Braddock Avenue Facade Improvement Pilot Progress Report

Forged x Four Enterprise Zone | Braddock Avenue Facade Improvement Pilot 1 BRADDOCK AVENUE FACADE IMPROVEMENT PILOT From Pilot to Corridor-Wide Investment Forged x Four launched a $64,308 facade improvement pilot to begin addressing storefront and property conditions along Braddock Avenue. The pilot has tested the program on a smaller scale, moved projects from ideas into construction, and demonstrated the range of needs - and opportunities - that exist along the corridor. $47,307 facade grants committed $57,262 total investment in funded projects $9,956 private investment / match $10,000 additional greening grant BUILDING ON THE INVESTMENT Greening the corridor An additional $10,000 grant from Jefferson Regional Foundation is helping Forged x Four incorporate plants and trees alongside facade improvements - extending the impact beyond individual storefronts to the appearance and experience of the corridor itself. The pilot is showing that facade dollars can: • Address critical repairs • Support continued private reinvestment • Preserve historic character • Help return underused properties to active use • Strengthen the corridor beyond individual storefronts The pilot gave Forged x Four the opportunity to test the program, build a pipeline and learn what property owners need to move projects forward. The forthcoming NAP investment provides the opportunity to take what is working and bring it to scale. FROM INDIVIDUAL PROPERTIES TO A STRONGER CORRIDOR The projects on the following pages show the pilot at work - completed improvements, active construction, adaptive reuse, historic preservation and a growing pipeline of businesses receiving technical assistance.

Forged x Four Enterprise Zone | Braddock Avenue Facade Improvement Pilot 2 BRADDOCK AVENUE FACADE IMPROVEMENT PILOT Proof on the Ground Projects are already moving from award to construction and completion. Just as important, the pilot is supporting very different kinds of properties and businesses - from long-standing small businesses to mixed-use redevelopment. COMPLETE | SMALL-BUSINESS VISIBILITY Aunt Cheryl's Cafe The pilot's first awardee completed a bold new entrance ahead of the NFL Draft, helping the cafe stand out to visitors while expressing the personality of the business. Grant: $8,800. COMPLETE + CONTINUED INVESTMENT | REPAIR Hocky Bros. Auto Parts An initial $1,066 award replaced badly damaged storefront windows. The business then moved into a second phase of exterior work, including power washing and repainting - an example of one improvement leading to continued reinvestment. FUNDED + UNDERWAY | ADAPTIVE REUSE 917 Braddock Avenue A long-vacant historic building is being carefully restored and returned to productive use. The property retains significant original details - including six fireplaces - and is planned for retail on the first floor with two one-bedroom apartments above. $14,862 grant toward a $22,224 project. FUNDED | ACTIVE COMMERCIAL SPACE Mon Valley Initiative / Free Press Building Facade investment is strengthening a multi-tenant commercial property whose commercial space is now fully leased. MVI received two bids, selected a contractor and is preparing to begin work. $10,075 grant toward a $12,650 project. Funded + in progress | Greening Hocky Bros. Phase II Funded + in progress | Exterior improvement A Braddock flower farm is using the program for property improvements that connect naturally to the corridor's broader greening work. Grant: $7,518.72. After completing its window project, Hocky Bros. received a second $4,985 award for power washing and repainting. Sol Patch Garden (Braddock Gateway)

Forged x Four Enterprise Zone | Braddock Avenue Facade Improvement Pilot 3 BRADDOCK AVENUE FACADE IMPROVEMENT PILOT Building the Next Pipeline The pilot is not winding down. Additional projects are moving through architect review, scope development and application - creating a ready pipeline for continued corridor investment. ARCHITECT / SPECIALIST REVIEW | HISTORIC PRESERVATION The DeNardo Clock: bringing a Braddock landmark back The iconic DeNardo Jeweler's clock stood for decades at 837 Braddock Avenue and was remembered as a prominent feature of the commercial district. The proposal would restore the clock to working order, return its original green appearance, repair the metalwork and clock face, illuminate it and reinstall it in front of the Braddock Arts and Media Building at 818 Braddock. A Cincinnati-area clock restoration company visited the week of September 14 to photograph and measure the clock and is preparing a detailed restoration quote. The current project estimate is $26,400; the facade program can provide up to $15,000. Architect review + technical assistance Mele Brothers & Sister Florist Architect consultation completed September 17; drawings are in development. Architect consultation September 25; exploring minor cracking repair, new signage and LED lighting. SC Salon Working through architect/design consultation to define the project scope. BEYOND THE FACADES Investing in the whole corridor Existing NAP resources allocated for illegal-dumping cleanup were used to address demolition debris that had remained for roughly six months and partially obstructed the sidewalk. The cleanup reinforces a simple principle: storefront investment cannot happen in isolation from the conditions around it. The pilot has shown what targeted investment can accomplish property by property. The forthcoming NAP project gives Forged x Four the opportunity to build on that momentum across the Braddock Avenue corridor. Portgallo Peppers N'at