FOR VESSELS FROM 5,000 TO 50,000 DWT Pile-supported jetties, mooring and breasting dolphins, trestles, cargo yards and the shore infrastructure behind them — designed for coastal exposure and built with Rexline's own marine piling and steel. A 1.1 km barge loading conveyor and jetty, with 853 tonnes of structural steel self-performed. A 10,000 DWT jetty with 1,000 TPH barge loading. A multi-purpose cargo jetty for PT Global Papua Abadi. Pile-supported jetties for 5,00050,000 DWT vessels Concrete or steel piles using marine piling rigs Cast-in-situ and precast deck systems Mooring and breasting dolphins, fenders and ladders Walkway trestles and pipe racks jetty to shore Hot-dip galvanising and marine-grade coatings Cargo yards and loading aprons Security fencing, automated gates and lighting Integration with conveyor and jetty systems Port control and administration buildingsM A R I N E & P O R T I N F R A S T R U C T U R E18C O A L H A N D L I N G FA C I L I T Y — J E T T Y, T R E S T L E A N D S H O R E P L A N T

W H A T W E B U I L D 0 2 C R U S H I N G S T A T I O N S FROM 100 TPH TO 2,000 TPH, SKID-MOUNTED OR FIXED Primary and secondary crushing configurations, screening, magnetic separation and reclaim feeding — supplied as a complete station with the structure, the chutes, the electrics and the dust control designed as one package. Rollers and pulleys come off Rexline's own production line at Lamongan with complete QA/QC instrumentation, and the sandblasting and painting rooms are on the same site — so the wear components of a crushing station are not a third-party lead time. Crusher systems from 100 TPH up to 2,000 TPH Primary jaw crushers with grizzly feeders, 250 300 mm input Secondary cone crushers with vibrating screens, 50 mm output Skid-mounted or mobile crushing units, 500700 TPH Rotary and vibrating screening solutions Self-cleaning magnetic separators integrated with conveyors Reclaim feeders for controlled material flow Dust suppression and water spray systems Mounting on steel skids for relocation Integration with MCC panels, gensets, lighting and safety systems P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 19

W H A T W E B U I L D 0 3B A R G E L O A D I N G C O N V E Y O R S Y S T E M SCRUSHER TO BARGE, AS ONE SYSTEM Overland conveyors from the crushing station to the barge loading jetty — structure, mechanicals, protection and controls engineered together so the belt, the trestle and the loading head are matched to the same throughput. 950 tonnes of structural steel self-performed on a 3 km overland conveyor. 853 tonnes on a 1.1 km barge loading conveyor and jetty. Both engineered, fabricated, shipped and erected by Rexline. Overland conveyors, crushing station to barge loading jetty Transfer towers, conveyor galleries and radial stackers Steel trestles for conveyor alignment over uneven terrain Belt safety: misalignment, pull-cord and rip sensors Dust control chutes and retractable telescopic loading heads Drive head, tail pulley, take-up unit and counterweight installationB U L K M A T E R I A L H A N D L I N G20 O V E R L A N D C O N V E Y O R T O B A R G E LO A D I N G J E T T Y

W H A T W E B U I L D 0 4F U E L S T O R A G E T A N K S Y S T E M SREXSTOR® — 62 KL, 500 KL AND 2,000 KL Double-walled tanks with bund walls and leak detection, integrated dispenser pumps rated 40300 LPM with canopies, and full fuel-system safety fittings — hydrotested, certified and compliant with MIGAS requirements and API 650. Design and fabrication of RexStor® fuel tanks: 62 kL, 500 kL, 2,000 kL Double-walled tanks with bund walls and leak detection Integrated dispenser pumps, 40300 LPM, with canopies Flame arrestors, pressure vacuum vents and float gauges Coating systems for fuel compatibility and corrosion resistance Hydrotest, certification, MIGAS and API 650 complianceF U E L & S T O R A G E I N F R A S T R U C T U R E21 H O R I Z O N TA L F U E L FA R M — B U N D E D, P I P E D A N D C O M M I S S I O N E D

W H A T W E B U I L D 0 5 I N D U S T R I A L H O U S I N G S O L U T I O N S LIGHT GAUGE STEEL, BECAUSE THE SITE HAS NO BATCHING PLANT Staff housing built from Light Gauge Steel Framing and pre-engineered panels — rolled, cut and packed at the yard, assembled quickly on site by a small crew, and specified for tropical conditions rather than adapted to them. Permanent accommodation is usually on the critical path for mobilising the workforce that builds everything else. LGSF removes wet trades, formwork and curing time from that path, and the panels travel in the same containers as the rest of the package. Design and construction of staff housing using Light Gauge Steel LGSF Modular units from 60180 sqm with steel frames and foam concrete walls Quick assembly in remote sites using pre-engineered panels Thermal insulation and soundproofing for tropical environments Integration with solar lighting and water heating systems Flexible layouts for single, family and dormitory arrangements P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 22

W H A T W E B U I L D 0 6C O N S T R U C T I O N C A M P STURNKEY CAMPS FOR 50 TO 500 PERSONNEL Accommodation, offices, kitchens and sanitary blocks prefabricated and fitted out at the yard, then delivered complete with the water, power, sewage and security systems that make a camp liveable from the first night. Turnkey camp solutions for 50500 personnel Prefabricated dormitories, offices, kitchens and sanitary blocks Complete MEP services with solar and diesel backup generators Water treatment, sewage systems and fire protection Perimeter fencing, CCTV and access control integration Camp maintenance and operational supportR E M O T E S I T E F A C I L I T I E S23 C O N TA I N E R I S E D C A M P M O D U L E S , F I T T E D O U T B E F O R E D E S PAT C H

W H A T W E B U I L D 0 7 H A U L I N G R O A D D E V E L O P M E N T BUILT FOR 30 TO 100 TONNE HAULAGE, IN THE WET SEASON A haul road is a pavement problem, not an earthworks problem. Layer thickness, base material, compaction and drainage are designed against the axle load and the rainfall — which is why Rexline roads stay open when the haulage fleet is at its heaviest. A 58 km mining hauling road and a 47 km hauling road, both constructed through forested and undulating terrain with the drainage, embankment and slope protection designed as part of the same scope. Lengths are as recorded by the project team; confirm the scope split before quoting them in a bid. Design of 30T100T heavy haulage access roads Grubbing, cut-and-fill balancing and compaction Crushed stone base layers and geotextile stabilisation Drainage design: culverts, side ditches and cross drains Signage, lighting and gradient control for safe operations Gabion walls, slope protection and road embankment P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 24

W H A T W E B U I L D 0 8P O W E R & E L E C T R I C A L S Y S T E M SPOWER ON A SITE THAT HAS NO GRID BEHIND IT Generator rooms, switchyards, distribution and protection designed for continuous operation where an outage stops production and there is no utility to call. Solar-diesel hybrid systems are used where fuel logistics are the real constraint. Crusher and conveyor starting currents, not nameplate ratings, decide generator and cable sizing. Because Rexline engineers the mechanical package as well, the electrical design is built on the actual duty rather than on a supplier's data sheet. Generator room design, cabling and synchronisation panels Transformer installation and switchyard construction Cable routing for control, lighting and power loads Earthing systems, lightning protection and surge arrestors 24/7 backup solutions using solar-diesel hybrid systems MCC integration with plant, lighting and safety systemsP O W E R & E L E C T R I C A L I N F R A S T R U C T U R E25

W H A T W E B U I L D 0 9 G E O T E C H N I C A L & S U R V E Y S E R V I C E S THE INVESTIGATION THAT THE FOUNDATION DESIGN DEPENDS ON Rexline performs its own site investigation and survey, so the parameters used in the structural model are measured on the site being built — not interpolated from a neighbouring project or assumed to a conservative default that is paid for in concrete. Foundation quantities are the single largest source of cost growth on a remote industrial project. A properly executed SPT and CPT programme at tender stage usually costs less than one week of the variation it prevents. Rexline is also engaged on engineering-only scopes: feasibility studies for mining development, engineering design and supervision for site facilities, and engineering consultancy for mill and port developments — delivered as a standalone deliverable, with no obligation to award the construction to the same party. Standard Penetration Test SPT) and Cone Penetration Test CPT Soil sampling and laboratory classification Soil resistivity testing for earthing system design Topographic and bathymetric surveys using GPS and sonar Geotechnical report preparation for structural foundations Setting-out and as-built survey during construction P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 26

W H A T W E B U I L D 1 0W O R K S H O P S , W A R E H O U S E S & P E BWORKSHOPS, WAREHOUSES AND WEIGHBRIDGES Pre-engineered buildings for maintenance workshops, warehouses, offices and plant buildings — designed, fabricated at Lamongan, erected and fitted out, including the heavy-duty floor slab that a haul truck workshop actually needs. A permanent workshop and office complex, a long-span T-workshop erected across multiple zones, a coal washing plant building, weighbridges, and 33 km and site-perimeter fencing packages including a conflict-zone deployment. Portal frames and long-span structures Maintenance workshops Warehouses and stores Site offices and control buildings Overhead crane runways Heavy-duty floor slabs and pavement Weighbridge structure and civil interface Fencing, gates and site security MEP fit-out and servicesB U I L D I N G S & S I T E I N F R A S T R U C T U R E27 H E AV Y V E H I C L E W O R K S H O P — C O M P L E T E D A N D H A N D E D O V E R

R E F E R E N C E C O M P A N Y L E G A L I T Y & C E R T I F I C A T I O N LICENSED, CERTIFIED AND AUDITED TO OPERATE PT Rexline Engineering Indonesia holds Indonesian construction and consultancy business licences and three certified international management systems. Personnel hold the individual competency certificates the work requires. ISO 9001  2015 Quality management 24RN03HN · Royal Impact Certification Ltd ISO 14001  2015 Environmental management 24RN03HO · Royal Impact Certification Ltd ISO 45001  2018 Occupational health & safety 24RN03HP · Royal Impact Certification Ltd 912050371157200080001 41011 Konstruksi Gedung Hunian 18 January 2023 202606250953057921893 41013 Konstruksi Gedung Industri 28 July 2026 130624005306700140001 71101 Arsitektur · 71102 Keinsinyuran · 74120 Desain Interior 6 January 2025 912050371157200050003 43291 Instalasi Mekanikal 6 December 2023 NIB 9120503711572 · Status penanaman modal: Penanaman Modal Asing PMA. Certificate numbers and dates are transcribed from the certificates supplied and are reproduced for reference only; the certificates themselves are issued on request and should be verified before a bid submission. SNI-compliant, made in Indonesia · value engineering applied to every package · an estimated 610% reduction in energy consumption through design optimisation · local manpower employed and trained. The energy figure is Rexline's own design-stage estimate and is confirmed case by case. ISO management systems · SBU Konstruksi · IUJP Licensed engineering software Heavy equipment and tools safety certification Building, K3 and welding certification · BPJS registration POM, POU and POP mining supervisory certification Construction service, civil, mechanical and electrical Certified welders HSE safety and quality management system personnel P T R E X L I N E E N G I N E E R I N G I N D O N E S I A 28

S U M M A R YW H Y R E X L I N ETEN REASONS TO GIVE REXLINE THE EPC 01 Engineering, procurement, fabrication, civil, erection and commissioning inside one organisation. 02 A 23,000 m² yard at Lamongan on two shifts — your programme sets the queue, not a subcontractor's order book. 03 Engineers, technicians and field crews deployed across Indonesia, with mobile equipment fleets. 04 International engineering practice applied with Indonesian licensing and cost structure. 05 Capability developed around bulk handling, crushing, marine and remote infrastructure. 06 ISO 9001, ISO 14001 and ISO 45001 certified, with SBU construction and consultancy licences. 07 SPT, CPT and survey performed in-house, so the design basis is measured rather than assumed. 08 LCT and break-bulk logistics supporting island, coastal and inland mining projects. 09 ITPs, NDT reports, dimensional and coating records compiled as built, issued at handover. 10 Designed for how the asset will be operated, maintained and expanded — not only for how it is built. 1,800 t S E L F - P E R F O R M E D S T E E L , T W O C O N V E YO R PAC K AG E S 58 km LO N G E S T H AU L I N G R OA D PAC K AG E 2,000 kL L A R G E S T R E X S TO R ® TA N K CA PAC I T Y3I S O M A N AG E M E N TS Y S T E M S C E R T I F I E DP T R E X L I N E E N G I N E E R I N G I N D O N E S I A29

Send us the scope. We will send back a price, and the assumptions with it. A described scope, the site location, the throughput or capacity you need and your programme dates are enough to start. Where the design is not yet fixed we price on a stated basis and issue the assumptions and qualifications with the offer — so the basis is visible before award rather than argued after it. Jl. Raya Kupang Baru No. 74, Sonokwijenan, Kec. Sukomanunggal, Surabaya, Jawa Timur 60189 KM 10 Jalan Raya Mantub, Dsn. Takeranklanting, Ds. Takeranklanting, Kec. Tikung, Lamongan, Jawa Timur 62280 salesteam@rexlineengineering.com Akhil 62 811 1910 3695 Rani 62 811 1910 3700 www.rexlineengineering.comE P C · 2 0 2 6 E D I T I O N30 O V E R L A N D C O N V E Y O R A N D B A R G E LO A D I N G FA C I L I T Y, I N O P E R AT I O N